Re: No trains will call Gloucester 27 September- 5th October 2025
In "Cross Country services" [365405/30703/43]
Posted by grahame at 08:48, 10th September 2025
 
Dear Graham,
 
Between Saturday 27 September and Sunday 5 October, Network Rail will be undertaking crucial signalling upgrades at Gloucester signal box. The signal box controls trains travelling from Bristol, Worcester, Swindon and South Wales, so it’s essential it remains in good working order.
 
As a result, all train services to and from Gloucester, extending to include the wider region at weekends, will be impacted and rail replacement services will be in place for the following:
 
Cheltenham Spa and Gloucester – all dates
Worcester Foregate Street and Gloucester – weekends
Bristol Parkway and Gloucester – weekends
Kemble and Gloucester – Saturdays
Swindon and Gloucester – Sundays
Cam & Dursley and Gloucester – Monday to Friday
 
Trains between London Paddington/Swindon and Cheltenham Spa or between Bristol Temple Meads and Worcester still run Monday to Friday but won’t stop at Gloucester.
 
CrossCountry train services between Nottingham and Cardiff Central will only run to and from Cheltenham Spa on weekends, or Birmingham New Street on weekdays. Other CrossCountry trains will still be running Monday to Friday between Birmingham New Street and the South West via Worcestershire Parkway and Cheltenham Spa. At weekends, these train services can only operate in the region between Bristol Parkway and Paignton, Plymouth or Penzance. Replacement buses are planned by CrossCountry between:
 
Cheltenham Spa and Bristol Parkway (non-stop) – weekends
Worcestershire Parkway and Ashchurch for Tewkesbury – Monday to Friday
 
Transport for Wales train services will only run between Cardiff Central and Lydney instead of Gloucester or Cheltenham Spa on all dates, with replacement buses planned between Lydney and Gloucester.
 
As an alternative to replacement transport, Stagecoach will also accept valid rail tickets for travel on certain routes - please visit gwr.com/upgrade for more information and to see a map of the works.
 
All changes have been uploaded into online journey planners and we’re also making customers aware at stations and on board through announcements, station posters, and both traditional and social media.
 
Please get in touch if you have any questions and we would be grateful for any support you can provide in cascading this to your networks.
 
Kind regards,
 
Olivia & Heledd
 

Re: Weston-super-Mare - Birnbeck Pier plan 'in jeopardy' as RNLI pulls out - June 2025
In "The West - but NOT trains in the West" [365404/30411/31]
Posted by broadgage at 03:51, 10th September 2025
Already liked by Western Pathfinder
 
Use of Birnbeck pier was no doubt convenient for the RNLI as it gave access to the lifeboat house from which the lifeboat could be launched quickly and easily.
It was therefore reasonable for the RNLI to make a LIMITED contribution to the costs of maintaining or repairing the pier. They are presumably reluctant to accept liability for for unknown future costs.
A new lifeboat house would be cheaper.

Re: The Consultation is On!
In "Fare's Fair" [365403/19894/4]
Posted by grahame at 03:44, 10th September 2025
 

Remember - 10th September 2018 is the closing date of the real consultation.



And, seven years later .... I still found myself explaining far too many overlapping and complex options on something as simple as a day out to Weymouth, offered a headline single fare Bristol to Melksham that's three quarter of the cost of a whole day out that took me to Swindon, to the Severn and to Weymouth, and refused as the barrier at Bath Spa on a barcoded and valid ticket sold that same morning on the train from Melksham, almost missing my bus as a result.

Re: [otd] 9th September 2006 - Last commuter train (for over 7 years) to Melksham
In "TransWilts line" [365402/29131/18]
Posted by grahame at 03:00, 10th September 2025
Already liked by matth1j, Chris from Nailsea
 
This page isn’t working
grahamellis.uk is currently unable to handle this request.
HTTP ERROR 500

 

Same for me. Blimey, if grahamellis is unable to handle this request, "we're all doomed!"


Looks like I screwed something up in the final edit ... seeing if I can stop it; not obvious. Let me grab a coffee and then look.

Single quote out of place - looks like I inserted it by mistake on my very final save last night!
 
Should now work at https://grahamellis.uk/writings/hm974.html ... adding in other work there over the next couple of days so you may see occasional changes as the archive arrives, and perhaps errors as I test new lumps of code

Re: [otd] 9th September 2006 - Last commuter train (for over 7 years) to Melksham
In "TransWilts line" [365401/29131/18]
Posted by grahame at 02:53, 10th September 2025
 
This page isn’t working
grahamellis.uk is currently unable to handle this request.
HTTP ERROR 500

 

Same for me. Blimey, if grahamellis is unable to handle this request, "we're all doomed!"


