Maidenhead has had a team of contractors work at it for the last few weeks. New cable tray on Plat 4 (up in the roof) new PA▸ loudspeakers strewn (to a plan no doubt) about the platforms
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
James Vertigan
|
|
« Reply #496 on: June 06, 2011, 14:02:58 » |
|
I'll confirm that Twyford, Langley, Iver, Southall, and Hanwell have all recently received their new CIS▸ systems. Stations not yet fitted/fully working in the Thames Valley are Goring & Streatley, Maidenhead, West Drayton, Hayes & Harlington, West Ealing, Ealing Broadway and Acton Main Line.
Does that mean they're working on a line by line basis and those that haven't had the full upgrades completed will see them in the not too distant future?
|
|
|
Logged
|
|
|
|
Oxman
|
|
« Reply #497 on: June 06, 2011, 14:33:35 » |
|
I suspect the CIS▸ work at Goring and Streatley is being held back pending completion of the repairs to the footbridge, which is used as a cable route. A temporary footbridge has been erected to allow renewal of the decking on the permanent bridge.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #498 on: June 06, 2011, 17:08:44 » |
|
Does that mean they're working on a line by line basis and those that haven't had the full upgrades completed will see them in the not too distant future?
Seems totally random to me, with a slight bias towards the smaller stations first. Common sense would have dictated that the likes of Maidenhead and Ealing Broadway would have been towards the top of the list, but sadly not. Still, not too long to wait now, and I repeat that the specification for the new system is excellent with plenty of displays on all platforms.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
lordgoata
|
|
« Reply #499 on: June 06, 2011, 22:14:26 » |
|
I suspect the CIS▸ work at Goring and Streatley is being held back pending completion of the repairs to the footbridge, which is used as a cable route. A temporary footbridge has been erected to allow renewal of the decking on the permanent bridge.
Oh is that all they are doing ? I thought they were replacing the whole thing due to the clearance for electrification ? Not that they actually seem to have done anything for the past several weeks mind you ... As for the CIS, considering it hardly ever worked and was wrong when it was working, its hardly a loss not having it at the moment!
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #500 on: June 07, 2011, 06:12:12 » |
|
I thought it was being done for increased clearance fir freight?
|
|
|
Logged
|
|
|
|
Steve Bray
|
|
« Reply #501 on: June 07, 2011, 14:36:07 » |
|
There was installation work going on at Dorking West yesterday; nothing though at the better-used Dorking Deepdene.
|
|
|
Logged
|
|
|
|
chrisoates
|
|
« Reply #502 on: June 07, 2011, 23:48:38 » |
|
Bodmin Parkway - nice new LED now/next display on each platform plus a large summary board outside the ticket office BUT the voices !!!! I don't recognize the girls voice at all...she announces St Germans as S A I N T GEEER MANS and Lostwithiel as Lost whistle...utterly inexcuseable but only to be expected these days - I've got Ipod guides to Cornwall & Devon which equally mangle place names.
|
|
|
Logged
|
|
|
|
Oxman
|
|
« Reply #503 on: June 08, 2011, 00:53:23 » |
|
Have confirmed that work on G&S footbridge is only refurbishment. Clearance for the freight route was not needed - was not an issue. Nothing being done in this work for electrification clearance - probably far too early for that.
I'm told that the refurbishment work is uncovering a few problems. I'm not surprised - it certainly seemed to me in need of urgent attention. This will no doubt delay the installation of ther new CIS▸ .
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #504 on: June 08, 2011, 11:18:45 » |
|
This week's update - Installations last week: PA▸ at Langley, CIS▸ at Dawlish, CIS and PA Iver Installations planned for this week: CIS and PA at Maidenhead, Bedwyn and Dorking West, CCTV▸ at St Budeaux.
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #505 on: June 08, 2011, 18:28:45 » |
|
Have confirmed that work on G&S footbridge is only refurbishment. Clearance for the freight route was not needed - was not an issue. Nothing being done in this work for electrification clearance - probably far too early for that.
I'm told that the refurbishment work is uncovering a few problems. I'm not surprised - it certainly seemed to me in need of urgent attention. This will no doubt delay the installation of ther new CIS▸ .
I traveled through G & S on my way to Didcot during the bank holiday, my carriage was right under the footbridge ........... there did not seem to be much in the way iron left in a lot of the structure. I would have thought with such a major refurb the opportunity would have been taken the get the electrical clearances, of course it may well be ok without being raised
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
|
JayMac
|
|
« Reply #507 on: June 08, 2011, 23:21:55 » |
|
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
johoare
|
|
« Reply #508 on: June 08, 2011, 23:30:27 » |
|
|
|
|
Logged
|
|
|
|
lordgoata
|
|
« Reply #509 on: June 09, 2011, 08:53:23 » |
|
I traveled through G & S on my way to Didcot during the bank holiday, my carriage was right under the footbridge ........... there did not seem to be much in the way iron left in a lot of the structure. I would have thought with such a major refurb the opportunity would have been taken the get the electrical clearances, of course it may well be ok without being raised
The whole bridge is knackered - when everyone piles off of there at the evening, the whole thing bounces like crazy - although no where near as bad as the lovely sway the temporary bridge has! I can't believe they are not taking the opportunity to replace the whole thing though. When I got off last night, there were a two elderly couples just in front of me, and they were commenting how slow its all going, but how they are looking forward to the new bridge. I think everyone is expecting it to end up like Twyford! There will be a lot of bemused people if we just end up with a new floor methinks
|
|
|