Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 06:35 08 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
05:57 Liskeard to Looe
06:20 Windsor & Eton Central to Slough
06:30 Looe to Liskeard
06:40 Windsor & Eton Central to Slough
07:20 Liskeard to Looe
07:54 Looe to Liskeard
Short Run
05:59 Gatwick Airport to Reading
08:35 Plymouth to London Paddington
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 06:36:22 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[192] Coastal walks - station to station
[169] 'Railway 200' events and commemorations 2025
[74] Fatal Oxfordshire train crash remembered 150 years on
[67] Warnings of snow, wind and rain across the UK for New Year
[45] Oxford station - facilities, improvements, parking, incidents ...
[34] Senior Railcard - ongoing issues, merged posts
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 147 148 [149] 150 151 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1457069 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2220 on: September 24, 2013, 19:32:18 »

The street-lamp fairy, with cherry picker, came and ...
But missed the middle one, which will presumably be a double.

This post is pre-drilled for two luminaires, but the lower one looks as if it would have a bit of a negative clearance problem with one of the old luminaires if fitted. That presumably explains why it was left off for now.

These luminaries are, as you would expect, full of loads of LEDs. It could be that there's a policy in force (not sure whose) that all new street luminaires must be LED ones, which applies to these.
Logged
Red Squirrel
Administrator
Hero Member
*****
Posts: 5451


There are some who call me... Tim


View Profile
« Reply #2221 on: September 24, 2013, 21:15:45 »


These luminaries are, as you would expect, full of loads of LEDs.


Easy mistake to make, but thanks - it made I larf. I wouldn't wish being filled full of led on even a C-list luminary.
Logged

Things take longer to happen than you think they will, and then they happen faster than you thought they could.
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2222 on: September 24, 2013, 22:08:34 »

The poster concerning Platform No.7 can be found here: http://firstgreatwestern.co.uk/~/media/PDF/contents/ReadingImprovementWorks/platform-7-poster-v3.ashx
Logged
ironstone11
Full Member
***
Posts: 75


View Profile
« Reply #2223 on: September 24, 2013, 22:19:46 »

Summarises it quite well.

They will have to crack on to get it finished by the end of the year. As discussed earlier, the initial work will have to be done during night time possesions.

BTW (by the way) there are some Flickr pictures of the weekend work. One shows a track panel being craned in, presumably from Caversham Road. http://www.flickr.com/photos/digitalmck/9904590674/in/pool-1945836@N21
« Last Edit: September 24, 2013, 23:05:34 by ironstone11 » Logged
ironstone11
Full Member
***
Posts: 75


View Profile
« Reply #2224 on: September 24, 2013, 22:24:08 »

It could be that there's a policy in force (not sure whose) that all new street luminaires must be LED ones, which applies to these.

I don't know, but some councils are adopting LEDs for renewals. Longer life, lower energy and WHITE!
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2225 on: September 24, 2013, 22:48:29 »

Thanks for finding that - I did look, but the links to it are less than obvious (it's under "upcoming works at Reading station", though the temporary platform has now finished upcoming).

Reading it properly it is a lot clearer than my recollection, which was hindered by having to read it through a stream of passengers. I'm not sure why it was put up in such awkward places. But it is a surprisingly detailed explanation, compared with most - better than most of the last Reading Station news.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2226 on: September 24, 2013, 22:55:33 »

I see (on camera 02/2) that there's a load of activity in the front forecourt compound just now, as during each night since about Thursday. There's also a bright floodlight shining straight at the camera, so you can't see into the entrance. The styrocauseway was being used as well, which would make sense to supply work on P8/9.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2227 on: September 25, 2013, 10:05:51 »

Just looking at RealTimeTrains there seems to have been a subtle change to platforming of down direction HST (High Speed Train) operated services, eg to Bristol and South Wales.   AFAICT (as far as I can tell) there are now none booked through P8.  Last week many Bristol and South Wales HSTs used P8.  If this is actually the case in practice, (because platforming can change at the last minute), is this an indication that P8's 'operational length' has now been reduced as originally proposed in the Engineering Access Statement?

