quite correct EXE will be losing the pacers and gaining 150's once we get all the stroke 1's.although not sure if it will be a mix of 1 and 2's all class 150 or just the stroke 1's.obviously the level 5 stuff and T/T will still get done at SPM▸ though.
Care to explain 'level 5 stuff' and 'T/T'?
Thanks awfully
level 5 stuff is different to the routine A and B exams etc,it refers to stuff like engine,transmission changes aswell as C4 work which is bogie,shafts and couplers etc.
then you have c6 work which is overhaull of interior stuff like door systems,relay renewal and interior fittings clean/repair or renew.
T/T is tyre turning.
At present EXE depot does not have any lifting equipment or a lathe to carry out these type of repairs