Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 21:55 08 Jan 2025
 
- Mother 'not surprised' son killed on London bus
- Ryanair sues 'unruly' passenger over flight diversion
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
21:37 Looe to Liskeard
21:39 Paignton to Exmouth
21:53 London Paddington to Worcester Shrub Hill
22:51 London Paddington to Worcestershire Parkway
23:20 Exmouth to Exeter St Davids
09/01/25 05:57 Liskeard to Looe
09/01/25 06:30 Looe to Liskeard
09/01/25 07:20 Liskeard to Looe
09/01/25 07:54 Looe to Liskeard
09/01/25 08:30 Liskeard to Looe
09/01/25 09:05 Looe to Liskeard
09/01/25 09:36 Liskeard to Looe
09/01/25 10:08 Looe to Liskeard
09/01/25 10:36 Liskeard to Looe
09/01/25 11:06 Looe to Liskeard
09/01/25 11:36 Liskeard to Looe
09/01/25 12:08 Looe to Liskeard
Short Run
20:52 London Paddington to Great Malvern
Delayed
18:00 Cardiff Central to Penzance
19:04 London Paddington to Plymouth
21:10 Weston-Super-Mare to Bristol Parkway
21:28 Weymouth to Frome
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 22:10:37 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[189] 'Railway 200' events and commemorations 2025
[101] Oxford station - facilities, improvements, parking, incidents ...
[64] Views sought : how train companies give assistance to disabled...
[49] Bristol Rail Campaign AGM 2025
[42] senior railcard
[40] Coastal walks - station to station
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 189 190 [191] 192 193 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1458319 times)
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2850 on: September 21, 2014, 16:12:03 »

Here is the layout sketch as was proposed in 2008 (as with these documents I have posted before this shows the older dive-under proposal for the flyover, but the track layout is approximately the same):

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2851 on: September 21, 2014, 17:28:57 »

Ah - but that plan, keeping all the connections from the Westburies to the Mains, is no longer going to happen. It was still the plan later in 2008, after the viaduct had been chosen - this (very lo-res) picture dates from the bidders' conference. It is for the stage (about two steps further on) when the Festival Line has just been attached to a loose end of an old Main Line.

In that plan, right at the end after the Feeder Lines had been opened, all the temporary trackwork from P7-9 onto the viaduct had to be replaced with new, moving it southwards. I assume that in the new plan the trackwork that goes in there will be pretty much in its final location, as in the second picture. Remember that the final layout has no connection from P9 to the Westburies. Note also that the station end of the Festival Line (to the High Level Junction) now goes in at the same time, while it was going to be built from the west end first.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2852 on: September 22, 2014, 21:22:32 »

Well your Phase 70 seems to match my copy of Stage 10-11 which (in 2008) was programmed for post Xmas 2014.  Its obvious now, that to get the project completed a year early, that a number of planned stages have been welded together Roll Eyes Tongue.

Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2853 on: September 22, 2014, 21:27:56 »

Noticed today that the Down Main track has also now been added over the new viaduct.
Logged
lbraine
Sr. Member
****
Posts: 143


View Profile
« Reply #2854 on: September 22, 2014, 21:59:14 »

And also today - clear signs of earth being graded up to first pilon (at cow lane) on western end of festival line.

There has been some drilling going on around there - presumably for pumping concrete to stabilise the ramp to be built
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2855 on: October 04, 2014, 23:13:28 »

This rather impressive congregation of cable drums and lineside cabinets has appeared behind Reading station. I presume it is mostly needed for the viaduct and the new Feeder Lines, rather then for electrification.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4505


View Profile
« Reply #2856 on: October 04, 2014, 23:19:58 »

I don't know storing signalling equipment in what was once GWR (Great Western Railway)'s signalling workshops! Whatever next.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2857 on: October 05, 2014, 10:49:56 »

Obviously the remaining cabinets for the Xmas to Easter works.  The ones with the yellow stripes are signalling power cabinets.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10362


View Profile
« Reply #2858 on: October 05, 2014, 12:21:04 »

A large gantry, complete with three signals, has appeared on the viaduct towards the eastern end.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
lbraine
Sr. Member
****
Posts: 143


View Profile
« Reply #2859 on: October 08, 2014, 08:01:06 »

And I noted today while passing that the 3 signals (mains and festival) on the gantry are all mounted facing the country end - controlling access to Reading station. Suggesting, at least the down main is going to be bi- directional.

Also two tampers on each new main line at country end this morning, on new viaduct track. The track looked well bedded, with noticeable camber dealing with the, now gentle, curve onto the main alignment

Earth / spoil piles are appearing along the country end of the festival line - presumably for the grading up to the new Cow Lane bridge/viaduct.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10362


View Profile
« Reply #2860 on: October 08, 2014, 11:29:07 »

And I noted today while passing that the 3 signals (mains and festival) on the gantry are all mounted facing the country end - controlling access to Reading station. Suggesting, at least the down main is going to be bi- directional.

Yes, presumably bi-directional from the crossover that it supposed to be on the viaduct itself.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #2861 on: October 08, 2014, 17:13:10 »

And I noted today while passing that the 3 signals (mains and festival) on the gantry are all mounted facing the country end - controlling access to Reading station. Suggesting, at least the down main is going to be bi- directional.

Yes, presumably bi-directional from the crossover that it supposed to be on the viaduct itself.

You presumme corectly. The crossover will be installed facing Up Main to Down Main more  or less on the crest of the flyover, with a second crossover From Down Main to the  Festival line. This will give Crosscountries two routes to and from Paltform 3. Depending on whether they are routed Mains or Reliefs to and from Didcot. If on Up Main will use crossovers on the flyovers or if on Relief will use the Festival Line. Similarly Down trains can access Down Main on the flyover or Festval Line to Down Felief
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2862 on: October 08, 2014, 17:54:46 »

Here's a pic of a tamper working on the Festival Line at the east end of the ramp this morning, thought it might help for those who haven't yet seen the gantry being discussed above...

Paul
« Last Edit: October 08, 2014, 18:18:34 by paul7755 » Logged
lordgoata
Transport Scholar
Hero Member
******
Posts: 415



View Profile
« Reply #2863 on: October 09, 2014, 09:10:33 »

A huge flight of stairs has appeared part way along as well now, I assume for emergency exit in case of an issue on the viaduct.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2864 on: October 09, 2014, 09:34:44 »

A huge flight of stairs has appeared part way along as well now, I assume for emergency exit in case of an issue on the viaduct.
Yes - there are to be six "steel emergency access stairs", three on each side of the viaduct.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 189 190 [191] 192 193 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page