Looks like I screwed something up in the final edit ... seeing if I can stop it; not obvious. Let me grab a coffee and then look.

Re: [otd] 9th September 2006 - Last commuter train (for over 7 years) to Melksham
In "TransWilts line" [365400/29131/18]
Posted by Chris from Nailsea at 23:27, 9th September 2025
Already liked by matth1j, lympstone_commuter
 
Same for me. Blimey, if grahamellis is unable to handle this request, "we're all doomed!"

Re: Northern Powerhouse Rail - plans for east to west high speed rail links
In "The Wider Picture in the United Kingdom" [365399/30707/51]
Posted by Kernow Otter at 22:59, 9th September 2025
 
Have long thought that the better use of funds would be to 'level up' the whole of the network before embarking on new builds.  Electrification, line speed improvements, fully regional freight facilities, service frequency....

When everywhere is at the same level,  then perhaps invest in high speed lines.

Re: Camping coaches
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [365398/22085/47]
Posted by eightonedee at 22:43, 9th September 2025
 
..or, in East Yorkshire, Skipwith Station - https://www.skipwithstation.com/skipwith-railway-carriage-accommodation-york/

Re: [otd] 9th September 2006 - Last commuter train (for over 7 years) to Melksham
In "TransWilts line" [365397/29131/18]
Posted by matth1j at 22:42, 9th September 2025
 
This page isn’t working
grahamellis.uk is currently unable to handle this request.
HTTP ERROR 500

 

Re: Northern Powerhouse Rail - plans for east to west high speed rail links
In "The Wider Picture in the United Kingdom" [365396/30707/51]
Posted by eightonedee at 22:33, 9th September 2025
 
"Across Europe, every other country connects its big cities by modern high-speed rail," said Greater Manchester's Labour mayor. "

Hmmm....the German purpose-built lines is very much a patchwork of partial links, with Munich lacking any complete high-speed line to any other major city. Better than the UK, but still nothing like France or Spain, for example.

Re: Oxford station - facilities, improvements, parking, incidents and events - merged posts
In "London to Didcot, Oxford and Banbury" [365395/593/9]
Posted by ChrisB at 20:31, 9th September 2025
 
The earliest that EWR was going to be ready was late this month - and its still slated for the December timetable, allowing further time for driver training & Winslow station fit out. It can still work on 2tph to MKeynes without the extra platform, using platforms 1 & 2

Re: When is the emergency alert test on mobile phones and can you opt out?
In "The Wider Picture in the United Kingdom" [365394/30696/51]
Posted by Surrey 455 at 20:27, 9th September 2025
 
I received the alert as an alarm then followed by a message being read out in an English accent (with a bit of Welsh at the end).

This was on a Xiaomi phone which has a setting to turn on/off the alerts but doesn't appear to have a setting to customise the spoken bits. Two of my work colleagues confirmed that they received the alarm only without a spoken message.

Re: Weston-super-Mare - Birnbeck Pier plan 'in jeopardy' as RNLI pulls out - June 2025
In "The West - but NOT trains in the West" [365393/30411/31]
Posted by ChrisB at 20:16, 9th September 2025
 
Your answer - as a RNLI station, hence them putting that amount in?

Re: Oxford station - facilities, improvements, parking, incidents and events - merged posts
In "London to Didcot, Oxford and Banbury" [365392/593/9]
Posted by ray951 at 19:49, 9th September 2025
 
if the 5th platform/ western station entrance isn't delivered then hasn't replacing the Botley Road bridge been a complete waste of money, certainly for rail and , given all the disruption, for Oxford itself?

Is there any point putting any more money into the railway industry, certainly in Oxfordshire, given the following:

A service pattern at Oxford that is worse than before Covid (XC , GWR and Chiltern) despite an increase in population.
Delays to running passenger trains on EWR despite the railway being open for nearly a year (alleged Union issues).
An incomplete extension to Oxford station.
An electrification scheme that is half complete.

How can the industry be stopped from continually over promising and under delivering?
As an outsider seems like the industry needs a complete shakeup.

Re: Camping coaches
In "Heritage railways, Railtours, buses, canals, steamships and other public transport based attractions" [365391/22085/47]
Posted by Kernow Otter at 18:27, 9th September 2025
 
Not forgetting https://www.tamarbelle.co.uk/accommodation.php at Bere Alston.

