IndustryInsider
|
|
« Reply #405 on: August 07, 2014, 10:19:06 » |
|
Along with the Reading extention, this would make much better use of the eastern end of the Crossrail route and (presumably) mean fewer Crossrail trains to/from Shenfield/Abbey Wood only running to/from Paddington.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
paul7575
|
|
« Reply #406 on: August 07, 2014, 10:34:25 » |
|
Along with the Reading extention, this would make much better use of the eastern end of the Crossrail route and (presumably) mean fewer Crossrail trains to/from Shenfield/Abbey Wood only running to/from Paddington.
The overall London and SE proposal for Crossrail includes 10 tph to Heathrow, subsuming Hex, 6 tph up the GW▸ , and the 8 tph I mentioned to the WCML▸ , so that soaks up the whole of the 24 tph. In which case I'd expect the Westbourne Park turn back would become an off-peak only facility. In which case why not move the turnback to somewhere nearer the CR depot - its layout will probably need to be re-planned anyway if as I expect the additionalWCML link will affect it... Paul
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #407 on: August 07, 2014, 10:38:58 » |
|
Yes, I'm guessing a third set of lines continuing from where lines 1-6 end through the route taken by the current reception lines where the old Kensal Green wash plant was located. Probably only fairly minor works required to turn them into passenger lines? Interestingly, that area is currently being widened anyway, with a slope down to the old wash plant removed and the concrete retaining wall rebuilt a few metres further back.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
eightf48544
|
|
« Reply #408 on: August 07, 2014, 11:27:33 » |
|
I have always thought turning back 14 out of 24tph at Padd was not agood idea.
I'm not sure however if the Relief lines to Hayes can take 10 tph to Heathrow plus 6 to Reading. I thought 10tph was the limit. Another 6 would eliminte all the daytime freight paths to Acton which presumably everyone would deplore as we all want to see an increase in Rail Freight.
|
|
|
Logged
|
|
|
|
John R
|
|
« Reply #409 on: August 07, 2014, 11:30:44 » |
|
This is a really sensible move, though I worry that it will be leapt upon by the Anti HS2▸ campaign as another example of cost creep to facilitate HS2 (Euston rebuild). The reality is that it stands on its own two feet. All predictions are that London's population will continue to grow and existing tube lines will struggle to cope in the next 10 to 20 years. This enhancement will provide relief particularly to the north eastern quadrant of the circle line, and other routes radiating from Euston. Relief that will be sorely needed once HS2 is up and running, but will be regardless.
|
|
|
Logged
|
|
|
|
Oxonhutch
|
|
« Reply #410 on: August 07, 2014, 15:24:47 » |
|
|
|
|
Logged
|
|
|
|
paul7575
|
|
« Reply #411 on: August 07, 2014, 16:01:04 » |
|
Loads of info there, but AFAICS▸ it is just a third party input to the London and SE consultation, although it can be found on NR» 's website it isn't necessarily indicative of NR's current thinking, if at all. Paul
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #412 on: August 07, 2014, 18:40:13 » |
|
My belief is this is to take trains out of Euston to make the rebuild for HS2▸ easier, also if the Watford Overground dc services were terminated at Willesden Jcn this would give even more spare capacity.
It does make sense actually to run the Tring / London locals through Crossrail, even better if an inter change station is built at OOC▸ with HS2, NNL, Central Line and West London Line
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
paul7575
|
|
« Reply #413 on: August 07, 2014, 20:30:33 » |
|
My belief is this is to take trains out of Euston to make the rebuild for HS2▸ easier, also if the Watford Overground dc services were terminated at Willesden Jcn this would give even more spare capacity.
Helping the Euston rebuild is a secondary benefit (albeit an important one) - but the gap the proposal in the RUS▸ is dealing with is basically WCML▸ capacity. They mention inter alia that it works without HS2 somewhere as well. 8.3.8 The standalone scheme would improve journey times to and from Central London for most passengers currently using the affected WCML services and reduce crowding on the public transport network feeding the Euston area, particularly the Underground. 8.3.9 Implementation of the scheme in conjunction with HS2 would also generate these benefits, at a higher level than the standalone scheme. The business case analysis does not include any temporary benefits associated with HS2 engineering works in the Euston station area. In the analysis of option K1 they also mention this: "The resulting 8tph via Watford Junction to Crossrail would replace most slow line services to London Euston", suggesting that they aren't just proposing a couple of services to Tring... Paul.
|
|
|
Logged
|
|
|
|
eightf48544
|
|
« Reply #414 on: August 08, 2014, 10:16:27 » |
|
If they are going to run Crossrail to Tring (why not Milton Keynes?) it does bring up the whole question of toilets and sideways seating!
The Milton Keynes suggestion is a stone in the pond, thinking of connections to East West etc.
|
|
|
Logged
|
|
|
|
stuving
|
|
« Reply #415 on: August 08, 2014, 10:20:33 » |
|
Here are reports of the unsurprise ministerial announcement from the BBC» and DfT» . Government launches study into potential Crossrail extension From:Department for Transport and The Rt Hon Patrick McLoughlin MP▸ History:Published 7 August 2014
Plans would see faster rail services for Hertfordshire passengers and pave the way for a more ambitious redevelopment of Euston station.Rail passengers in Hertfordshire could benefit from quicker services that are more direct into central London.
