Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 17:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 14/01/25 - Rail Sale starts
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
10th Jan (1863)
Metropolitain line opened from Paddington (link)

Train RunningCancelled
13:48 London Paddington to Carmarthen
14:35 London Paddington to Paignton
15:30 London Paddington to Weston-Super-Mare
15:52 London Paddington to Great Malvern
15:54 Cardiff Central to London Paddington
16:12 London Paddington to Bristol Parkway
16:30 London Paddington to Taunton
16:32 Great Malvern to London Paddington
16:36 London Paddington to Plymouth
16:59 Cheltenham Spa to London Paddington
17:00 Oxford to London Paddington
17:18 London Paddington to Swansea
17:50 Cardiff Central to London Paddington
Additional 18:10 Bristol Temple Meads to Gloucester
19:04 Great Malvern to London Paddington
Short Run
14:03 London Paddington to Penzance
14:20 Carmarthen to London Paddington
14:48 London Paddington to Swansea
15:28 Weston-Super-Mare to London Paddington
16:34 Newbury to London Paddington
16:50 London Paddington to Didcot Parkway
17:15 Exeter Central to Barnstaple
17:20 London Paddington to Didcot Parkway
17:28 Weston-Super-Mare to London Paddington
18:29 Gatwick Airport to Reading
18:38 Barnstaple to Exmouth
19:04 Paignton to London Paddington
19:35 Exeter St Davids to London Paddington
22:50 Salisbury to Portsmouth Harbour
Delayed
15:03 London Paddington to Penzance
15:59 Cheltenham Spa to London Paddington
16:13 Exeter Central to Barnstaple
16:31 Barnstaple to Exeter St Davids
An additional train service has been planned to operate as shown 16:57 London Paddington to Swindon
17:33 Barnstaple to Exeter Central
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 17:31:48 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[103] Thames Valley infrastructure problems causing disruption elsew...
[98] Westminster Hall debate : Railway services to South West
[97] Ryanair sues 'unruly' passenger over flight diversion
[87] Mick Lynch announces retirement as head of RMT
[41] Birthday trip, Melksham to Penzance - 28th January 2025
[22] A Beginner's Guide to the Great Western "Coffee Shop" Passenge...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Southampton Tunnel Closure Advance Information  (Read 15150 times)
Timmer
Global Moderator
Hero Member
*****
Posts: 6555


View Profile
« on: July 27, 2009, 18:03:06 »

From FGW (First Great Western) Website advance details of services operating during the forthcoming major engineering work taking place in the tunnel just outside Southampton Central station:
http://www.firstgreatwestern.co.uk/Content.aspx?id=4156
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #1 on: July 28, 2009, 16:04:48 »

An odd fact about the Southampton rail  tunnel is that there is an earlier canal tunnel at a lower level under some of the rail tunnel. It linked the Itchen with the Test avoiding Southampton Water. it was part of the unsucessful canal to Salisbury.

It caused problems with the last big rebuild with it's blockade, which I think was just before electrification.
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #2 on: July 28, 2009, 19:31:20 »

Curiously not, it was around 1981/2, when it was lowered for 8ft 6 containers. (What a difference 6 inches makes.)

That closure led to the construction of the Laverstock chord for diversionary traffic, and a curious arrangement whereby two interweaved lines were used through the tunnel for many months. Hence only train could use it at any time, but trains in different directions used different tracks. Never heard of it used since. 
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #3 on: July 29, 2009, 09:55:52 »


That closure led to the construction of the Laverstock chord for diversionary traffic, and a curious arrangement whereby two interweaved lines were used through the tunnel for many months. Hence only train could use it at any time, but trains in different directions used different tracks. Never heard of it used since. 

Similar arrangemnets still exist on the Tonbridge Hastings lines through several of the tunnels. Due to contractors skimping on the construction the South Eastern found it necessary to add several layers of brick lining hence the need for special stock for the lines and the Schools and the slim jim 33s and slim coaches which ended up in the Hastings DEMUS.

BR (British Rail(ways)) gauntleted the track to allow full size stock to run in the centre of the tunnel. It saves having to have a point. It's very common on continental tram systems particularly at junctions where the poiunt are put back on the reserved right of way and the divergence is on the public road, so that road traffic doesn't run over the moving part of the  points.