Re: Westbury White Horse - historic Wiltshire landmark
In "The Wider Picture in the United Kingdom" [365390/30708/51]
Posted by Timmer at 17:36, 9th September 2025
Already liked by Western Pathfinder
 
It was always going to happen. Wouldn’t surprise me if it reappears again.

Re: London Underground - industrial action by RMT, early September 2025
In "Transport for London" [365389/30605/46]
Posted by grahame at 16:59, 9th September 2025
 
From the BBC:


Claire Mann, TfL's chief operating officer, said she was "bitterly disappointed" the strike went ahead, calling the demands "unaffordable and impractical".



Known to many of us as MD of SWR from 2020 to 2024.  Thought the name looked familiar.  She was in charge at SWR at the time they withdrew their trains from Bradford-on-Avon and Trowbridge.

Re: London Underground - industrial action by RMT, early September 2025
In "Transport for London" [365388/30605/46]
Posted by Chris from Nailsea at 16:49, 9th September 2025
 
From the BBC:

More Tube disruption as RMT union talks collapse


Nearly all London Underground services are suspended during the industrial action

Industrial relations on London Underground have "totally collapsed", a union leader has warned, amid a strike by Tube workers that virtually shut down the network.

It means travellers in London will continue to face disruption as thousands of members of the union take strike action over pay and working hours.

Rail, Maritime and Transport (RMT) union leader Eddie Dempsey said the negotiations became fruitless after the union uncovered Transport for London (TfL) plans to shut Elizabeth line ticket offices - something TfL denies.

Mr Dempsey said further disputes loomed over those alleged proposals as well as pay and conditions of cleaners.


Tube trains remained parked in depots on Tuesday, as the network came to a virtual standstill

With the exception of the Northern line, running a reduced timetable, all Tube services were suspended on Tuesday.

The Docklands Light Railway (DLR) has also shut down due to a strike by RMT union members as part of of a separate dispute.

TfL said it had made a "fair" pay offer of 3.4% and that the the union's demand for a shorter working week of 32 hours was "unaffordable".

Claire Mann, TfL's chief operating officer, said she was "bitterly disappointed" the strike went ahead, calling the demands "unaffordable and impractical".

London Mayor Sir Sadiq Khan said he urged the RMT to get around the table with TfL to resolve the dispute.

Downing Street has also called on the RMT union and TfL to get back to the negotiating table to end the strike.

People trying to get around the capital turned to buses, boats, bikes, cars and walking routes, with many struggling to reach their destinations.

BBC newsgathering journalists reported Elizabeth line, Overground, rail and walking routes to be far less busy than they were on Monday.

At the start of the working week, TfL said footfall on London Overground and Elizabeth line services increased by 31%, noting that these lines had likely been absorbing displaced Tube passengers.

Long queues were seen at bus stops in central London, while bike rental schemes Lime, Forest and Santander reported increased uptake on Monday.


Re: [otd] 9th September 2006 - Last commuter train (for over 7 years) to Melksham
In "TransWilts line" [365387/29131/18]
Posted by grahame at 16:07, 9th September 2025
Already liked by matth1j
 
A further year ...

http://www.wellho.net/mouth/974_The-last-commuter-train-through-Melksham.html

The last commuter train through Melksham

[snip]

* Biggest issue is still reliability. The weekend just gone there should have been 14 round trips, but only 7 ran.  Passenger numbers up from 3,000 journeys per annum to / from Melksham to around 70,000 at present but it should be 400,000.   70,000 is a lot of journeys, but I still talk in the community to more people who don't use Melksham Station than who do, citing lack of reliability and thinness of timetable as their top two reasons to not do so.  Third reason is unfriendliness of station access. No concerns over safety or comfort of train, nor at fare level.


And how sad that GWR have not sorted out the reliability issue. 



I have a lot of old material in the archives ... and I am starting to provide centralised secure access to them.  First link to the 19 year old page with a lick of paint is at  https://grahamellis.uk/writings/hm974.html

Westbury White Horse - historic Wiltshire landmark
In "The Wider Picture in the United Kingdom" [365386/30708/51]
Posted by Chris from Nailsea at 15:41, 9th September 2025
 
From the BBC:

White horse checked for any damage caused by flag



A white horse carved into a hillside is being checked for damage after it was temporarily turned into a St George's flag.

Red fabric draped over the Westbury White Horse has now been removed, after being reported to English Heritage earlier. The body said it would assess whether the 175ft (53m) tall Wiltshire landmark had been damaged by pegs used to secure the fabric.

