Not sure if everyone knows, but from 14th December 2009 First Great Western will be introducing the second loco hauled diagram on their Cardiff - Bristol - Taunton route. As well as extending a number of these trains to Paington & Plymouth, the following peak time services will be worked by a loco hauled train:
07:29 Taunton - Weston Super Mare - Bristol TM‡ - Bristol Parkway
08:00 Cardiff -Bristol TM - Taunton - Paington
17:00 Cardiff - Bristol TM - Taunton
17:21 Bristol TM - Cardiff
Each of the loco hauled services will be operating with at least 5 carriages so particulary with the 08:00 service from Cardiff this should help with overcrowding, especially between Cardiff & Bristol. Thsi should help to free up at least 3 - 4 dmu's some of which are being sent down to the Exeter area to cover for some of the class 142 pacers which are being sent back up to manchester
4 carriages maximum.
ok i was told 5, and i aint sure about the virgin class 57's being brought in as arriva need to have 4 to allow them to work on the Holyhead - Cardiff loco hauled service, of which there is supposed to be another diagram starting in december so at least 3 locomotives are going to be needed per day and i dont think
DBS» have any more class 67's to spare, but i have heard that
DRS▸ /Colas rail class 47's being used. as
FGW▸ need more locomotives to help provide cover for the unreliable class 57's that are used on the sleeper services between London & Penzance