Lots of work going on today.
At Evesham, the semaphore signal arms have been removed, though the posts are still in place. The new junction point is still laid out near the signalbox waiting to be moved up the line.
Rail welding was under way at Littleton & Badsey, where both lines are now complete heading east towards Clayfield and west towards the eastern of the two River Avon bridges at Evesham after slewing and connection of the assorted bits of new track here. I don't know if track is being placed on the eastern bridge yet, but so far no sign yet of work on the western bridge near the signalbox.
Honeybourne was a hive of activity. Asphalt was being laid on the base of the footbridge ramp on the new platform, which was just waiting for its top surface and fencing. A team of masons was building the other ramp base alongside the station car park and a ballast train was waiting to be sent west. Tracklaying and ballasting on the new Long Marston branch connection is complete.
After the ballast train had moved off, I set off to take a look at the new crossover, which is in position west of the station. By the time i reached the bridleway crossing, the train had been shunted from the down line to the up using the crossover, which was being operated manually and clipped between train moves. After a short pause, the train went 'wrong line' towards Clayfield but I don't know where it was headed. The shunting signal is now in place next to the bridleway crossing for trains moving from the down line (the one towardsWorcester) on to the branch line or into the sidings.
At Chipping Campden double track is in place through the level crossing and the bearers and surface sections for the road are awating installation. At Blockley work to lay the level crossing road surface was taking place.
Pictures at
http://www.flickr.com/photos/willc2009/