It is not clear who put the ribbon up or why - but it is not the first time this has happened. In 2018, red plastic was put up on the monument ahead of the England men's football World Cup semi-final match.

Thousands of St George's flags have appeared across England in recent months. While some football fans were flying them to cheer on the Lionesses during the 2025 Euros, many more flags have gone up in recent weeks.

Some groups responsible for putting them up have told BBC News they are motivated by pride and patriotism. But some people have said it feels provocative at a time when tensions are running high across England over the issue of immigration.



Speaking about the Westbury incident before the removal, an English Heritage spokesperson said: "Red fabric has been attached to the Westbury White Horse. We'll be removing it as soon as we can and seeing whether the pegs that were used have caused any damage to this much-loved historic landmark."

Westbury's white horse is said to be the oldest in Wiltshire. It was restored in 1778, but many believe it is much older than that.

Westbury Town Council said it was aware of the incident and Wiltshire Police said no criminal offences were thought to have been committed and the force was not investigating.


Northern Powerhouse Rail - plans for east to west high speed rail links
In "The Wider Picture in the United Kingdom" [365385/30707/51]
Posted by Chris from Nailsea at 15:14, 9th September 2025
 
From the BBC:

Reform 'would scrap' high-speed northern rail line

A Reform UK government would scrap plans to build the Northern Powerhouse Rail (NPR) link, its deputy leader has said.

In a report to the right-leaning Policy Exchange think tank, Richard Tice said companies considering bidding for contracts to build east-to-west high-speed rail links should "not bother".

Greater Manchester Mayor Andy Burnham rejected Tice's comments and suggested Reform UK wanted a "second-class railway" for the north of England.

The government also said northern England had been stuck with "second-rate" transport links for too long, and that this was "leaving communities cut off and holding back growth".

The NPR is a project to boost rail services going east to west across northern England, and was first proposed by former Tory chancellor George Osbourne in 2014 before being shelved under Boris Johnson's administration.

Labour is expected to announce the return of the scheme within the next few weeks.

Tice said a Reform UK government would "spend the money instead on things the country needs more". Citing the "billions in overspending" related to HS2, he described the government's expected commitment to more high-speed rail links as "insanity".

The Policy Exchange report proposed a set of alternative schemes, including a Manchester version of London's Elizabeth Line. It predicted NPR would be an "even greater train crash" than HS2, as a new line between Liverpool and Manchester could cost £30bn.

Researchers warned journeys between the cities on this line would take one minute longer than the fastest current services - which are 34 minutes - because it would also serve Manchester Airport.

Policy Exchange claimed the "crisis in HS2 is even worse than ministers admit", as the "true cost" for the line between London and Birmingham is "up to 22%" higher than the amount declared to Parliament.

A spokesperson for HS2 Ltd said: "We do not recognise these claims. HS2 Ltd is committed to the highest levels of transparency and our accounts are extensively audited by the National Audit Office."

Tice said: "Even as the historic disaster of HS2 blows through more billions in overspending and more years of delay, even as it sucks money from things the country actually needs, even as taxes on people and business rise, ministers are about to commit to further high-speed rail schemes which could make HS2's problems and price tag look trivial."

But Burnham said Tice and Reform UK leader Nigel Farage were both "creatures of the London establishment" and he was not "surprised in the slightest" to hear of their opposition to NPR. "Across Europe, every other country connects its big cities by modern high-speed rail," said Greater Manchester's Labour mayor. "But, like the Conservatives before them, the Reform party seems to believe that this should be a privilege only conferred on the southern half of the UK. We have higher ambitions for the North than them."

A Department for Transport spokesperson said: "The North has been stuck with second-rate transport for too long, leaving communities cut off and holding back growth. The government is delivering the transport infrastructure needed for faster and more reliable journeys to create jobs and deliver stronger growth – such as the Transpennine Route Upgrade which is already delivering more efficient journeys between Manchester, Huddersfield, Leeds and York. We will set out our ambitions for Northern Powerhouse Rail in the near future."


Re: Weston-super-Mare - Birnbeck Pier plan 'in jeopardy' as RNLI pulls out - June 2025
In "The West - but NOT trains in the West" [365384/30411/31]
Posted by Western Pathfinder at 15:04, 9th September 2025
Already liked by Timmer
 
Not at all surprised at the actions of the lifeboat institution deciding to walk away,what did surprise me was that so much of the funding for this was down to the RNLI .
They are after all a charity,and one that sadly is underfunded at the best of times,as for the council is this pier really worth the expense and what purpose would it be fit for if reopened?
Could it reasonably be expected to recoup some of the expenses,and what about ongoing running costs ?
And whilst I realise that it would a nice thing to have the use of ,with things  the way they are it's hard to find the justification....

