With my current commute to the TLP project HQ▸ I wish Crossrail was in place now; Maidenhead to Farringdon change to Thanes link to Blackfriars via exit the South Bank exit 5 min walk.
The connectivity both Crossrail and TLP will give at the end of this decade is vast ............ Maidenhead Crossrail (just for example) to Bedford, Gatwick, Brighton, Cambridge, Peterborough, Sevenoaks all with just one change at Farringdon.
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
Surrey 455
|
|
« Reply #451 on: August 14, 2014, 22:18:19 » |
|
* Staines, from West Drayton very interesting could link with proposals for T5 Staines link but probaly easier via T5 if link built.
West Drayton to Staines branch currently only has track as far as Colnbrook I believe. Much of the section along Staines Moor (I think) without track is now overgrown and parts can be walked along. I did just that a few years back. The aborted Airtrack proposals suggested a link from Staines to T5 along the old route although I seem to remember that it would not have followed that route that faithfully.
|
|
|
Logged
|
|
|
|
|
tom m
|
|
« Reply #453 on: August 15, 2014, 10:33:59 » |
|
The old line terminates at Colnbrook here, you can see the rest of it continue (somewhat overgrown) the other side of the road: www.google.co.uk/maps/@51.479147,-0.509111,3a,75y,5.07h,77.55t/data=!3m4!1e1!3m2!1suxaPt2mnViMmpBtc8-sSzw!2e0?hl=en I believe it was used for quite a lot of the T5 construction traffic.
|
|
« Last Edit: August 15, 2014, 10:39:38 by tom m »
|
Logged
|
|
|
|
stuving
|
|
« Reply #454 on: August 15, 2014, 11:14:02 » |
|
The old railway alignment across Staines Moor is partly lost under the M25, so Airtrack would have largely been new - with a flat junction on the Windsor branch and the old bridge reconstructed for a bridleway. Local response was not favourable, based on environmental and amenity arguments. The London & SE RUS▸ recommended this new line to Staines being done on its own as Option J1J3, for possible delivery in CP5▸ (really?). They give the following arguments (option J1 is Airtrack): Heathrow Airport Western connection (South): Recommended for detailed consideration, as an incremental step towards Option J1. Would enable up to 4tph Crossrail semi-fast services to be extended to Staines over a new line. Which is odd, as the real benefit is to give better links into Heathrow from most of the SWT▸ service area, so it's worth doing on its own. At the time of the Airtrack TWAO▸ , I wondered why they didn't split it into one for the T5-Staines line on that basis, leaving all the arguments about the wider service pattern and the Staines Chord to a separate TAWO.
|
|
« Last Edit: September 05, 2014, 22:33:01 by stuving »
|
Logged
|
|
|
|
Electric train
|
|
« Reply #455 on: August 15, 2014, 17:18:09 » |
|
The old railway alignment across Staines Moor is partly lost under the M25, so Airtrack would have largely been new - with a flat junction on the Windsor branch and the old bridge reconstructed for a bridleway. Local response was not favourable, based on environmental and amenity arguments. The London & SE RUS▸ recommended this new line to Staines being done on its own as Option J1, for possible delivery in CP5▸ (really?). They give the following arguments (option J1 is Airtrack): Heathrow Airport Western connection (South): Recommended for detailed consideration, as an incremental step towards Option J1. Would enable up to 4tph Crossrail semi-fast services to be extended to Staines over a new line. Which is odd, as the real benefit is to give better links into Heathrow from most of the SWT▸ service area, so it's worth doing on its own. At the time of the Airtrack TWAO▸ , I wondered why they didn't split it into one for the T5-Staines line on that basis, leaving all the arguments about the wider service pattern and the Staines Chord to a separate TAWO. Nice as a concept to extend Crossrail to Staines the only draw back is the Crossrail stock is not be built dual voltage it is 25kV OLE▸ only; the third rail option for the stock was kicked well into touch when it was decided to rebuild Connaught Tunnels. The big draw back to Airtrack was the amount of time the level crossings at Houndslow etc would be closed to road traffic
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
John R
|
|
« Reply #456 on: September 05, 2014, 22:10:18 » |
|
Mention of WRAtH▸ on another thread got me thinking, how many Crossrail trains could end up being built?
The initial order is for 65 x 9 car sets, ie 585 vehicles, with an option for a further 18 sets.
1. I believe an extra 2 will be required for the Reading extension. Then it's not inconceivable that the HEx will be replaced by Crossrail, and linked to WRAtH. That would need another 8 units in service, as the journey time from PAD» to Reading via Heathrow would be around 50 mins. So western extensions could mean another 11 sets in total given 90% availability.
2. The interesting one is the north west extension to Watford and Tring. Assuming 3 tph to each might require another 10 units in service, so another 11 required.
3. There's also the possibility of increasing the central frequency from 24 to 30 tph. If these extra workings were short (ie central section only), then maybe another 5 units would be sufficient.
That would give 92 sets, which could also end up being lengthened to 11 cars, ie 1012 cars in total, a big increase on the original order.
The 18 already optioned may will be with the possibility of 1 and 3 in mind, although I suspect that 2 was too much of a long shot during contract negotiations to be considered. But it seems very possible that Derby will end up with quite a long run of Crossrail stock beyond the initial contract award.
