Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 07:15 10 Jan 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025
28/01/25 - Coffee Shop 18th Birthday

On this day
10th Jan (2017)
Defibrillators discussion pack published by Network Rail (link)

Train RunningCancelled
05:59 Gatwick Airport to Reading
06:19 Par to Plymouth
06:51 Reading to Redhill
07:20 London Paddington to Oxford
08:36 Redhill to Reading
09:00 Oxford to London Paddington
Short Run
06:31 Severn Beach to Weston-Super-Mare
06:52 Newbury to London Paddington
06:57 Cardiff Central to Bristol Temple Meads
06:58 Penzance to St Ives
07:17 Didcot Parkway to London Paddington
08:05 London Paddington to Newbury
08:34 London Paddington to Didcot Parkway
Delayed
06:48 London Paddington to Carmarthen
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 10, 2025, 07:27:31 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[94] Thumpers for Dummies
[71] Railcard Prices going up
[58] Thames Valley infrastructure problems causing disruption elsew...
[50] Outstanding server / web site issues
[49] 'Railway 200' events and commemorations 2025
[46] Ryanair sues 'unruly' passenger over flight diversion
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 12 13 [14] 15 16 ... 27
  Print  
Author Topic: Christmas and Boxing Day trains - ongoing discussion  (Read 135145 times)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #195 on: December 27, 2014, 12:03:07 »

I think it's fair to expect reliability of the service to dip a bit during the last couple of years and up until the end of the decade as there is so much work going on at the moment.  But what we've seen during 2014 is much worse that I would have expected, and the passengers on the FGW (First Great Western) network (and the staff on the front line) deserve better.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #196 on: December 27, 2014, 16:51:58 »

The Kings Cross overrun is due to a major S & C (switches & crossing) renewal at Hollow Way Road, the work is on the UP side between (the UP Fast and UP Slow) are on the same side of the permanent way on the ECML (East Coast Main Line) north of Copenhagen Tunnel, work involved deep dig, which effected signalling and traction cables to the Down lines; I don't know why they got so far behind although when major track work like this is done unforeseen problems emerge the only recovery plan once all the old track is removed is to keep going if there is a problem.

The plan was to get the Slow's handed back for 09:00 service Saturday morning, the Thameslink OLE (Overhead Line Equipment, more often "OHLE") work on the Slow lines between Copenhagen and Gasworks Tunnels was completed in time; although some work was cut from the programme on Boxing Day night to ensure Thameslink was ready for energisation and testing of the OLE Saturday morning
« Last Edit: December 27, 2014, 17:35:36 by Electric train » Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8451



View Profile
« Reply #197 on: December 27, 2014, 17:34:51 »

The Kings Cross overrun is due to a major S & C (switches & crossing) renewal at Hollow Way Road, the work is on the UP side between (the UP Fast and UP Slow) are on the same side of the permanent way on the ECML (East Coast Main Line) north of Copenhagen Tunnel, work involved deep dig

....and the Paddington overrun, unannounced until this morning (at least those heading North from Kings X had some warning) - due to utter incompetence from what I am told......what a disgrace.
Logged
Super Guard
Hero Member
*****
Posts: 1308


View Profile
« Reply #198 on: December 28, 2014, 21:02:23 »

The Kings Cross overrun is due to a major S & C (switches & crossing) renewal at Hollow Way Road, the work is on the UP side between (the UP Fast and UP Slow) are on the same side of the permanent way on the ECML (East Coast Main Line) north of Copenhagen Tunnel, work involved deep dig

....and the Paddington overrun, unannounced until this morning (at least those heading North from Kings X had some warning) - due to utter incompetence from what I am told......what a disgrace.

Source?
Logged

Any opinions made on this forum are purely personal and my own.  I am in no way speaking for, or offering the views of First Great Western or First Group.

If my employer feels I have broken any aspect of the Social Media Policy, please PM me immediately, so I can rectify without delay.
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8451



View Profile
« Reply #199 on: December 29, 2014, 06:21:53 »

The Kings Cross overrun is due to a major S & C (switches & crossing) renewal at Hollow Way Road, the work is on the UP side between (the UP Fast and UP Slow) are on the same side of the permanent way on the ECML (East Coast Main Line) north of Copenhagen Tunnel, work involved deep dig

....and the Paddington overrun, unannounced until this morning (at least those heading North from Kings X had some warning) - due to utter incompetence from what I am told......what a disgrace.

Source?

Impeccable.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #200 on: December 29, 2014, 06:40:43 »

You're unable to verify it then?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8451



View Profile
« Reply #201 on: December 29, 2014, 06:55:22 »

You're unable to verify it then?

Verified by someone very close to the situation, whose details I am not going to share here for obvious reasons.......whether you choose to accept that of course is entirely up to you, but in the context of the overall chaotic situation at Paddington on Saturday I'm sure others will draw their own conclusions.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #202 on: December 29, 2014, 07:13:06 »

Ok, well thanks for giving a little more clarification.

