Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:35 06 Jan 2025
 
- Taxi driver who stoked Southport riots jailed
- Works on 'road from hell' to end after 23 years
- 'Second chance at life' after UK's first liver transplant for advanced bowel cancer
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 08/01/25 - Steam loco restoration - IRTE
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
6th Jan (1968)
Hixon Railway accident (link)

Train RunningCancelled
20:05 Liskeard to Looe
20:37 Looe to Liskeard
20:42 Bedwyn to London Paddington
20:51 Bristol Temple Meads to Bristol Parkway
21:05 Liskeard to Looe
21:37 Looe to Liskeard
Short Run
19:36 Didcot Parkway to London Paddington
19:59 Cheltenham Spa to London Paddington
21:21 Bristol Parkway to Trowbridge
Delayed
18:30 London Paddington to Weston-Super-Mare
19:18 Trowbridge to Cardiff Central
20:22 Reading to Shalford
20:38 Maidenhead to Marlow
21:30 Shalford to Reading
07/01/25 04:50 Fratton to Salisbury
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 06, 2025, 20:47:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[97] New Adlestrop Railway Atlas update
[56] Mining in Cornwall
[43] DFT - Where is the South Devon Railway
[41] 2024 - Service update and amendment log, Swindon <-> Westbury...
[39] Bridport branch reopening proposal
[39] Bath to Bridgnorth and back 4/1/25
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 131 132 [133] 134 135 ... 176
  Print  
Author Topic: Great Western Main Line electrification - ongoing discussion  (Read 1135903 times)
Bmblbzzz
Transport Scholar
Hero Member
******
Posts: 4256


View Profile
« Reply #1980 on: October 03, 2016, 22:44:21 »

Very interesting write up and photos.

As for a picture.....





Ah a blue hat ........... that tells a tale  Grin
UN peacekeepers separating the armies of Offa and Tewdric?  Shocked
Logged

Waiting at Pilning for the midnight sleeper to Prague.
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #1981 on: October 04, 2016, 00:45:29 »


UN peacekeepers separating the armies of Offa and Tewdric?  Shocked

Bloody Corbynistas getting in everywhere.
Logged

Now, please!
onthecushions
Transport Scholar
Hero Member
******
Posts: 977


View Profile
« Reply #1982 on: October 04, 2016, 11:42:33 »

At last! The OLE (Overhead Line Equipment, more often "OHLE") fairy has blessed Reading station with some dangly bits. Though you might quibble that chunks of steel rigidly bolted on like those don't so much dangle as stick out awkwardly.

And aren't they awkward? Series One has been criticised for being so chunky, but that's mainly the supporting structures (portals, posts, and cantilevers). The OLE stuff that gets attached looks - well at least it looks like it was designed. This looks like whatever was around in the steelyard when the job needed to be done.

As I recall it, Reading was to be fitted out for OLE within RSAR, but the design work started before it was decided to electrify the GWML (Great Western Main Line) (or for Crossrail to come all the way). Series One was designed for the GW (Great Western), from 2011 to 2015.

I wonder what's going to fix onto the end of those skyhooks? I don't think Series One will fit. Perhaps Series two, or the design Furrer and Frey did for the GE (which must be similar to Series Two)?

Perhaps my artistic judgement isn't up to much but I think the appearance of the supports pictured is much better than the Series 1 plonked (illegally?) in the Goring Gap AONB (Areas Of Natural Beauty)'s. The diagonal latticework is quite elegant - it's the same as BR (British Rail(ways)) Mark 1 I believe and must be a more efficient material design than the crude square cut-outs of NR» (Network Rail - home page) Series 1. Also, the solid I sections at least meet at the ends rather than overlapping like temporary scaffolding. The various risers and droppers don't show so much in the distance and are at least functionally necessary. I do though wonder why the prominent ATF feed needs to be run above the portal as it has to drop down to troughers for bridges etc frequently. A neater solution would have been to run it at ground level like the 33kV feed for 750V dc substations.

OLE Nerd,

OTC
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #1983 on: October 04, 2016, 11:50:51 »

I've been for a ride into PAD» (Paddington (London) - next trains) this morning from THA, and more and more OLE (Overhead Line Equipment, more often "OHLE") uprights are appearing on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) (aside from between Theale and Reading where I only noted a couple).

What I also noticed is that some of the uprights look quite thin/lightweight in nature, and don't look like they would support the heavy lattice-type crossbeams that seem to predominate between RDG(resolve) and PAD.

Does this mean that lighter-weight OHLE is being installed on the B&H?
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #1984 on: October 04, 2016, 12:06:06 »

I do though wonder why the prominent ATF feed needs to be run above the portal as it has to drop down to troughers for bridges etc frequently. A neater solution would have been to run it at ground level like the 33kV feed for 750V dc substations.


Running a bare cable at a height will cost a small fraction of a replacement 25kV insulated cable to go into troughs.  AIUI (as I understand it) the insulated cable has to have a greater cross-section for the same current, because it will not radiate heat into free air.

Paul
Logged
John R
Hero Member
*****
Posts: 4416


View Profile
« Reply #1985 on: October 04, 2016, 12:08:04 »

Typically on double track lines there is no span across the whole width, with each track having completely independent structures.  So yes, they would be lighter, but it's completely normal.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #1986 on: October 04, 2016, 13:02:31 »

Typically on double track lines there is no span across the whole width, with each track having completely independent structures.  So yes, they would be lighter, but it's completely normal.

