Took some pics yesterday:
This is the gateline of the new North entrance, taken though glass, so please forgive the reflections. Ticket windows in the background and lots of advertising banners for
NR» and construction companys. Also some hoardins hiding part of the building - possibly for installation of retail outlets?
View of the East end of the new platforms. Shows one of the signals that give entry to the platforms, as discussed earlier in the thread.
Another of the East end, OHLE stanchions in place.
The signal gantry at the East end.
The end of the old bridge! And a pile of timber, presumably to be used during the Easter block?
Shot of the Western stairs/escalators from platforms 10/11 to bridge. The walls are being capped with a substantial bit of metal, presumably the base for the glass screens discussed earlier. There is gap visible between the ceiling of the bridge and the flying canopy. It doesn't look as though these are to be filled in - they have a mesh grill in them, presumably to keep pigeons out. It will be interesting to see how well the bridge is protected from the elements.
Stairs and escalators from platforms 8/9 to bridge.
Lots of work going on at the Western approaches to the new platforms, and OHLE visible in the new depot.
The knitting going up in the eastern depot sidings.