Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:15 11 Jan 2025
 
- Two million discounted tickets up for grabs in rail sale
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
11th Jan (2012)
TVM - a fair weather facility? (link)

Train RunningCancelled
09:38 Weymouth to Frome
11:50 London Paddington to Hereford
Short Run
05:40 Penzance to Cardiff Central
06:59 Frome to Weymouth
07:43 Great Malvern to London Paddington
15:14 Hereford to London Paddington
Delayed
05:47 Didcot Parkway to London Paddington
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 11, 2025, 06:30:04 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[109] Thames Valley infrastructure problems causing disruption elsew...
[96] Westminster Hall debate : Railway services to South West
[59] Ryanair sues 'unruly' passenger over flight diversion
[53] Mick Lynch announces retirement as head of RMT
[49] 'Railway 200' events and commemorations 2025
[38] GWR Advance Purchase sale - January 2025
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: West Mids & Chilterns Draft RUS published  (Read 5106 times)
ChrisB
Transport Scholar
Hero Member
******
Posts: 13034


View Profile Email
« on: November 11, 2010, 15:55:00 »

here
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2039


View Profile
« Reply #1 on: November 11, 2010, 17:47:15 »

It's a shame that the data that it's based on doesn't inspire confidence.

Figure 3.8 source note : "The number of rail journeys made on Centro ticket [sic] has not been estimated between 1998 and 2008." Why not, one might usefully ask, when the figure shows that in 2009-10 they accounted for about 25% of traffic. What on earth is Centro for? They've been busily specifying services throughout their patch. Surely they can't have been doing that on the basis of no passenger information whatsoever?

According to table 3.6, there is no standing on the peak-hour arrivals at New Street on the Cross-City South's longer-distance services. So the standing-room-only from Bromsgove (and sometimes Droitwich) that I see every time I travel must be a mirage.

Figure 3.9 : good to see that there's 6 cross-city trains per hour inwards from Barnt Green. Those ones that I see reversing at Longbridge must be another mirage.

Figure 3.11 : journey time from Worc. Foregate St to Snow Hill is 62 mins, not 67.
Journey time from Shrub Hill to Snow Hill is 60 mins, not 65.

Figure 3.19. It's good to know that Worcester - Hereford has a prevailing linespeed of 100-125 mile/h while the main line south from Bromsgrove can only do 65-75.

I know little about other corridors into B'ham, but extrapolating from my knowledge I'd give this a low mark, with a "must try harder" comment.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13034


View Profile Email
« Reply #2 on: November 11, 2010, 18:00:22 »

It's a draft for comment - see Chapter 8 & get yours in pronto!
« Last Edit: November 12, 2010, 10:10:00 by ChrisB » Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #3 on: November 11, 2010, 18:45:32 »

They mention a very useful 5 trains per hour to Stratford from Marylebone.

Er...  that doesn't seem right.  Huh

Paul
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #4 on: November 11, 2010, 23:16:30 »

But moving on beyond the statistical glitches, there are some interesting proposals, not least on the fringes of FGW (First Great Western)-land at Banbury, where they are advocating wholesale changes to the station area in conjunction with resignalling (Pages 67-8) and at Worcester (page 68), where the proposal for infrastructure improvements is flagged up in the accompanying press release, alongside the reopening of the Stourbridge-Round-Oak-Walsall freight line, which is also linked in with Worcester resignalling and capacity enhancements at various points in the document. Plus a kind of outer-suburban cross-city line, operating half-hourly Worcester-Tamworth (pi52)

Ahead of resignalling, it mentions the possibility of adding extra intermediate block signals, infrastructure improvements at Malvern Wells and a providing a turnback at Hereford station to improve capacity in the short term (p153)

There is also discussion of ways to tackle overcrowding on the Birmingham-Oxford-Reading-South Coast corridor and a move to a seven-day timetable on the route, as well as diverting all Oxford-Birmingham services via Coventry and the airport.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #5 on: November 12, 2010, 12:31:55 »

But moving on beyond the statistical glitches, there are some interesting proposals, not least on the fringes of FGW (First Great Western)-land at Banbury, where they are advocating wholesale changes to the station area in conjunction with resignalling (Pages 67-8)

Yes I noticed that. I think it suggests they might operate the station slightly differently, at least as far as trains terminating from the south are concerned. Having said that, it's possible that could be done now anyway, as the new semaphores (put in for the Reading diversions and discussed in another thread) should also allow the FGW service to return from a platform rather than running right through to the loop north of the station for its turnback? 

Dependent on timings of other XC (Cross Country Trains (franchise)) and Chiltern through services anyway. 

