Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:35 09 Jan 2025
 
- Fresh weather warnings for ice across UK
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
9th Jan (2004)
Incorporation of Railway Development Society Ltd (now Railfuture) (link)

Train RunningShort Run
18:56 Exmouth to Paignton
19:15 Paignton to Exmouth
19:17 Exeter Central to Barnstaple
19:25 Exmouth to Paignton
20:19 Exeter Central to Barnstaple
Delayed
17:52 Trowbridge to Great Malvern
18:18 London Paddington to Swansea
18:30 London Paddington to Weston-Super-Mare
18:34 London Paddington to Cheltenham Spa
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 09, 2025, 20:39:17 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[149] Railcard Prices going up
[126] 'Railway 200' events and commemorations 2025
[97] Thumpers for Dummies
[53] Ryanair sues 'unruly' passenger over flight diversion
[36] Thames Valley infrastructure problems causing disruption elsew...
[34] Mick Lynch announces retirement as head of RMT
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 3 4 [5] 6 7 ... 11
  Print  
Author Topic: Chiltern Evergreen 3 - Further new Track Access Agreement Application  (Read 65086 times)
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #60 on: November 28, 2009, 13:29:38 »

The details of work to be done are in the Chiltern 73rd track access application (TAA).  It was linked to in the first post, but now that the consultation is complete, it has changed locations on the NR» (Network Rail - home page) site.

Now at:  http://tinyurl.com/ydf6rty  - the NR site includes the TAA and all the draft timetables, or

http://www.rail-reg.gov.uk/upload/pdf/s22-chiltern-73sa-application-form.pdf - ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) site for TAA only.

Section 6 of the TAA lists all the infrastructure work.  No detailed timetable, but going by the rest of the form they are aiming at completion for Dec 2010...

Interestingly (and a separate issue to the infrastructure work really) there are a number of objections to the new timetable that have appeared in a file on the ORR website.  Including the obligatory 'revenue abstraction' issue from Virgin, cos Chiltern's service will be improved. More surprisingly, ATW (Arriva Trains Wales (former TOC (Train Operating Company))) also have objections, on the assumption that their services will already be running during next year...   Shocked

http://www.rail-reg.gov.uk/upload/pdf/s22-chiltern-73sa-responses.pdf

Edit: It can only be the mainline part of Evergreen 3 that could be signed off so far, as Bicester - Oxford still has to go through the TWA Order approval procedures?

Paul
« Last Edit: November 28, 2009, 13:36:09 by paul7755 » Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #61 on: November 28, 2009, 18:04:24 »

Excellent news! I simply can't wait for the new timetable to start next December! Grin
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #62 on: November 30, 2009, 14:16:55 »

Or the fare rises that will certainly come with it!
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #63 on: November 30, 2009, 15:09:30 »

With one out of the two Birmingham trains an hour terminating at Moor Street, does anyone know what will happen to them? It looks like Phase 1 will have a 12 minute turnaround each hour (quite tight!). Will they sit and block one of the through platforms at Moor Street, or is the long conceived plan to reconnect the bay platform(s) going to happen by next December and mean they can stay out of the way in one of them?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #64 on: November 30, 2009, 15:40:34 »

The work to reconnect the bay platforms at Moor Street is imminent - prep work out on the main lines has already started.

12 minute turn-round wil be easy as a drivers depot will also be there.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #65 on: November 30, 2009, 15:54:20 »

The work to reconnect the bay platforms at Moor Street is imminent - prep work out on the main lines has already started.

12 minute turn-round wil be easy as a drivers depot will also be there.

Thanks for confirming that, Chris. Good to see it finally happening. Though I maintain that 12 minutes is not a lot for a turnaround of a medium distance train on an already very tight schedule. It's 6.5 miles from the previous stop at Solihull and allowing only 8 minutes for a train to make that journey and terminate in a bay platform gives little or no recovery time at all - unusual these days when several minutes are usually added to the final station stop of a train to help massage the PPM(resolve) figures.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #66 on: November 30, 2009, 15:57:43 »

Your forgetting the 'engineering minutes' added to the end time on all their journeys - arrival time is usually at least 5 minutes ahead of timetable time.