Rumours are always rife in situations such as those, so a reliable source of, say, a member of staff in one of the control offices who was liaising with Network Rail (or one from Network Rail liaising with the contractor) would indeed be trustworthy, but I might not be quite so confident in other sources.

Either way, ''utter incompetence" will obviously mean that a clear source of the problem will be evident and as such there will be no excuse for appropriate sanctions not being taken.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4497


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #203 on: December 29, 2014, 08:30:11 »

Ok, well thanks for giving a little more clarification.

Rumours are always rife in situations such as those, so a reliable source of, say, a member of staff in one of the control offices who was liaising with Network Rail (or one from Network Rail liaising with the contractor) would indeed be trustworthy, but I might not be quite so confident in other sources.

Either way, ''utter incompetence" will obviously mean that a clear source of the problem will be evident and as such there will be no excuse for appropriate sanctions not being taken.

I agree.  Often to the person leaning on a shovel by the side of the track or the person with a flag and whistle on a platform i.e. the guys on the ground don't see all the cross company communications at Route level, sometimes information is not cascaded effectively to person leaning on a shovel by the side of the track or the person with a flag and whistle on a platform
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8451



View Profile
« Reply #204 on: December 29, 2014, 08:51:21 »

Ok, well thanks for giving a little more clarification.

Rumours are always rife in situations such as those, so a reliable source of, say, a member of staff in one of the control offices who was liaising with Network Rail (or one from Network Rail liaising with the contractor) would indeed be trustworthy, but I might not be quite so confident in other sources.

Either way, ''utter incompetence" will obviously mean that a clear source of the problem will be evident and as such there will be no excuse for appropriate sanctions not being taken.

I agree.  Often to the person leaning on a shovel by the side of the track or the person with a flag and whistle on a platform i.e. the guys on the ground don't see all the cross company communications at Route level, sometimes information is not cascaded effectively to person leaning on a shovel by the side of the track or the person with a flag and whistle on a platform

Bloke with shovel was not my source, but to paraphrase Electric Train lets just say "information was not cascaded effectively" and leave it at that......it's not a new problem for FGW (First Great Western), but one that is within their control and needs addressing.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #205 on: December 29, 2014, 09:17:38 »

I've taken a look at the FGW (First Great Western) control log and it runs into several pages listing how the problem developed.  'Utter incompetence 'is probably a little strong, but as the situation developed in the early hours it did appear that several work-around solutions to several outstanding issues with the possessions promised to, and then by, Network Rail simply didn't happen - for a variety of reasons.

That led to several plans and changes of plan being adopted by FGW to try and get the best possible outcome for their passengers.  Because various things were promised I can see how the controllers got pretty exasperated with having to change their plans several times. Not sure that it was a case of FGW not providing the information, more that they were promised things that didn't happen and in the end it looks like they were very wary of trusting anything that was said!

Hopefully a full enquiry (along with the same for the far more disruptive Kings Cross situation) will cause the situation to improve in the future, though on the face of it I think both passengers and staff will believe it when they see it!  A bad Christmas for the integrity and image of the railway industry.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
broadgage
Transport Scholar
Hero Member
******
Posts: 5632



View Profile
« Reply #206 on: December 29, 2014, 12:49:15 »

I can understand the arguments either way regarding trains on boxing day, but IMHO (in my humble opinion), a first step might be to provide a reliable service on the day AFTER boxing day !

Logged

A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard.
It has space for cycles, surfboards,luggage etc.
A 5 car DMU (Diesel Multiple Unit) is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
Timmer
Global Moderator
Hero Member
*****
Posts: 6554


View Profile
« Reply #207 on: December 29, 2014, 17:04:00 »

I can understand the arguments either way regarding trains on boxing day, but IMHO (in my humble opinion), a first step might be to provide a reliable service on the day AFTER boxing day !
Before they can start to think about running services on Boxing Day, TOCs (Train Operating Company) need to sort out the annual 'cancelled due to a lack of train crew' that plagues the network every year between Christmas and New Year. There were some long distance casualties on the FGW (First Great Western) network yesterday that would have caused inconvenience and overcrowding on those services that did run.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13029


View Profile Email
« Reply #208 on: December 29, 2014, 17:12:51 »

Difficult....unions would make any form of discipline very hard to implement where it was deemed necessary. Ditto any changes to rest-day working, where as I understand it, staff can easily change their minds without penalty
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10363


View Profile
« Reply #209 on: December 29, 2014, 22:03:57 »

Ditto any changes to rest-day working, where as I understand it, staff can easily change their minds without penalty

That's not quite the case.  The precise rules vary from depot to depot, but by and large if you volunteer to work a rest day you can't then withdraw that application after the roster has been published if you've been booked out - usually about 5 days in advance, so there should be no problem in that respect.

Like I said in a previous post, if depots trained their staff on the routes and traction and filled some more of the vacancies that exist there would be little need for rest day working for much of the year and any shortfalls over Christmas and New Year (along with high summer school holidays) wouldn't exist.  At least the vacancy situation should improve over the coming months though as more of the trainee drivers pass out.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 12 13 [14] 15 16 ... 27
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page