Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:55 21 Apr 2025
 
- Passengers evacuate Delta plane after engine fire
- Gatwick worst for delays among UK airports
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
21st Apr (1958)
Battery Multiple Unit enters public service (link)

Train RunningCancelled
16:50 Penzance to Cardiff Central
17:50 Penzance to London Paddington
18:37 London Paddington to Swansea
18:45 London Paddington to Great Malvern
19:04 Great Malvern to London Paddington
19:59 Gatwick Airport to Reading
20:06 Westbury to Cheltenham Spa
20:07 London Paddington to Didcot Parkway
20:31 Swindon to Worcester Shrub Hill
20:35 Basingstoke to Reading
20:38 Didcot Parkway to London Paddington
20:38 Maidenhead to Marlow
20:44 Bedwyn to Newbury
20:48 Reading to Oxford
20:50 St Erth to St Ives
20:52 Reading to Basingstoke
20:56 Worcester Foregate Street to London Paddington
20:59 Cheltenham Spa to London Paddington
21:00 London Paddington to Plymouth
21:01 Basingstoke to Reading
21:04 Marlow to Maidenhead
21:05 St Ives to St Erth
21:05 Newbury to Bedwyn
21:05 Reading to Newbury
21:08 Newbury to Reading
21:10 Weston-Super-Mare to Bristol Parkway
21:15 London Paddington to Oxford
21:20 St Erth to St Ives
21:22 Reading to Basingstoke
21:30 Basingstoke to Reading
21:37 St Ives to St Erth
21:37 Bedwyn to Newbury
21:38 Maidenhead to Marlow
21:44 Didcot Parkway to Reading
21:46 Bristol Temple Meads to Severn Beach
21:46 Twyford to Henley-On-Thames
21:56 Newbury to Reading
21:57 Newbury to Bedwyn
22:01 Henley-On-Thames to Twyford
22:01 Oxford to London Paddington
22:04 Marlow to Maidenhead
22:08 Newbury to Reading
22:10 Reading to Newbury
22:13 Basingstoke to Reading
22:16 Cheltenham Spa to Swindon
22:21 Reading to Didcot Parkway
22:25 Bedwyn to Newbury
22:30 St Erth to St Ives
22:30 London Paddington to Bedwyn
22:40 Severn Beach to Bristol Temple Meads
22:47 Newbury to Bedwyn
22:47 Newbury to Reading
22:48 St Ives to Penzance
22:53 Didcot Parkway to Reading
23:07 Oxford to London Paddington
23:17 Bedwyn to Reading
23:30 Cardiff Central to Bristol Temple Meads
Additional 23:36 Westbury to Bristol Temple Meads
23:42 Swindon to Cheltenham Spa
23:45 Bristol Temple Meads to Frome
Short Run
16:00 London Paddington to Penzance
16:15 Penzance to London Paddington
17:00 London Paddington to Penzance
17:37 London Paddington to Carmarthen
18:00 Cardiff Central to Penzance
18:00 London Paddington to Penzance
18:15 Penzance to Exeter St Davids
18:24 Portsmouth Harbour to Cardiff Central
18:30 Cardiff Central to Portsmouth Harbour
18:30 London Paddington to Plymouth
19:00 Cardiff Central to Penzance
19:00 London Paddington to Plymouth
19:04 Paignton to London Paddington
19:15 Taunton to Cardiff Central
19:23 Portsmouth Harbour to Cardiff Central
19:28 Cardiff Central to Portsmouth Harbour
19:45 Great Malvern to London Paddington
19:59 Cheltenham Spa to Swindon
20:00 Cardiff Central to Taunton
20:00 London Paddington to Plymouth
20:11 Salisbury to Bristol Temple Meads
20:24 Exmouth to Cardiff Central
20:29 Gatwick Airport to Reading
20:30 Cardiff Central to Portsmouth Harbour
20:59 Cardiff Central to Bristol Temple Meads
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 21, 2025, 21:12:52 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[108] Fortuitous connections ... and an App which fails to offer the...
[93] Firstgroup's rail division trading 'ahead of expectations'
[77] Eyesight rules for motorists unsafe, says coroner
[64] RNLI station celebrates 10 years of saving lives - Portishead,...
[56] Yeovil Railway Centre - South chord project
[53] Every way to travel between Devon/Cornwall to London rated
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 2 3 [4]
  Print  
Author Topic: Electrification and its implications for Bath's heritage (merged topics)  (Read 29242 times)
Electric train
Transport Scholar
Hero Member
******
Posts: 4531


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #45 on: August 11, 2012, 08:49:40 »


Do Network Rail need the permission of the local authority to build a fence on their property? I thought as a 'statutory undertaking' they didn't need planning permission from LAs, rather the application is made to the Secretary of State for Transport.