THat, and you are looking at a sample timetable, I assume, not a fully working one.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #67 on: November 30, 2009, 17:04:08 »

Looking through those objections, there are some very valid points, not least those of ATW (Arriva Trains Wales (former TOC (Train Operating Company))) re the 'penalty' or extra services and unused slots currently;

however, I'm on Chiltern's side definitely over most of Centro's points - London Midland is the local stations operator for Birmingham, not Chiltern - and to request that Chiltern cover London Midland's inadequacies just because they pass through the relevant stations, isn't fair on Chiltern.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #68 on: November 30, 2009, 17:24:09 »

Your forgetting the 'engineering minutes' added to the end time on all their journeys - arrival time is usually at least 5 minutes ahead of timetable time.

THat, and you are looking at a sample timetable, I assume, not a fully working one.

Whilst taking your point about the difference between working and public timings, I assume the southbound departure times from Moor Street are accurate at around xx:30, and I assume the times for Solihull coming the other way at around xx:10 are also accurate. With over six miles to cover from Solihull and a slow arrival into a bay platform,that will only give a maximum of 12 minutes to turnround, and it doesn't appear to me that there's much scope for increasing those without compromising the timetable further up the line. We'll see what the final versions look like in good time though of course.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #69 on: November 30, 2009, 17:25:26 »

Nothings 'accurate', it's just a sample timetable....
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #70 on: December 01, 2009, 10:47:29 »

Nothings 'accurate', it's just a sample timetable....

I do accept that and hope that my concerns about that turnaround time and others I made earlier in this thread (some of which are mirrored by the official responses from the other interested parties) are addressed.

I suspect that with lots of contentious issues to hammer out still, and the large amount of infrastructure work to carry out, a start date of one years time will be put back and Btline will have to wait a little longer than he hopes for his faster trains - which at the final outcome won't be anywhere near as fast as in that timetable proposal!

As I said, we will see in good time.
« Last Edit: December 01, 2009, 10:57:08 by IndustryInsider » Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
gwr2006
Sr. Member
****
Posts: 137


View Profile
« Reply #71 on: December 09, 2009, 21:36:41 »


Edit: It can only be the mainline part of Evergreen 3 that could be signed off so far, as Bicester - Oxford still has to go through the TWA Order approval procedures?

Paul

Despite the Chiltern Railway's Franchise Agreement requiring the process to be completed by 1st December 2009, as of today, there has been no financial sign-off or agreement between DfT» (Department for Transport - about), Network Rail and Chiltern Railways in relation to any part of Evergreen 3.

None of the parties involved is willing to say when, or if, this will happen.

The Transport & Works Act Order for the Bicester-Oxford (Phase 2) upgrade is also running late and is not due to be submitted now until early January 2010.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #72 on: December 09, 2009, 22:05:48 »


Edit: It can only be the mainline part of Evergreen 3 that could be signed off so far, as Bicester - Oxford still has to go through the TWA Order approval procedures?

Paul

Despite the Chiltern Railway's Franchise Agreement requiring the process to be completed by 1st December 2009, as of today, there has been no financial sign-off or agreement between DfT» (Department for Transport - about), Network Rail and Chiltern Railways in relation to any part of Evergreen 3.

None of the parties involved is willing to say when, or if, this will happen.

The Transport & Works Act Order for the Bicester-Oxford (Phase 2) upgrade is also running late and is not due to be submitted now until early January 2010.

I must admit I had my doubts as well which is why I added the above Edit - I'm wondering if the 'signed off' story was simply based on the Network Rail track access application consultation deadline being passed.  All that meant, as I see it, was that the paperwork was passed to ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) ...

Paul
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #73 on: December 10, 2009, 11:58:00 »

Yes, I noticed that the ORR» (Office of Rail and Road formerly Office of Rail Regulation - about) failed to sign off by the franchise required date of 30th November.

There is obviously a problem - I wonder with which part? Time will tell.
Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #74 on: December 10, 2009, 17:31:32 »

I wonder if its being put quietly on hold while the "Improving value for money" study is being carried out? - http://www.firstgreatwestern.info/coffeeshop/index.php?topic=5875.msg56519#msg56519
Logged

Vous devez ĂȘtre impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 3 4 [5] 6 7 ... 11
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page