The top picture on page 4 of the Furrer and Frey Series 1 pamphlet (link below) shows the typical set up for a two track railway, they mention that they would use a twin track cantilever on one side if they needed to provide a gap for signal sighting.

http://www.furrerfrey.ch/dam/jcr:98f3522c-51ff-4d89-9fd7-dc16601d1db3/140918_F%20F_Series1_pamphlet_onlinePub.pdf

Paul
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1987 on: October 04, 2016, 18:56:49 »

I do though wonder why the prominent ATF feed needs to be run above the portal as it has to drop down to troughers for bridges etc frequently. A neater solution would have been to run it at ground level like the 33kV feed for 750V dc substations.


Running a bare cable at a height will cost a small fraction of a replacement 25kV insulated cable to go into troughs.  AIUI (as I understand it) the insulated cable has to have a greater cross-section for the same current, because it will not radiate heat into free air.

Paul

As Pauls said.  The cable used for ground level is 400mm2 has to be placed in troughing, general rule is at lease 1m from other cables all of which makes it an expensive option.  Also its screening effect is less effective when run as a cable.
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1350



View Profile
« Reply #1988 on: October 04, 2016, 20:33:28 »

The cable used for ground level is 400mm2 has to be placed in [t]roughing...

So that is nearly an inch in diameter.  How thick is the insulation wrapped around that for a 25kV service?

Me thinks that this will become a mighty cable - worthy of its own trough!
Logged
Thatcham Crossing
Transport Scholar
Hero Member
******
Posts: 793


View Profile
« Reply #1989 on: October 04, 2016, 22:22:45 »

Thanks to JohnR and Paul7755 for the explanations, supported by documentation. Guess I was forgetting that this is a 2 track railway (in the main) which will have independent structures over each side of it.
Logged
chrisr_75
Hero Member
*****
Posts: 1019


View Profile
« Reply #1990 on: October 05, 2016, 09:55:45 »


There was a bi-lingual crew from BBC» (British Broadcasting Corporation - home page) Wales so I suspect there will be something from them on screen later in the week.


This popped up this morning:

http://www.bbc.co.uk/news/uk-wales-south-east-wales-37553620

There could well be something related on the BBC Wales/S4C news this evening
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #1991 on: October 05, 2016, 13:58:42 »

Intersting. I looked at the flights from Cardiff to London City - there are three daily, operated by Flybe. The aircraft is a Bombardier Dash 8 Q400. If you don't want the sparrowfart flight, you can do the return for under £100, with a journey time today of 33 minutes. The early (8.00am) plane costs £115 to LCY with hand luggage only, which seems rather competitive for the busy executive. Shame then that the flights are only for the duration of the tunnel closure.

Stats etc here on Flightradar24. I love the routing into London City - that is nothing unusual. I have seen flights from Dublin taken almost to France to fit in with the traffic. The approach from the east is almost the same as Heathrow.
Logged

Now, please!
ChrisB
Transport Scholar
Hero Member
******
Posts: 13019


View Profile Email
« Reply #1992 on: October 05, 2016, 14:00:07 »

I suispect that the margins on those prices wouldn't stand up for any length of time....
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #1993 on: October 05, 2016, 14:10:52 »

I suispect that the margins on those prices wouldn't stand up for any length of time....

Possibly there is a contract with the Welsh government. Margins on aircraft are tiny compared to the capital cost of the kit. I once had the privilege of the jump seat in the cockpit of a 737 flying into Stanstead. After we landed, the pilot switched to ground power before shutting the engines down. He told me that cost £16 per hour, whereas running the auxilliary power unit cost £36 per hour. The turnround time was 40 minutes, and the difference in the two costs could be the difference between profit and loss on a flight.

If Flybe haven't anything else for a Dash 8 and a crew to do, this would seem a good idea in the long term, but I reckon they have put special measures into place, maybe cancelling a bit of leave and chartering an aircraft - although they own the one used on the flights yesterday.
Logged

Now, please!
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #1994 on: October 05, 2016, 17:24:26 »

I suispect that the margins on those prices wouldn't stand up for any length of time....

Possibly there is a contract with the Welsh government. Margins on aircraft are tiny compared to the capital cost of the kit. I once had the privilege of the jump seat in the cockpit of a 737 flying into Stanstead. After we landed, the pilot switched to ground power before shutting the engines down. He told me that cost £16 per hour, whereas running the auxilliary power unit cost £36 per hour. The turnround time was 40 minutes, and the difference in the two costs could be the difference between profit and loss on a flight.

If Flybe haven't anything else for a Dash 8 and a crew to do, this would seem a good idea in the long term, but I reckon they have put special measures into place, maybe cancelling a bit of leave and chartering an aircraft - although they own the one used on the flights yesterday.

It's curious that an aircraft shuts it's engines down when stationery but an HST (High Speed Train) (and sometimes 165/6) keep theirs running. Knowing that there are issues starting up an HST engine, I wonder what the financial cost of keeping those engines on are.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 131 132 [133] 134 135 ... 176
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page