I remember it being explicitly mentioned in the EAS a couple of editions back, but there's nothing in the current online version.

By the way, the P8 edge coping replacement was almost at the half way point by Monday, although the platform was still in normal use by HSTs at that time.

Paul
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10361


View Profile
« Reply #2228 on: September 25, 2013, 13:48:01 »

I'm pretty sure P8's length was reduced temporarily to 6-car Turbo length at the same time the temporary P7 opened.  HST (High Speed Train)'s can still stop there, but won't do so unless problems with P9 force it to be used.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2229 on: September 25, 2013, 13:57:10 »

I'm pretty sure P8's length was reduced temporarily to 6-car Turbo length at the same time the temporary P7 opened.  HST (High Speed Train)'s can still stop there, but won't do so unless problems with P9 force it to be used.

That would probably explain why they won't have advertised it on any public posters then, as there shouldn't normally be any effect on passengers until such time as they depart from booked workings.  I'd assume passengers on those services will have become used to going from either P8 or P9 pretty much at random over recent months, so they may actually see standardisation on P9 as an improvement anyway...

Paul
« Last Edit: September 25, 2013, 15:07:09 by paul7755 » Logged
Tim K
Full Member
***
Posts: 30

Commuting from Swindon to London


View Profile
« Reply #2230 on: September 26, 2013, 07:15:12 »

I was on a HST (High Speed Train) on Monday night that had to stop at platform 8, we were told that the rear two coaches would not be opening and that anyone in those carriages who wanted to alight at Reading needed to move forwards. 
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7369


View Profile
« Reply #2231 on: September 26, 2013, 10:38:38 »

I see the concrete pump is is use again this morning - and a mixer truck has just arrived. Presumably that's for the last 15 m or so of foundation on P10 that was not done last week (pic from Saturday).

Looking at the long string of detached pipe sections, I was trying to imagine how the discharge point was moved. It is more usual to have an articulated pipe going up and then down, but this straight one can't do that. Do they really start with it full length, and hastily unbolt a section at a time as the trench fills? If so, how do they clean the concrete out of each section (they look pretty clean)?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2232 on: September 26, 2013, 11:16:28 »

I wonder if they use a flexible section on the end to allow for more accurate placement of the concrete, (like you see on the lorry mounted equipment), and then reposition it as they reduce the length a few sections at a time.  Seems to me what would be left in the individual pipe sections could just be dropped into the trench, something pushed through on a pole would deal with what little remained inside the pipe.  Then what we might not see is a gang of men cleaning the short sections as they are removed using manual means, that could even be done somewhere else, and what we've seen between times is after they've returned the sections to the worksite.  Earlier in the week the sections of pipe were all lying along the footings, but were not yet joined together.

On Monday afternoon they were extending the footings trench at the London end, perhaps they'll pour some concrete there as well?

By the way, did you notice that the 'I girder' piling we discussed now extends over almost the full length of the gap?

PS, as at 1620, there have been a fair number of concrete mixers arrive and depart over the course of the afternoon, will be interesting to hear how much has been done...

Paul

« Last Edit: September 26, 2013, 16:24:24 by paul7755 » Logged
ironstone11
Full Member
***
Posts: 75


View Profile
« Reply #2233 on: September 26, 2013, 23:23:02 »

Surprised to see a dumper being driven in through double doors of new southern entrance. Presumably to access P7. Cams 02/1 and 02/2 at 22:45 today.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2234 on: September 27, 2013, 16:29:54 »

The main run of the P10 platform wall footing strip is now complete, with another section of blockwork started towards the middle of the London end of the platform.  The 'transom end' strip at the easternmost point had also been poured. 

The webcam shows the pipe sections being craned onto a truck mid afternoon, 1415 or so...

Paul   
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 147 148 [149] 150 151 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page