A classic place where it should have been used is the junction from Altringham at Piccadilly Gardens where the route to Bury and Piccadilly Station diverge. Instead the point was placed in the raod just where all the buses had to thump over them. Had the point been put a 100 yds back on the reserved right of way, point failures would have been a thing of the past.


Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6555


View Profile
« Reply #4 on: September 15, 2009, 17:33:58 »

More information on how services will be affected by the work in Southampton Tunnel in December/January has been made available by SWT (South West Trains): http://www.southwesttrains.co.uk/SWTrains/Timetablesearch/EngineeringWorks/090413HM.htm
Logged
neilweb
Newbie
*
Posts: 2


View Profile
« Reply #5 on: December 01, 2009, 14:54:05 »

Hi all

You may find this page about the history of the tunnel of interest:

http://news.bbc.co.uk/local/hampshire/hi/people_and_places/history/newsid_8383000/8383071.stm

best wishes
Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #6 on: December 01, 2009, 16:21:08 »

Welcome to the forum, neilweb.
Logged

Vous devez ĂȘtre impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #7 on: December 07, 2009, 21:35:17 »

A post of mine to the SWT (South West Trains) group, I went over to Southampton to see how the weekday single line working turned out...

Quote
Fareham 1054 to Woolston (about 1110 IIRC (if I recall/remember/read correctly)) on the SN service ex Brighton, which
carried on ECS (Empty Coaching Stock) down to St Denys to reverse. Waited for the following SWT stopper
at 1124, arrived at St Denys 1130 ish.

Then a leisurely walk over the footbridge to catch the 1134 onward to
Southampton Central failed miserably, because driver and guard of the 159 from
Romsey decided to head off on the normal timings, ie 1131. SWT management
present rustled up four taxis to Central pretty sharpish.
You'd assume the train crew had been advised of the temporary timings - the PIS (Passenger Information System)
had definitely been changed...

Train movements in up and down directions from Southampton, including a number
of freight services, were basically happening on time, although FGW (First Great Western) were having
one of their 'bad hair days'
, with arrivals in both directions around midday
being well off schedule. The 1207 ex Cardiff arriving about 1300, with pax
transferring to the following 1307. 1310 to Cardiff arrived about 17 down ex
Fratton, and the 1410 started at Southampton having laid over for about an hour
in the up goods loop.

You don't normally notice so much how the trains run in directional groups in
the normal timetable, but it is far more obvious with single line working. For
example around 1310 onwards the FGW Portsmouth, the SN Victoria, the XC (Cross Country Trains (franchise)) Man
Picc and an EWS (English Welsh & Scottish Railway Ltd, now known as DB Schenker Rail (UK (United Kingdom))) container train (waiting in platform 4) all left one after the
other as the signals cleared, it all looked pretty efficent to me. Got me
wondering if the normal timetable is already set up to allow for short periods
of SLW?

Returned on the 1412 Victoria service with no issues, and got a reasonable view
of the tunnel, despite the rain covered train windows. There has been a huge
change over the weekend. It is the up line that remains in normal use, but there
is now a big space where the down side ballast used to be, with men working in
it as trains passed. Surprised to see that much of the exposed floor appears to
be concrete slab already - I wonder if this dates from the previous work in
1981? Excavation proceeding at both portals, and a train of engineers trucks
between the east end of the site and Northam Junction appears to be a source of
materials such as precast slabs.

Passed another SN unit between Mount Pleasant crossing and St Denys, sitting on
the down slow, waiting to form the next departure form Woolston, I assume it
followed my train through St Denys, via the crossover to the down fast.

Hope this of interest...
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #8 on: December 17, 2009, 17:16:20 »

As of yesterday, 16th Dec:

12 days or so into the work in the tunnel, and I reckon about 95% of the down
side slab track has now been concreted. At the station end the transition
between slab and ballasted track (a sort of concrete trough) is being finished
off ready for the connecting track to be laid. At the Northam end there are new
sleepers and rails laid as far as the portal, then a short gap between there and
the slab track.

So far they've had two complete weekends and possibly about 36 hours of
overnight access since the major work began. That is much less than half the
total working time, because the full closure period from 24th Dec to the 4th Jan
allows 10 days of 24hr working.