Re: OCC Consultation on Rail in Oxfordshire - Closes Oct 1st
In "London to Didcot, Oxford and Banbury" [365383/30686/9]
Posted by ChrisB at 14:33, 9th September 2025
 
Doesn't appear so.

And it's an Oxfordshire plan, not a wider Thames Valley plan.

Re: Oxford station - facilities, improvements, parking, incidents and events - merged posts
In "London to Didcot, Oxford and Banbury" [365382/593/9]
Posted by ChrisB at 14:32, 9th September 2025
 
So, other than Botley Road, everything else planned is now under a further cost review process & redesign to fit costs

Re: A fear of driving / on the rise
In "Media about railways, and other means of transport" [365381/30694/49]
Posted by ChrisB at 14:24, 9th September 2025
 
That's why it often bungs up as you approach a busy on-slip - no, it's not an accident, it's joining traffic.

Re: North Cotswold line delays and cancellations - 2025
In "London to the Cotswolds" [365380/29711/14]
Posted by Worcester_Passenger at 14:23, 9th September 2025
 
11:52 London Paddington to Hereford due 14:44 will be terminated at Great Malvern.
It has been delayed at London Paddington and is now 10 minutes late.
This is due to a broken down train earlier today.
Last Updated:09/09/2025 13:53
Departed +17, having arrived late from the depot. Arrived Great Malvern +29 (so just ahead of the WMR train) and cancelled thereafter.

15:18 Hereford to London Paddington due 18:29 will be started from Malvern Link.
This is due to a broken down train earlier today.
Last Updated:09/09/2025 13:53
Starting from Malvern Link must be a mistake - RTT reports that it started from Great Malvern.

1W25 1252 London Paddington to Worcester Foregate St : arrived Shrub Hill +17 and cancelled thereafter

15:18 Worcester Foregate Street to London Paddington due 17:29 will be started from Worcester Shrub Hill.
This is due to train crew being delayed.
Last Updated:09/09/2025 14:57

Re: Oxford station - facilities, improvements, parking, incidents and events - merged posts
In "London to Didcot, Oxford and Banbury" [365379/593/9]
Posted by stuving at 14:22, 9th September 2025
 
What with all the epic difficulties Network Rail have encountered in growing their bridge, the rest of the station development has been "paused". (I think that's even more serious than "float erosion", which the walkway work was suffering from.)

At NR's presentation to councillors in July, there was just a short section at the end about the rest of the program "after the bridge is done".
Indicative Rail Scope

Future works to enable East West Rail. These are expected to include the provision
of new Platform 4/5 and a Western Entrance required to support increased train
services and passenger numbers.

Construction of remaining rail scope paused to allow full focus on re-opening
Botley Road as early as possible.

Works progressing well to re-phase future rail works. Key areas of focus:
• Validation of value for money following historic cost increase (associated
with Botley Road), whilst maintaining core functionality.
• Validation of programme and price ahead of securing funding.
• Increasing delivery certainty – undertaking additional surveys and
progressing key areas of design.

Indicative Schedule - Subject to funding release (originally a graphic)
2025   • Increase delivery confidence.
           • Validate scope, price and programme.
           • Secure funding.
 2026   • Construct Platform 4/5, Western Entrance and associated highways works.
 2027   • Complete Western Entrance design.
           • Onboard contractor.

And last Friday, NR posted a tender for "Oxford - Architect Services". This is looking for:
Scope
Reference
project_43822

Description

Network Rail is seeking to appoint a suitably qualified and experienced architectural practice to lead the design and planning application for the redevelopment of Oxford Station and its surrounding area. This commission forms a critical part of the Oxford Station Masterplan, which aims to deliver a new vision for the station environment, supporting Oxford's growth as a national rail hub and global innovation centre.

Scope of Services:

• Masterplanning: Develop and evolve previous scheme proposals to create a new, mixed-use masterplan that maximises value, integrates operational railway requirements, and aligns with Oxford City's development and regeneration aspirations.

• Design Leadership: Act as lead architect for the masterplan, coordinating with specialist consultants and stakeholders to deliver a comprehensive design solution, including station entrances, public realm, multi-storey car park, cycle hub, offices, life sciences, hotel, and residential elements.

