Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 21:55 08 Jan 2025
 
- Mother 'not surprised' son killed on London bus
- Ryanair sues 'unruly' passenger over flight diversion
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
21:37 Looe to Liskeard
21:39 Paignton to Exmouth
21:53 London Paddington to Worcester Shrub Hill
22:51 London Paddington to Worcestershire Parkway
23:20 Exmouth to Exeter St Davids
09/01/25 05:57 Liskeard to Looe
09/01/25 06:30 Looe to Liskeard
09/01/25 07:20 Liskeard to Looe
09/01/25 07:54 Looe to Liskeard
09/01/25 08:30 Liskeard to Looe
09/01/25 09:05 Looe to Liskeard
09/01/25 09:36 Liskeard to Looe
09/01/25 10:08 Looe to Liskeard
09/01/25 10:36 Liskeard to Looe
09/01/25 11:06 Looe to Liskeard
09/01/25 11:36 Liskeard to Looe
09/01/25 12:08 Looe to Liskeard
Short Run
20:52 London Paddington to Great Malvern
Delayed
18:00 Cardiff Central to Penzance
19:04 London Paddington to Plymouth
21:28 Weymouth to Frome
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 22:14:44 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[189] 'Railway 200' events and commemorations 2025
[101] Oxford station - facilities, improvements, parking, incidents ...
[64] Views sought : how train companies give assistance to disabled...
[49] Bristol Rail Campaign AGM 2025
[42] senior railcard
[40] Coastal walks - station to station
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 174 175 [176] 177 178 ... 230
  Print  
Author Topic: Reading Station improvements  (Read 1458626 times)
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2625 on: March 08, 2014, 00:11:49 »

The P7 canopy along much of the length of the pub was installed overnight. It's rather more bespoke than the drop in sections that have been installed elsewhere so it's more kit than a modular build.

And now the framework of the canopy is complete, and the crane has gone. It is now clear it runs along P7 only until it stops to turn a not-quite-right angle to become the canopy fixed to the Brunel Plaza skeleton overlapping the ends of P4-6. The bit on P7 along the Brunel Plaza face is main spars only, so presumably the rest is bolted in by hand. perhaps it was too far for that crane to reach?
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2626 on: March 08, 2014, 23:46:06 »

If you look, there are several sets of white marks where seats will go at the west end of P8/9, and some (but not enough) at the east end of P8/9.

Here are those marks on the west end of P8/9, in line with the seats just fitted on P10/11 ...

and here are those seats, with supports not in line with each other, or vertical come to that.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2627 on: March 08, 2014, 23:57:47 »

And now the framework of the canopy is complete, and the crane has gone. It is now clear it runs along P7 only until it stops to turn a not-quite-right angle to become the canopy fixed to the Brunel Plaza skeleton overlapping the ends of P4-6. The bit on P7 along the Brunel Plaza face is main spars only, so presumably the rest is bolted in by hand. perhaps it was too far for that crane to reach?

For canopy-lovers everywhere, this is P7 today - the pictures may be easier to follow than yesterday's words.

First, the overall view. The first of the hoops for the EFE skylight is in place now, but lots of cladding is still missing.
Next, the end - presumably short cantilevered sections go on here.
That orange thing in the compound is the cutest little crane on wheels, though it ought to be able to handle the bits to be assembled in situ. Your six year-old son would love one!
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #2628 on: March 09, 2014, 19:56:20 »

An interesting telephoto lens shot of the viaduct has appeared here: http://www.flickr.com/photos/mark_iliff/13034574633/in/pool-1945836@N21/
Logged
a-driver
Hero Member
*****
Posts: 1105


View Profile
« Reply #2629 on: March 10, 2014, 03:49:14 »

Platform 10 at Reading Station is back in use this morning (10/03/14)!

Should make an improvement to punctuality, especially in the morning peak
Logged
mjones
Transport Scholar
Hero Member
******
Posts: 408


View Profile
« Reply #2630 on: March 10, 2014, 09:34:28 »

At last! Straight into platform 10 on time this morning, none of the crawling past the viaduct wondering if I'm going to make my connection!
Logged
Boppy
Sr. Member
****
Posts: 182


View Profile
« Reply #2631 on: March 10, 2014, 13:33:34 »

I agree.  Having 10 open will finally make a difference in regards to the London bound fast trains not having to queue up.

Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2632 on: March 10, 2014, 19:25:10 »

A couple of points about P8:

The extra length at the London end isn't just being kept as is while the other end is short - it's being finished as permanently about 30 m longer than P9-11.

Just where some seats will go at London end (in line with some just put in on P10/11), the paving shows signs of being lifted and relaid. I guess that was to make sure it was suitable for fixing them, e.g. replacing rubble fill with concrete.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2633 on: March 10, 2014, 19:33:13 »

Now here's a thing. Underneath the back edge of the P7 canopy, where it is fitted round the back of the 3 Guineas, there are some odd-shaped steel sections. Towards P6, they are stepped to follow the profile of the masonry band at first-floor level, so presumably are to do with weatherproofing the join. Further along toward P3, they are shaped with an extra step into the building above each window - but the masonry doesn't do that. That stonework is being cut into in several places, and no doubt that could be done here. But why make it that shape?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2634 on: March 10, 2014, 19:52:19 »

Just where some seats will go at London end (in line with some just put in on P10/11), the paving shows signs of being lifted and relaid. I guess that was to make sure it was suitable for fixing them, e.g. replacing rubble fill with concrete.

Looking at what's happening on the islands I remembered that in the area of P8/9 between the escalators and the new 'London end' buildings, (i.e. within the previously fenced off area), they built some fairly large and deep concrete footings under the block paving - exactly where there are now seat positions marked with white paint.  Presumably the idea is that they run the block paving right over the area to get them fitted properly round the boundaries such as surface water drains, building walls etc etc, and then go back and remove small areas to fix the legs afterwards...

I also noticed the fairly random cuts and grooves in the 3G building stone work that you've mentioned - and I couldn't really see a pattern to it at all.  Will be interesting to see what happens over the next few weeks.

Meanwhile, on a slightly different point.  Looking at the work going on in the vicinity of P4-6, I was wondering if the brickwork and concrete blocks in line with the end of the tracks will be retained in the final design.  They look quite a poor detail now - I remember we discussed the requirements for the over-run distance at the end of a bay platform with respect to the other end, P1-3 a while back but I couldn't easily find it again.   Can you remember if those concrete lumps are essential?

Paul
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7370


View Profile
« Reply #2635 on: March 10, 2014, 22:23:23 »

Meanwhile, on a slightly different point.  Looking at the work going on in the vicinity of P4-6, I was wondering if the brickwork and concrete blocks in line with the end of the tracks will be retained in the final design.  They look quite a poor detail now - I remember we discussed the requirements for the over-run distance at the end of a bay platform with respect to the other end, P1-3 a while back but I couldn't easily find it again.   Can you remember if those concrete lumps are essential?

Do you mean the walls at the ends of the platforms? I can see something is needed, because of the restricted space, but it could be a fence. I don't recall seeing any rules on that.

The previous post was at http://www.firstgreatwestern.info/coffeeshop/index.php?topic=6405.msg141501#msg141501 - which gives the document references. I only remember the bit about the distance needed to a new support for overhead structures. The pillars in line with the tracks are not new, but the rules may still apply.
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #2636 on: March 13, 2014, 11:13:37 »

I'm not sure what this is but it's appeared in the corner at the top of the steps overlooking the south entrance.

To my untrained eye it looks like an unverted U of piping drilled through the floor tiles, a couple of hand valves and maybe an electric pump connected to some kind of electric supply box, also drilled into the floor tiling.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #2637 on: March 13, 2014, 11:22:00 »

I wonder if it's for the intended catering outlet there?  It will possibly be their water supply - could be a pressure reducer or even a miniature water meter?

I think the idea is that all the services are available via a sort of 'crawl space' under the floor of the transfer deck, so caf^s could spring up almost anywhere...   Grin

Paul
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #2638 on: March 13, 2014, 11:34:09 »

I wonder if it's for the intended catering outlet there?

Good point. So it's not beer pumps then ? Wink
Logged
broadgage
Transport Scholar
Hero Member
******
Posts: 5632



View Profile
« Reply #2639 on: March 13, 2014, 12:10:49 »

Looks like a water meter to me, I have installed several.

The grey box is probably an electricity supply and meter, or at least provsion for installing same.
Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 174 175 [176] 177 178 ... 230
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page