Why will Paddington close? Surely new station platforms underground will be built!
quote from the Crossrail document:
8.4.75 For major trackworks outside Paddington station a total blockade will be required that
will affect all services (ie
GWML▸ and local services) for a period of two weeks. Services
will also be affected by partial blockades for a week either side of the total blockade.
During this time local and GWML services will terminate at Ealing Broadway station.
The disruption to passengers at Paddington station will cause an impact of particular
importance since the blockade will affect all local and GWML services to Paddington
and passengers using the London Underground. This is also addressed in route-wide
impacts (see Chapter 7).
76
I have also included the link:
http://billdocuments.crossrail.co.uk/files/Home/Home3/01.Environmental%20Statement/Volume_02/Chapter_08_pt01.pdf