Lee
|
|
« on: December 11, 2009, 10:25:13 » |
|
Apologies if we've already covered this somewhere, but the following proposals are getting a fair bit of press, and I'd be interested to know what forum members think of them - http://windsorlink.co.uk/default.aspx
|
|
|
Logged
|
|
|
|
JayMac
|
|
« Reply #1 on: December 11, 2009, 12:13:26 » |
|
Interesting, but far far better if somebody bothered to proof-read the website. It's full of spelling mistakes or typographical errors. Would rather put me off if I were a potential investor.....
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
6 OF 2 redundant adjunct of unimatrix 01
|
|
« Reply #2 on: December 11, 2009, 19:18:03 » |
|
will someone please tell them about the gmpte funded link from south manchester to salford built in the 80's
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #3 on: December 11, 2009, 19:33:32 » |
|
Wishful thinking is the best I can come up with, the Bourne End High Wycombe bit is iffy at best due to the (shortsighted) development on the old alignment although there are some proposals already, a tunnel under Windsor I think the owner of the little house on the hill might have something to say about that.
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
|
Btline
|
|
« Reply #5 on: January 09, 2010, 15:16:17 » |
|
It's not going to happen for many reasons (money, trackbeds blocked etc)
But the big boo-boo is that none of the "new" services serve London. So they won't be used!
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #6 on: January 09, 2010, 15:33:09 » |
|
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
eightf48544
|
|
« Reply #7 on: February 05, 2010, 11:09:17 » |
|
We discussed thiss proposal at the Slough and Windsor Railway Society meeting last Friday with Christian Wolmar.
It was generally agreed that Linging the GW▸ and SR‡ lines in Windsor was pie in the sky for several reasons. Not least of which is Electric trains little house on the hill. The map on teh web site shows a large U to get round this obsticle.
Further linking the two lines doesn't really gve many more journey oportunities. The main problem being is that the Windsor doesn't haven't direct services onto the SW main line. Thus you would still have to change if you wanted to go Slough to Portsmouth it would still probably be quicker to go via London or maybe Reading.
The only bit that would form a really useful link is Bourne End High Wycombe, which as Electric train says is iffy. However, if it were to be reinstated and East West reinstatement gets the go ahead then it forms an important North South link in Bucks all the major towns Slough (in Bucks until 1974) Maidenhead, High Wycombe Ayesbury Bletchley Milton Keynes, with onward connections at Milton Keynes and Bedford.
Just a thought they knocked down 14,000 houses when St Pancras was built and demolished a whole road in Walthamstow/Leyton to put in the Motorway.
So a few odd building between Bourne End and Wycombe don't really count.
|
|
|
Logged
|
|
|
|
paul7575
|
|
« Reply #8 on: April 09, 2013, 13:19:33 » |
|
Is this guy not just flogging a dead horse? The local press article seems to be implying that any day now NR» are finally going to agree that his plans are go. Personally I just don't see it happening at all. Paul
|
|
|
Logged
|
|
|
|
johoare
|
|
« Reply #9 on: April 09, 2013, 14:05:46 » |
|
I can't see how that would work? Windsor and Eton Central is lot higher up than Windsor and Eton Riverside..As is the line coming into Windsor and Eton Central as it goes across the river..
|
|
|
Logged
|
|
|
|
paul7575
|
|
« Reply #10 on: April 09, 2013, 14:12:30 » |
|
I suspect that aspect (linking the two stationss) is an error, I'm pretty sure from earlier discussions his plan is just to link the two routes, and the existing Central platform would almost certainly close. But even then there's no easy solution to the height difference, once you start looking at curvatures and gradients - assuming you use the existing river bridge on the Slough branch...
Engineering design by using a coloured pencil on a route map, as someone once said...
Paul
|
|
|
Logged
|
|
|
|
swrural
|
|
« Reply #11 on: April 09, 2013, 16:09:27 » |
|
Have you seen this link? http://windsorlink.co.uk/Any comment? Edit This is the relevant paragraph: "To correct this, phase 1 of the Windsor Link Railway proposes a new tunnel to connect the two lines. Connecting these had been proposed before but failed to resolve the problem of the two existing stations being at such different levels. The Windsor Link Railway resolves this by ignoring the two existing stations and proposing a new station in between the two with a tunnel connecting them. As the two lines enter the town at similar levels this results in less steep gradients than on the existing lines. Also, by proposing a cut-n-cover tunnel under an existing road, construction time and cost are minimised, as is the environmental impact. This new tunnel is shown in red in the phase 1 circle on the above map. This is the tunnel in Windsor (shown in red in the phase 1 circle). For aerial photos on this route through Windsor, have a look at the Windsor page."
|
|
|
Logged
|
|
|
|
paul7575
|
|
« Reply #12 on: April 09, 2013, 16:29:16 » |
|
Yes, but I think the whole plan is completely irrational. People want direct - the HLOS▸ proposal for WRAtH▸ is a bit non specific, but I'll put a few bob on NR» not being interested at all in a round the houses route as per this proposal. There are far easier solutions, straight out from T5 and take a right, connecting with a westwards curve to the GWML▸ - and they don't require a cut and cover underground station in Windsor...
I also see he suddenly throws into the mix a 20 minute reduction in journey time to Waterloo - how the heck does that work then?
Paul
|
|
|
Logged
|
|
|
|
eightf48544
|
|
« Reply #13 on: April 09, 2013, 16:48:19 » |
|
Knowing Windsor quite well the route between the two lines is probably just about feasible. The curve off the Slough line after the bridge would be quite sharp as shown on the map of Phase one almost 180. Then apart from the fact you are close to river (probably require continuous pumpoing during construction) it would be possible to build a cut and cover line to meet end on with the Datchet line. See the alingment. Building it would cause massive disruption to the coach park and the road to Datchet. The curves and gradients could be less than some on East London link at Shorditch or for gradient Farringdon to Blackfriars on Thameslink but not by much.
As far as I could see on their map there was no sign of where the station would be. I presumme that it would be like Crossrail Paddington next to and a lower level than the existing SWT▸ station.
In my view re-instating Bourne to High Wycombe would take priority, over this link, but as we are squeamish about knocking down buildings to build railway lines (for roads it's OK) it's unlikely to happen.It would also require long stretches of double track to cater for 4tph in each direction, this would also apply to the open section between Maidenhead and Bourne End as well. There's also the level crossings in Bourne End and Loudwater to consider. So I don't think there's much chance.
But probably greater than the Winsor Link.
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #14 on: April 09, 2013, 19:28:54 » |
|
I am sure that NR» will GRIP▸ http://www.networkrail.co.uk/aspx/4171.aspx George Bathurst's plans very firmly ......... ............ to death
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
|