After the resignalling I'd suggest the 'outer' face of the down side island should be optimised as the through route, allowing terminating trains to be in the middle of the station.

Paul

Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #6 on: November 12, 2010, 15:38:34 »

But moving on beyond the statistical glitches

Just to drag us back to the glitches, there does seem to be an awful lot of them, even for a draft.  As well as the ones mentioned there's talk in the Evergreen 3 section of a new passing loop being installed at Bicester and the full Evergreen 3 timetable to Oxford commencing in May 2012 - both of which are wrong as far as I know.  I don't remember the GW (Great Western) RUS (Route Utilisation Strategy) having so many errors.  Still, an interesting document.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #7 on: November 12, 2010, 16:16:57 »

Interesting too to see the increased coverage and size of the recent finalised RUSs (Route Utilisation Strategy)

Once they've issued the WCML (West Coast Main Line) draft planned for next month they'll have done the set of first generation documents.

If anyone looks up the first one, for SWT (South West Trains), published Dec 2007, it seems to be a much simplified summary only, running to about 40 pages rather than getting on for 200 in most recent attempts.

Paul
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #8 on: November 12, 2010, 23:24:39 »

But moving on beyond the statistical glitches, there are some interesting proposals, not least on the fringes of FGW (First Great Western)-land at Banbury, where they are advocating wholesale changes to the station area in conjunction with resignalling (Pages 67-8)

Yes I noticed that. I think it suggests they might operate the station slightly differently, at least as far as trains terminating from the south are concerned. Having said that, it's possible that could be done now anyway, as the new semaphores (put in for the Reading diversions and discussed in another thread) should also allow the FGW service to return from a platform rather than running right through to the loop north of the station for its turnback? 

Dependent on timings of other XC (Cross Country Trains (franchise)) and Chiltern through services anyway. 

After the resignalling I'd suggest the 'outer' face of the down side island should be optimised as the through route, allowing terminating trains to be in the middle of the station.

Paul



One thing I've always though might be useful would be to turn the goods lines into a 70mph-capable though route, which would give the Freighliners a slightly straighter run past and keep them out of the platform roads. Anyway certainly sounds like they envisage a thorough reshaping of the entire area, one way or another.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13034


View Profile Email
« Reply #9 on: November 14, 2010, 16:46:05 »

After the resignalling I'd suggest the 'outer' face of the down side island should be optimised as the through route, allowing terminating trains to be in the middle of the station.

Why?....Obviously not a local....!
The track is practically falling to bits on the outer road - it has a 20 or 30mph speed limit on it. The points network also needs upgrading....
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10365


View Profile
« Reply #10 on: November 14, 2010, 16:54:31 »

The track is practically falling to bits on the outer road - it has a 20 or 30mph speed limit on it. The points network also needs upgrading....

Permanent speed restriction of 15 mph, but with realigned track, new points and changes to the signalling there's no reason why it couldn't be a fair bit more, though getting it up to 75mph (the speed of the current through road) would probably be a bit of an ask.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #11 on: November 14, 2010, 19:43:53 »

After the resignalling I'd suggest the 'outer' face of the down side island should be optimised as the through route, allowing terminating trains to be in the middle of the station.

Why?....Obviously not a local....!
The track is practically falling to bits on the outer road - it has a 20 or 30mph speed limit on it. The points network also needs upgrading....

You are taking the proposition completely out of context though.
 
'Willc' wrote in summary "...Banbury, where they are advocating wholesale changes to the station area in conjunction with resignalling."

as written in the RUS (Route Utilisation Strategy) though they impliy a total renewal, so the current quality or alignment of any particular line is irrelevant:
Quote
Banbury resignalling
The Banbury resignalling project will renew life expired signalling equipment in the Banbury
area, integrating switch and crossing renewals. The signalling assets in the Banbury area are
approaching the end of their useful life at a time when their condition can impact on performance
and reliability. Remodelling of the Banbury area will present opportunities to renew life-expired
track and simplify the track layout, by aligning the switch and crossing replacement programme with
the timescales and scope of the resignalling. With the remodelling and resignalling work there will also
be opportunities to enhance the capability of the infrastructure, which may include an improvement in
headway between Banbury North and the fringes to Marylebone and Oxford signalbox areas, improved
operation of Banbury station, and improved access and egress from the other existing platforms.
Paul
« Last Edit: November 14, 2010, 19:49:26 by paul7755 » Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13034


View Profile Email
« Reply #12 on: November 14, 2010, 20:05:49 »

Yup, thanks - makes sense now.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page