In a move that would boost ambitious plans to redevelop Euston station for HS2▸ , a feasibility study will look at how passengers from key commuter towns such as Tring, Hemel Hempstead, Harrow and Watford could save up to 15 minutes on their journey times via a new rail link between Old Oak Common and the West Coast Main Line.
The proposed changes would see Crossrail services extended to the county, providing direct journeys into the City and the West End. It would mean passengers would no longer have to change at Euston, making it easier to get on with the massive job of rebuilding the station so it matches the standard of Kings Cross and St Pancras.
The announcement came as Transport Secretary Patrick McLoughlin visited Farringdon station today (7 August 2014), where he met with the 100th apprentice appointed by Crossrail contractor Bam Ferrovial Kier to work on Europe^s largest infrastructure project.
Transport Secretary Patrick McLoughlin said:
We are investing record amounts to build a world-class railway, so it is vital we seize every opportunity to make the most of these once in a generation schemes. That is why I have asked HS2 Limited to work closely with the Crossrail sponsors to look at extending Crossrail services to key destinations in Hertfordshire. Not only would this be a huge boost to passengers and the local economy, it would also provide flexibility when building HS2 into Euston, making sure we create a lasting legacy for the station.
Crossrail Stations that could be serviced by Crossrail include Tring, Hemel Hempstead, Watford Junction, Berkhamstead and Harrow and Wealdstone. Any changes will not affect the timetable or planned service pattern for the existing Crossrail scheme which is scheduled to be fully operational by 2019.
Initial analysis suggests 40% of passengers travelling into London from these locations finish their journeys within 1 kilometre of a Crossrail station, compared to just 10% within 1km of Euston. The link would have the added benefit of reducing congestion at the station, specifically for passengers using the southbound Northern and Victoria lines.
The Mayor of London Boris Johnson said:
I have always maintained that the renaissance of Euston is a fantastic opportunity for regeneration in our city and one we should not miss. Providing a new rail route into the capital for passengers from Hertfordshire will be vital for Euston to be properly redeveloped to accommodate HS2 and to maximise the delivery of new homes and jobs in London and beyond. ...
The departmental weasels haven't done a very good job on the first sentence. What Crossrail offers in Herts is faster direct trains to most of central London, not faster trains that are also more direct. The case is similar to Reading, and I'm sure we will hear similar complaints about any loss of the current semi-fasts to Euston. The big difference is that out to Watford there is already a Crossrail-type service on the DC▸ lines, and six tracks or more that far. I've looked for some typical times and mileages: | | |
| Miles (ex PAD» /EUS) | slow | Xrail | semifast | fast | Slough | 19 | 40 | 25 | | 15 | Watford | 17 | 50 | 30-40* | 20 | 15 | Maidenhead | 24 | 50 | 35 | 25 | 20 | Reading | 36 | 60 | 50 | 45 | 30 | Tring | 32 | - | 45* | 35 | - | Milton Keynes | 50 | - | 70* | 60 | 30 | * my estimates (see below for Watford) (Bakerloo is slightly quicker to PAD than LO to EUS from common section!) Categories fast/semifast/slow don't match exactly, due to different number of tracks etc.
PAD semifastsMAI▸ fasts are not a regular service like at EUS, more a few specific peak-hour trains.
Looking for times on the Crossrail website, I find that LST-Shenfield is 41 minutes for 20 miles/14 stops, while PAD-MAI is 36 minutes for 24miles/13 stops). Why? Is that the effect of skip/stop? I'm not sure which to use for Watford.
Of course someone may have better (i.e. based on real plans) figures.
I think MK▸ is really to far for this kind of Metro service.
|
|
|
« Last Edit: August 12, 2014, 16:38:15 by stuving »
|
Logged
|
|
|
|
|
IndustryInsider
|
|
« Reply #417 on: August 08, 2014, 12:44:22 » |
|
Interesting article, BBM, and well worth a read. Thanks for posting the link.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
onthecushions
|
|
« Reply #418 on: August 08, 2014, 18:49:10 » |
|
As well as the advantages described, the improved Thames Valley - Watford (aka Gade Valley) connection should be very useful. Morning business trips via M4/M25/M1 are a pain.
In addition to Tring, St Alban's City might be a popular termination.
With all the work to be done around OOC▸ , perhaps the 6 tracks out of Paddington could also be taken as far out as Ealing Broadway.
OTC
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #419 on: August 08, 2014, 19:12:57 » |
|
With all the work to be done around OOC▸ , perhaps the 6 tracks out of Paddington could also be taken as far out as Ealing Broadway.
Whilst desirable, that wouldn't be possible without a huge amount of money being spent. The railway goes into a small cutting just after Old Oak Common, then you have the Up and Down Poplar lines coming in, followed closely by Acton Main Line station, then Acton Yard, before the final hurdle of the Central Line gets in the way!
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
|