A number of sources (local BBC» (British Broadcasting Corporation - home page) for one) have suggested that this Christmas is
stage one of two, with the up line planned to be done next Christmas, but I'm
not so sure now. At current progress it wouldn't surprise me if it was finished
in January - I've just checked the NR» (Network Rail - home page) 'rules of the route - possessions register' for
Christmas & New Year 2010/11, and there is no longer any tunnel work showing.

Paul
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #9 on: December 22, 2009, 20:01:04 »

Update today, I noticed from the train that there was very little activity going on in the tunnel, and the FGW (First Great Western) unit took the up line through the tunnel at what seemed normal speed - albeit wrong direction.

So on my way to the shops I took a walk up past the western portal, where there's the site access,  and a couple of the chaps working there reckoned the down line is complete apart from some tidying up work, and the up line work will start 'at the weekend'. (Christmas day perhaps, if that's a working day for the project - I'm not sure on that though.)

Probable that they planned a couple of days for contingencies, it's good if they haven't been needed.

During the last couple of weekends they have also been renewing track between St Denys and Bitterne, across the Adelaide Rd level crossing - so they're certainly making the most of the closures.

Paul

Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #10 on: December 27, 2009, 10:38:47 »

Boxing day morning - signs of progress.

Still removing ballast at east end portal. At the west end, a number of 60ft slab track panels have already been positioned in the tunnel, and some precast slabs placed where the transition section from slab to ballasted track will eventually be.   Based on what I saw earlier in the works, this must mean that the 'west end' excavations down to sub base level have already been completed.

Paul
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 19094


Justice for Cerys Piper and Theo Griffiths please!


View Profile Email
« Reply #11 on: January 04, 2010, 14:31:21 »

From the BBC» (British Broadcasting Corporation - home page):

Quote
City rail tunnel reopens on time
 
A railway tunnel under Southampton has reopened as planned after being closed since Christmas Day.

Rail users travelling towards Eastleigh from Southampton Central were forced to use buses during the 10-day closure.

The tunnel has been undergoing work since November to increase its height for lorry traffic.

The work is part of a ^71m upgrade to allow a new generation of larger freight containers to travel to the docks by rail instead of road.

Network Rail said the upgrade would mean 50,000 fewer lorries a year on the roads.

A revised timetable affecting off-peak and weekend services will continue to operate until Sunday 10 January.
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #12 on: January 04, 2010, 15:08:56 »

The tunnel work seems all over bar the shouting. Passed through this morning, seemed to be at typical line speed, although only the down line is in use (as planned).  The whole tunnel interior seems pretty clear of junk, though it still appears to need all the cable carriers to be permanently sorted out AFAICS (As Far As I Can See).  There is still tons of equipment in the works compounds set up at the west end of the tunnel though.

Surprised that there is little or no feeling of the track changing height at either end, although the transition from ballast to slab is visibly sloping at the station end.

Paul
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2039


View Profile
« Reply #13 on: January 04, 2010, 19:33:47 »


BR (British Rail(ways)) gauntleted the track to allow full size stock to run in the centre of the tunnel. It saves having to have a point. It's very common on continental tram systems particularly at junctions where the poiunt are put back on the reserved right of way and the divergence is on the public road, so that road traffic doesn't run over the moving part of the  points.

A classic place where it should have been used is the junction from Altringham at Piccadilly Gardens where the route to Bury and Piccadilly Station diverge. Instead the point was placed in the raod just where all the buses had to thump over them. Had the point been put a 100 yds back on the reserved right of way, point failures would have been a thing of the past.

The other reason for gauntletting tram tracks as they come up to a junction is about points. Some tram systems allow the driver to set the points by taking/not taking current as the tram passes a detector in the overhead. That's fine on an 'ordinary' piece of track, but it doesn't work at a road junction, where the tram may well have been held by the lights -and so all trams will need to be taking current.

So you move the point back from the junction - then the driver can select the route before they get to the lights.
Logged
grahame
Administrator
Hero Member
*****
Posts: 43080



View Profile WWW Email
« Reply #14 on: January 04, 2010, 21:01:31 »

Paul, your "newscasts" in this thread are very much read and appreciated - just want to say Thank You!
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page