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #457 on: September 06, 2014, 08:18:41 » |
|
Another question to ask is whether the (current/proposed currently) deot space could cope with your suggestion:"(s)?
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #458 on: September 06, 2014, 11:02:53 » |
|
The new OOC▸ depot will only have capacity for 10 car trains with no room for extension.
|
|
|
Logged
|
|
|
|
Chris from Nailsea
|
|
« Reply #459 on: September 22, 2014, 22:23:52 » |
|
From the Telegraph: Isambard Kingdom Brunel's Great Western Railway foundations uncovered at PaddingtonFoundations exposed near London Paddington station by Crossrail workers include a 200m engine shed and 45ft turntable.Archaeologist Gary Evans working in an inspection pit used by the Great Western Railway Photo: Philip Toscano/PA▸ Victorian railway foundations laid by Isambard Kingdom Brunel have been uncovered for the first time in a century by engineers working on the Crossrail project. Remains of train turntables, a workshop and a 200m long engine shed dating from the 1850s were uncovered near London^s Paddington Station. The buildings were used for Brunel^s Great Western Railway, a broad-gauge railway which carried its first steam trains in 1838, but were levelled in 1906 to make way for a storage yard. Starting in 2018 the area to the east of Westbourne Park underground station, known as Paddington New Yard, will host Crossrail tracks and sidings as well as a replacement facility for 150 buses and a cement factory. A oil and gas cover used by the Great Western Railway in the 1850s (PA)The historic engine shed foundations reveal evidence of the shift in use from 7ft wide broad-gauge train tracks, used by the Great Western Railway, to standard gauge tracks which were prescribed by Parliament in 1846 ^ a change initially opposed by Brunel. The engine shed, measuring 202m long with four tracks and inspection pits, was built at Westbourne Park ahead of the opening of Brunel^s new Paddington station in 1854. The 45ft turntable, dating from 1881-82, was built at the Great Western Railways works at Swindon before being installed at the western entrance to the engine shed. A wrought iron turning circle within the brick foundations allowed both broad and standard gauge engines to be turned, allowing them access to the shed. Archaeologist Gary Evans checks rail tracks used by the Great Western Railway (PA)Crossrail workers are using laser scans to create 3D computerised models of the buildings to preserve the historical evidence of Brunel^s work and of the early development of railways in Britain. Jay Carver, Crossrail^s Lead Archaeologist said: ^Isambard Kingdom Brunel^s Great Western Railway is the most complete early mainline railway in the world. Whenever we expose parts of the original infrastructure it is vital to record these for posterity and the history of rail in this country. Using the latest 3D scan technology provides a permanent and accurate model Brunel^s distinctive architectural legacy.^
|
|
|
Logged
|
William Huskisson MP▸ was the first person to be killed by a train while crossing the tracks, in 1830. Many more have died in the same way since then. Don't take a chance: stop, look, listen.
"Level crossings are safe, unless they are used in an unsafe manner." Discuss.
|
|
|
Jason
|
|
« Reply #460 on: September 23, 2014, 10:41:47 » |
|
|
|
|
Logged
|
|
|
|
JayMac
|
|
« Reply #461 on: September 25, 2014, 13:13:28 » |
|
From the Railway Gazette: Knorr-Bremse to supply Crossrail platform screen doorsUK▸ : Crossrail Ltd announced on September 23 that it had selected Knorr-Bremse Rail Systems (UK) Ltd as preferred bidder for contract C631, covering the supply of platform screen doors for seven underground stations. Contract value ^is in the region of ^28m^, says Crossrail. Knorr-Bremse is to supply full-height platform screen doors with a total length of 4 km, to be installed at the Crossrail stations at Paddington, Bond Street, Tottenham Court Road, Farringdon, Liverpool Street, Whitechapel, Canary Wharf and Woolwich. Design and development, as well as manufacture of the operating system, is to take place at the Knorr-Bremse plant in Melksham. Assembly and testing is to be carried out at the former Railcare works in Wolverton. ^Crossrail has now awarded the last of the major railway systems contracts^, said Crossrail Programme Director Simon Wright. ^As major construction concludes, work will get underway to fit out the new tunnels and stations^, including ^over 40 km of track, power equipment as well as signalling, ventilation and drainage^. Faiveley Transport and Singapore Technologies Electronics were also shortlisted for contract C631.
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
NickB
|
|
« Reply #462 on: September 25, 2014, 15:43:49 » |
|
Thats ^7000 per metre.
|
|
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #463 on: September 25, 2014, 18:16:26 » |
|
Thats ^7000 per metre. Yes, but despite the Knorr handle, they are not a stock item.
|
|
|
Logged
|
Now, please!
|
|
|
Chris from Nailsea
|
|
« Reply #464 on: September 25, 2014, 18:25:43 » |
|
|
|
|
Logged
|
William Huskisson MP▸ was the first person to be killed by a train while crossing the tracks, in 1830. Many more have died in the same way since then. Don't take a chance: stop, look, listen.
"Level crossings are safe, unless they are used in an unsafe manner." Discuss.
|
|
|
|