Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:15 08 Jan 2025
 
- Boy, 14, stabbed to death on London bus
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
05:57 Liskeard to Looe
06:20 Windsor & Eton Central to Slough
06:30 Looe to Liskeard
06:40 Windsor & Eton Central to Slough
07:20 Liskeard to Looe
07:54 Looe to Liskeard
Short Run
05:59 Gatwick Airport to Reading
08:35 Plymouth to London Paddington
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 06:31:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[192] Coastal walks - station to station
[169] 'Railway 200' events and commemorations 2025
[74] Fatal Oxfordshire train crash remembered 150 years on
[67] Warnings of snow, wind and rain across the UK for New Year
[45] Oxford station - facilities, improvements, parking, incidents ...
[34] Senior Railcard - ongoing issues, merged posts
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 175 176 [177] 178 179 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1456859 times)
Visoflex
Full Member
***
Posts: 66


View Profile
« Reply #2640 on: March 14, 2014, 15:02:37 »

Yes, they are services.  Starbucks are moving their concession area to the top of the Western gateline escalators, and the large spaces between the lifts will be occupied by new businesses in glass kiosks such as Boots, Upper Crust, Oliver Bonas, etc.  Details of the new concessionaires are on the current white hoarding.
« Last Edit: March 17, 2014, 08:42:31 by Visoflex » Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2641 on: March 16, 2014, 10:16:33 »

Now here's a thing. Underneath the back edge of the P7 canopy, where it is fitted round the back of the 3 Guineas, there are some odd-shaped steel sections. Towards P6, they are stepped to follow the profile of the masonry band at first-floor level, so presumably are to do with weatherproofing the join. Further along toward P3, they are shaped with an extra step into the building above each window - but the masonry doesn't do that. That stonework is being cut into in several places, and no doubt that could be done here. But why make it that shape?

See? It does fit ... sort of.

Looking along the rest of this wall, the idea seems to be to leave a gap of 4-6 inches round each pilaster, following its shape. This gap is narrowed to 1-2 inches for most of the length of each bay. But what has gone wrong with this one? A classic negative clearance problem, I'd call it.
Logged
lbraine
Sr. Member
****
Posts: 143


View Profile
« Reply #2642 on: March 16, 2014, 16:29:40 »

Starbucks moved to new position (atop the Southern escalator/stairs) overnight.

It's right in that corner - so the view over the RBC(resolve) works outside is now restricted.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2643 on: March 16, 2014, 18:55:13 »

Starbucks moved to new position (atop the Southern escalator/stairs) overnight.

It's right in that corner - so the view over the RBC(resolve) works outside is now restricted.

Perhaps Starbucks didn't want to wait until RBC's project is finished - after all rents might be out of their reach in about 5 years time, at present rate of progress on the site...
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2644 on: March 17, 2014, 23:54:47 »

Starbucks moved to new position (atop the Southern escalator/stairs) overnight.

It's right in that corner - so the view over the RBC(resolve) works outside is now restricted.

Well, so far it hardly affects the view - certainly not compared with the area their seating is shown as spreading into eventually.

So you can still see that the monsters are feeling hungry again. Two more pillars-worth of of raised roadway are coming down now, ages after the rest. It does look rather like a change of plan, doesn't it?
Logged
Oxman
Transport Scholar
Hero Member
******
Posts: 423


View Profile
« Reply #2645 on: March 18, 2014, 00:25:42 »

It looks as though ground works have started on the North side of the station for the open space outside the new North entrance. NR» (Network Rail - home page) appears to have handed over the space to another contractor and lots of drainage work going on.
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #2646 on: March 18, 2014, 09:50:51 »

So you can still see that the monsters are feeling hungry again. Two more pillars-worth of of raised roadway are coming down now, ages after the rest. It does look rather like a change of plan, doesn't it?

I can't fathom what they're building apart from a 3/4 width staircase to view some graffiti ridden pillars against a grim backdrop of derelict architecture Wink

A lot of the area under the bubble roof over P1/2/3 is now accessible though much of P3 is now closed off again whilst the temporary light and power scaffolding is removed and the holes filled in.
The country end of P3 is still incomplete but overall that space is much nicer now.
« Last Edit: March 18, 2014, 10:14:42 by Nosaj » Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4505


View Profile
« Reply #2647 on: March 18, 2014, 17:13:13 »

I assume it is part of the redevelopment of the building.  If they are going to redevelop and reclad the building they will want to do it down to ground level so removing the last of the concrete slab is presumably a  that work. 
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2648 on: March 18, 2014, 17:29:50 »

The complete building in the view above, including the tall block (out of shot above at the south end of it) is being fully demolished AIUI (as I understand it).

Paul
« Last Edit: March 18, 2014, 17:36:22 by paul7755 » Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4505


View Profile
« Reply #2649 on: March 18, 2014, 17:47:36 »

The complete building in the view above, including the tall block (out of shot above at the south end of it) is being fully demolished AIUI (as I understand it).

Paul

My understanding was that they were now proposing to strip it back to the frame and reclad the tower and redevelop the other buildings at the bottom. 
Logged
Jonty
Full Member
***
Posts: 42


View Profile
« Reply #2650 on: March 18, 2014, 18:50:04 »

No, the whole lot is coming down, praise The Lord.

It's The NCP car park behind that stays, and gets a re-cladding and a  5 a side football pitch on its roof...!!
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2651 on: March 18, 2014, 22:44:10 »

Are these not all just proposals? I don't think anything has been designed yet, let alone gone to planning. And probably nothing is even half-funded either.

Certainly all the raised roadway and the row of tatty shops will eventually be replaced by something else. However, the change I was talking about is to the interim arrangement, when first opened to the public.  Were were some pictures? I though so, but I can't now find any.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2652 on: March 19, 2014, 10:17:35 »

The latest idea for a 'temporary events space' was only approved in January this year, having been submitted April last year:

Quote
RBC(resolve) planning ref:     130440

Site Address:  Western Tower Office and 26-58 Station Hill Reading RG1 1NF

Description:   Demolition of Station Hill Retail Parade (including 26 to 58 Station Hill) to create a multipurpose area to be used for holding temporary events. Works of hard and soft landscaping and other incidental works.

It looks to me as though there will be some sort of temporary wall in line with the far side of the new steps (parallel to the line of the station) until they decide what to build on the site.

Paul
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2653 on: March 19, 2014, 10:21:15 »

My understanding was that they were now proposing to strip it back to the frame and reclad the tower and redevelop the other buildings at the bottom. 

Ah, I think that is the current plan for the independent 'Thames Tower' which is across the road from the old station entrance.   (The dark brown coloured tower with the nets fastened round it.)  That is a change from the original full demolition of everything.   But the site at the address I just posted (the one in stuving's photo) is just about to come down, and seems to have been proposed for full demolition in all the earlier plans I can find.

Paul
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2654 on: March 19, 2014, 10:47:37 »

It looks to me as though there will be some sort of temporary wall in line with the far side of the new steps (parallel to the line of the station) until they decide what to build on the site.

You have to look quite hard at that application to work out what level it is at. It says the ground level will be raised slightly after demolition, but I think that just means up to the lower (bottom of the steps) level. There will obviously need to be a wall to separate this low level from the high level towards Thames Tower. Incidentally, this application does still talk about demolishing that (but of course it's a year old now).

I wasn't sure if this "temporary" plan would get done right away - but it looks as if it is, so in that sense it is a change of plan (from waiting for a decision to having one). Of course it may not be actually finished at the time the steps are opened.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 175 176 [177] 178 179 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page