• Planning Application: Prepare and submit a detailed planning application for Phase 1, including all necessary supporting documents, reports, and stakeholder engagement as required by the local planning authority.

• Stakeholder Engagement: Collaborate with Oxford City Council, Oxfordshire County Council, Network Rail, train operating companies, and other key stakeholders throughout the design and planning process.

• Sustainability: Embed best practice in environmental, social, and governance (ESG) objectives, targeting high levels of certification (e.g., BREEAM, WELL, NABERS, BNG, embodied carbon).

Key Deliverables:

• A new illustrative masterplan for the Oxford Station area, including phasing and delivery strategy.

• RIBA Stage 2+ design report for the first phase of development.

• Full planning application for Phase 1, including all required technical and supporting documentation.

• Coordination and integration of specialist inputs (e.g., transport, sustainability, heritage, engineering).

• Ongoing design and technical support through the planning determination period.

The contract will be let under the NR26 NEC4 Professional Service Short Contract (PSSC).

The scope of this procurement covers the development of the Oxford Station Masterplan and the delivery of a detailed planning application for Phase 1. Phase 2 services are entirely optional and may not be instructed. Any extension to include Phase 2 will be subject to separate approval and explicit instruction by Network Rail. The estimated total value stated in this notice is inclusive of both Phase 1 and the optional Phase 2. The initial contract will be awarded for Phase 1 only, with any extension to include Phase 2 subject to formal instruction by Network Rail.

Full details of the scope, deliverables, and requirements are provided in the procurement documents within the tender Pack.

So, as that tender pack is only for registered bidders, we don't know what and how much station is still part of the programme.

Re: 2025 - Service update and amendment log, Swindon <-> Westbury
In "TransWilts line" [365378/29726/18]
Posted by grahame at 14:11, 9th September 2025
 
13:14 Swindon to Westbury due 13:57

13:14 Swindon to Westbury due 13:57 is being delayed between Melksham and Trowbridge and is now expected to be 8 minutes late.
This is due to a broken down train earlier today.

Re: Reversals mid-line. Watch Battersby for Combe and Bere Alston?
In "Shorter journeys in Plymouth and Cornwall" [365377/30706/25]
Posted by Trowres at 12:47, 9th September 2025
Already liked by rogerw
 
This article: https://www.thisisthecoast.co.uk/news/local-news/signalling-innovations-could-improve-esk-valley-railway-service/

suggests that various options for resignalling are being considered as a replacement for No-signalman-key-token.

Whitby is an attractive destination, but it is seriously harmed by summer traffic and parking issues. At the moment the railway is unable to offer much in the way of mitigation.

Re: A fear of driving / on the rise
In "Media about railways, and other means of transport" [365376/30694/49]
Posted by Trowres at 12:34, 9th September 2025
 
The number of drivers who seem to think they have right of way joining motorways/dual carriageways is quite scary.

Nightmare! Or those already on the motorway who don't move over a lane when approaching an on-slip so that traffic can join....nor those joining who think they can join at 30mph & pick up speed after joining.....

The Highway Code's advice on joining the motorway:
  • give priority to traffic already on the motorway
  • check the traffic on the motorway and match your speed to fit safely into the traffic flow in the left-hand lane
  • not cross solid white lines that separate lanes or use the hard shoulder

If the traffic in the left-hand lane of the motorway is travelling at the minimum safe separation (a somewhat optimistic assumption on a busy motorway) then any joining traffic will be creating two separations of less than half the minimum safe distance. Doesn't that mean it's impossible to "fit safely into the traffic flow" ? (unless traffic on the motorway can change lane to accommodate joiners - not always possible at busy times.

Asking drivers to do the impossible? - rather different safety culture from rail? 

 
The Coffee Shop forum is provided by customers of Great Western Railway (formerly First Great Western). The views expressed are those of the individual posters concerned. Visit https://www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site at admin@railcustomer.info if you feel that the content provided by one of our posters contravenes our posting rules. Our full legal statment is at https://www.greatwesternrailway.info/legal.html

Although we are planning ahead, we don't know what the future will bring here in the Coffee Shop. We have domains "firstgreatwestern.info" for w-a-y back and also "greatwesternrailway.info"; we can also answer to "greatbritishrailways.info" too. For the future, information about Great Brisish Railways, by customers and for customers.
 
Current Running
GWR trains from JourneyCheck
 
 
Code Updated 11th January 2025