This is a complex area certain things Network Rail can do without seeking planning consent, usually consultation is done with the LA.  A permanent fence could be erected if the ORR» (Office of Rail and Road, formerly Office of Rail Regulation - about) (HMRI (His Majesty's Railway Inspectorate)) placed an improvement notice or Prohibition notice on Network Rail it would appear the the ORR are sitting on the fence on this one though as they know the level of public opinion so have just raised safety concerns with Network Rail.  School holidays and in particular the latter end of August (kids get board) have the highest levels of trespass and vandalism.
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Rhydgaled
Hero Member
*****
Posts: 1500


View Profile WWW
« Reply #46 on: August 11, 2012, 10:11:59 »

From the picture of Sydney Gardens earlier on, it looks a bit difficult. However, there is a wall and a railway is dangourous enough anyway, if there hasn't been a fence for years there's no reason why overhead electrification should mean they add a fence. The wires will be high above the heads of foolish trespassers, surely walking on the track you are further from the wires than standing on a platform. In other words, the only real saftey concern is getting hit by a train, which has been that way for years. Maybe they should put some razor wire on the ballast just on the railway side of the wall to deter tresspassing.

As for The Royal Border Bridge, the OHLE (Over-Head Line Equipment (electrification via catenary)) structures are not really very noticable above the level of the stonework, but I really dislike it when they bolt the legs of OHLE masts to the outside of a bridge like that. Hopefully masts as discrete as those on the Royal Border Bridge can be used for things like the Maidenhead bridge but with the legs of the masts hidden within the walls.
Logged

----------------------------
Don't DOO (Driver-Only Operation (that is, trains which operate without carrying a guard)) it, keep the guard (but it probably wouldn't be a bad idea if the driver unlocked the doors on arrival at calling points).
Electric train
Transport Scholar
Hero Member
******
Posts: 4531


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #47 on: August 11, 2012, 12:00:30 »

As for The Royal Border Bridge, the OHLE (Over-Head Line Equipment (electrification via catenary)) structures are not really very noticable above the level of the stonework, but I really dislike it when they bolt the legs of OHLE masts to the outside of a bridge like that. Hopefully masts as discrete as those on the Royal Border Bridge can be used for things like the Maidenhead bridge but with the legs of the masts hidden within the walls.
The attachment method depends on a number of factors, design if the viaduct, if there is a curve (greater turning moment at the base of the OHLE mast if it has push or pull of the wire this link is to Wharncliffe Viaducthttp://www.geograph.org.uk/photo/205167.

Folks also for get in the romantic age of steam there were hideous telegraph wires as this 1892 image shows  http://www.perivalewood.purplecloud.net/Portway/pages/Hanwell%20Wharncliffe%20Viaduct%201892.htm
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #48 on: August 11, 2012, 12:20:08 »

Do Network Rail need the permission of the local authority to build a fence on their property? I thought as a 'statutory undertaking' they didn't need planning permission from LAs, rather the application is made to the Secretary of State for Transport.

The exemptions for statutory undertakers are all set out in the the Town and Country Planning (General Permitted Development) Order 1995 (Schedule 2 Part 17 Class A). This would exclude the errection of a fence and so this would not require planning permision.  However the structure concerned is in a conservation area, planning permission may still be required for a fence since it is not one of the matter listed in article 4.
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6642


The artist formerly known as Four Track, Now!


View Profile
« Reply #49 on: September 25, 2012, 20:39:22 »

A permanent fence could be erected if the ORR» (Office of Rail and Road, formerly Office of Rail Regulation - about) (HMRI (His Majesty's Railway Inspectorate)) placed an improvement notice or Prohibition notice on Network Rail it would appear the the ORR are sitting on the fence on this one though as they know the level of public opinion so have just raised safety concerns with Network Rail.  School holidays and in particular the latter end of August (kids get board) have the highest levels of trespass and vandalism.

Grin
Logged

Now, please!
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 2 3 [4]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page