Well spotted, DidcotPunter! I've been waiting for a glimpse. If that is five units in the pictures, there are still 18 to deliver. The two vehicles to the rear of the train appear to be almost identical. The third looks like the one that holds the pile vertical. I believe the white shields are used to allow working next to a live line. Any insider info here?
That's how
NR» describe the shields:
http://www.networkrailmediacentre.co.uk/Gallery/The-steel-safety-39-wall-39-on-the-HOPS-to-allow-adjacent-line-working-at-speed-1bf2.aspxThere are a number of descriptions knocking about of the functions of different modules, but one thing I've gleaned is that certain modules can split again on site, so the lead section, referred to as 'the' piling module, is two (or three) sets of equipment that can run independently. So I wonder if the best idea is to think of it as having five functional tasks, but there'll be more than five separate sections when in operation.
The NR Electrification
RUS▸ of 2009 has a fairly detailed explanation (in its Appendix 2) of what they intended it to look like when ordered, obviously it may be slightly different by now but it gives a good idea including artists impressions. The press release containing the picture I linked to above also describes the five functional areas of the train:
- A piling rig, with two MPVs with Movax vibro piling heads, which literally vibrate the steel piles into the soil, 2 pile carrying wagons, and finally a Fambo hydraulic percussion hammer MPV for tougher ground.
- An excavation and concrete batching consist. This will feature an Hitachi excavator plus a Kniele concrete unit which will mix concrete from onboard aggregate, cement and water tanks.
- A structures consist, which will erect the Series One masts, portal booms and twin track cantilevers. It is intended to carry 30 masts for erection, per night.
- Ancillary conductor consist, which will install the earthing wires, return wires and small parts such as registration arms and other equipment.
- The contact and catenary consist, which will string up the remaining wires, under tension. Another unit install other articles such as contenary wires under low bridges, neutral sections and record information such as height and stagger.
Each consist will include two MPVs with full driving cabs, powered by
MTU▸ power packs, which can be driven at 60mph off-site. On site driving cabs will allow the train to be driven very slowly in possessions, such as when installing contact
wire.
http://www.networkrailmediacentre.co.uk/News-Releases/Groundbreaking-factory-train-to-cut-years-off-Great-Western-electrification-1e0d.aspxNote for instance how the explanation of the first 'consist' of the five includes 3 MPVs.
Paul