Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 11:35 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025
28/01/25 - Coffee Shop 18th Birthday

On this day
10th Jan (1863)
Metropolitain line opened from Paddington (link)

Train RunningCancelled
10:15 London Paddington to Cardiff Central
12:50 Cardiff Central to London Paddington
Short Run
07:40 Penzance to Cardiff Central
Delayed
08:15 Penzance to London Paddington
09:52 London Paddington to Hereford
An additional train service has been planned to operate as shown 12:36 Bristol Temple Meads to Cardiff Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 11:50:42 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[110] Ryanair sues 'unruly' passenger over flight diversion
[100] Mick Lynch announces retirement as head of RMT
[80] Westminster Hall debate : Railway services to South West
[38] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
[37] Thumpers for Dummies
[28] Bristol Rail Campaign AGM 2025
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: DVT versus loco?  (Read 4900 times)
Mookiemoo
Hero Member
*****
Posts: 3117


View Profile Email
« on: March 17, 2010, 22:12:14 »

No, I'm not turning into a saddo with a kagool......

My very first W&S (Wrexham and Shropshire (Open Access Operator)) trip a year ago, the steward told me they could not pass through Birmingham New Street if the DVT(resolve) was leading and the loco was on the back.

On Monday, after I gave up on the wifi and three wasnt working, I got chatting to someone who has an interest in railways.  We got diverted via new street (and stopped) due to cable theft at thame bridge.  I commented, oh we can do that cos the DVT is on the back........

So he went and clarified with the guard and apparently if the DVT is leading, it can go through new street but they have to alert the signaller first as it limits the platforms it can pass through since there is a danger of clipping.

No, as a lay person, trains and carriages are on tracks - they really have little control over what they do unless they derail.  So surely any point on the train is equally in danger of clipping a platform regardless of which end is leading.

My spatial reasoning has been challenged (which admittedly is not difficult) and I was wondering if the panel can enlighten me?
Logged

Ditched former sig - now I need to think of something amusing - brain hurts -I'll steal from the master himself - Einstein:

"Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe."

"Gravitation is not responsible for people falling in love"
inspector_blakey
Hero Member
*****
Posts: 3574



View Profile
« Reply #1 on: March 17, 2010, 22:46:07 »

No, I'm stumped. Those DVTs(resolve) used to work in and out of New Street all the time before they were replaced with Voyagers and Pendos. I wasn't aware they were restricted to particular platforms but maybe they were.

I really don't understand the one way good/other way bad thing though. I'd have thought that the DVT was either out of gauge for certain platforms (in which case no go) or it would be OK!
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #2 on: March 18, 2010, 00:01:19 »

At the western side of New Street platforms 9-12 have some tight curves at the ends where the tracks converge on the tunnels, so I assume the clearance concerns are over there, hence the need to alert the signaller, even if it does seem a bit odd the restriction apparently applies one way but not the other. Certainly can never recall being on an InterCity or Virgin working with an 87/90+DVT(resolve) set that strayed over to that part of the station, they always used the longest, straightest platforms in the centre and east of the station, as do the Pendolinos now.

Was reassured on Saturday while travelling to Manchester to see that the finest New Street traditions were being maintained, with a platform change announced at the exact moment our train was just pulling in on the adjacent island, so we were all trying to get down the stairs while those who had got off were coming up. Genius.
Logged
inspector_blakey
Hero Member
*****
Posts: 3574



View Profile
« Reply #3 on: March 18, 2010, 02:48:18 »

Makes sense, but still doesn't explain two things: (a) why a DVT(resolve) will fit one way but not the other or (b) why W&S (Wrexham and Shropshire (Open Access Operator)) couldn't just be routed through on a connection that didn't involve the sharper curves. Am I right in thinking that there are centre roads at BHM that could be used for a train to run through without any risk of platform contact...?
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #4 on: March 18, 2010, 23:25:54 »

The W&S (Wrexham and Shropshire (Open Access Operator)) workings that run via New Street in the normal course of things - remember FA's train was diverted - seem to be booked to use platform 6 or 8, I can't remember exactly which it was the last time I was using W&S.

I don't think the centre roads are passed for trains carrying passengers, they're really more sidings that happen to have access at both ends. Even if you could use them, they are often occupied by a 'hot spare' XC (Cross Country Trains (franchise)) Voyager or an LM (London Midland - recent franchise) DMU (Diesel Multiple Unit) or EMU (Electric Multiple Unit) also on standby. The W&S trains stand in a platform and are dispatched by the station staff even though the doors are kept locked.
Logged
autotank
Transport Scholar
Sr. Member
******
Posts: 241


View Profile
« Reply #5 on: March 18, 2010, 23:37:03 »

Why on earth would a train need to be dispatched from a station where the doors are not opened? Seems like madness to me - how have so many 20th century operating rules/practices survived into the 21st century?
Logged
Mookiemoo
Hero Member
*****
Posts: 3117


View Profile Email
« Reply #6 on: March 19, 2010, 00:03:03 »

The W&S (Wrexham and Shropshire (Open Access Operator)) workings that run via New Street in the normal course of things - remember FA's train was diverted - seem to be booked to use platform 6 or 8, I can't remember exactly which it was the last time I was using W&S.


Yes it was - but I remember vividly being told by the crew a year ago they cannot pass through New street if the DVT(resolve) is leading.  And some of their paths do pass through there when needed not just on diversions - they then go out to tame bridge!

So no one seems to have an answer......
Logged

Ditched former sig - now I need to think of something amusing - brain hurts -I'll steal from the master himself - Einstein:

"Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe."

"Gravitation is not responsible for people falling in love"
super tm
Hero Member
*****
Posts: 599


View Profile
« Reply #7 on: March 19, 2010, 08:10:48 »

Why on earth would a train need to be dispatched from a station where the doors are not opened? Seems like madness to me - how have so many 20th century operating rules/practices survived into the 21st century?

Because it is possible for someone on the station to attempt to open a door.  Obviously the door would not open but it would be on the catch and when spotted further down the line would require an emergency stop and the door locking out of use until it could be checked to make sure nothing is wrong with it.  If the train is despatched from the platform then you can be sure all of the doors are properly closed.

If the train had all automatic doors then the despatch requirement would not be needed
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #8 on: March 19, 2010, 08:43:49 »

what you said yourself was 
Quote
if the DVT(resolve) is leading, it can go through new street but they have to alert the signaller first as it limits the platforms it can pass through since there is a danger of clipping.

Hence what I said about the sharply curved sections of the western platforms, which I am sure, is the issue and explains why they have to tell the signaller if the DVT is at the front so the trains are sent up 1-8, which are straighter.

Quote
And some of their paths do pass through there when needed not just on diversions - they then go out to tame bridge!

Which was what I mean by
Quote
The W&S (Wrexham and Shropshire (Open Access Operator)) workings that run via New Street in the normal course of things


The signallers know those are coming and they have a booked route though the station as a result, which would avoid any issue over what way round the train is and the places the clearances are too tight.
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #9 on: March 19, 2010, 09:00:49 »

Doesn't answer the question as to why the clearences are too tight. I thought a DVT(resolve) was basically a go anywhere vehicle.
Logged
dog box
Hero Member
*****
Posts: 653


View Profile
« Reply #10 on: March 19, 2010, 17:02:00 »

Why on earth would a train need to be dispatched from a station where the doors are not opened? Seems like madness to me - how have so many 20th century operating rules/practices survived into the 21st century?

Also empty stock trains if nor running DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) will be dispatched as usual by dispatch staff and guard, if no dispatch staff the guard will self dispatch, also if a train comes to a stand at a platform or part of a platform the guard will dispatch...this is relevant to HST (High Speed Train)/Loco hauled only where as super tm said there is a possibility of a door on the catch incident occouring
Logged

All postings reflect my own personal views and opinions and are not intended to be, nor should be taken as official statements of first great western or first group policy
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #11 on: March 20, 2010, 00:31:58 »

Doesn't answer the question as to why the clearences are too tight. I thought a DVT(resolve) was basically a go anywhere vehicle.

Clearly not. It's also pretty clear in which part of New Street there is likely to be a problem, hence why you have to alert the signalbox.

I have stumbled across a Network Rail document on route clearance of stock used in East Anglia and under the Mk3 heading, the DVTs are specifically excluded, see http://www.networkrail.co.uk/browse%20documents/baseline%20capability/gauge%20capability,%20route%20availability/anglia%20route/table%20d3_gauge%20capability_coaching%20stock_anglia%20route.pdf suggesting that they have to be separately passed. Perhaps not surprising when they are shorter than a standard Mk3 (61ft 9in v 75ft) and have different bogies, with fairly hefty yaw damping arrangements.
Logged
Mookiemoo
Hero Member
*****
Posts: 3117


View Profile Email
« Reply #12 on: March 20, 2010, 00:48:44 »

Doesn't answer the question as to why the clearences are too tight. I thought a DVT(resolve) was basically a go anywhere vehicle.

Clearly not. It's also pretty clear in which part of New Street there is likely to be a problem, hence why you have to alert the signalbox.

I have stumbled across a Network Rail document on route clearance of stock used in East Anglia and under the Mk3 heading, the DVTs are specifically excluded, see http://www.networkrail.co.uk/browse%20documents/baseline%20capability/gauge%20capability,%20route%20availability/anglia%20route/table%20d3_gauge%20capability_coaching%20stock_anglia%20route.pdf suggesting that they have to be separately passed. Perhaps not surprising when they are shorter than a standard Mk3 (61ft 9in v 75ft) and have different bogies, with fairly hefty yaw damping arrangements.

I understand this bit..............but.......

NO ONE HAS EXPLAINED 

why if the DVT is leading the signallers need to know but if its trailing, they don't!
Logged

Ditched former sig - now I need to think of something amusing - brain hurts -I'll steal from the master himself - Einstein:

"Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe."

"Gravitation is not responsible for people falling in love"
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #13 on: March 20, 2010, 01:08:08 »

Presumably because the bit that sticks out that they are worried about isn't sticking out at the awkward spots when the DVT(resolve) is running the other way round, hence no clearance problem.
Logged
Mookiemoo
Hero Member
*****
Posts: 3117


View Profile Email
« Reply #14 on: March 20, 2010, 01:11:01 »

Presumably because the bit that sticks out that they are worried about isn't sticking out at the awkward spots when the DVT(resolve) is running the other way round, hence no clearance problem.

If I take a fixed cuboid and pass it along a fixed track with fixed curvature - then assuming the cuboid does not deform (and I would not want to be on a train where any bit deformed significantly) the same dimensions apply in each direction...............

Does not compute

Back to my original postulate
Logged

Ditched former sig - now I need to think of something amusing - brain hurts -I'll steal from the master himself - Einstein:

"Two things are infinite: the universe and human stupidity; and I'm not sure about the the universe."

"Gravitation is not responsible for people falling in love"
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page