Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 06:15 08 Jan 2025
 
- Boy, 14, stabbed to death on London bus
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
05:57 Liskeard to Looe
06:20 Windsor & Eton Central to Slough
06:30 Looe to Liskeard
06:40 Windsor & Eton Central to Slough
07:20 Liskeard to Looe
07:54 Looe to Liskeard
Short Run
05:59 Gatwick Airport to Reading
08:35 Plymouth to London Paddington
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 06:27:05 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[192] Coastal walks - station to station
[169] 'Railway 200' events and commemorations 2025
[74] Fatal Oxfordshire train crash remembered 150 years on
[67] Warnings of snow, wind and rain across the UK for New Year
[45] Oxford station - facilities, improvements, parking, incidents ...
[34] Senior Railcard - ongoing issues, merged posts
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 85 86 [87] 88 89 ... 112
  Print  
Author Topic: Cotswold Line redoubling: 2008 - 2011  (Read 706868 times)
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #1290 on: June 24, 2011, 15:58:19 »

I suppose removal of the wall of the disused platform at Honeybourne is for similar reasons to Axminster, ie it didn't allow adequate clearance beneath the coping slabs for current gauging standards.

I'm referring to the original wall that was removed at Axminster, not the newly built wall that was put up in the wrong place that also had to be demolished...  Roll Eyes

Paul
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #1291 on: June 27, 2011, 01:00:41 »

Various AWS (Automatic Warning System) magnets, TPWS (Train Protection and Warning System) grids, gravel paths and bases for signal posts are now appearing in the various locations where new signals are going to be placed for phase two.

I'm a bit surprised that if the platform is being completely rebuilt at Honeybourne, why a Charlbury-esque platform length isn't deemed enough
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13028


View Profile Email
« Reply #1292 on: June 27, 2011, 07:59:00 »

Something ti do with reversing freight for the bramch, or making passive provision for the steam trains if & when they reach Honeybourne (more likely)
Logged
IanL
Hero Member
*****
Posts: 348


View Profile
« Reply #1293 on: June 27, 2011, 10:23:42 »

Footbridge steps to platform 2 at Charlbury now available for use, those to platform 1 seem to be having some modifications made and are still not available for use.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1294 on: June 27, 2011, 18:35:42 »

I'm a bit surprised that if the platform is being completely rebuilt at Honeybourne, why a Charlbury-esque platform length isn't deemed enough
The old platform structure has been neglected for how many years? in that time it has had no maintenance or inspections so it is difficult to assess the condition of it and therefore budget for any remedial work before contractors are appointed to carry the construction work; so it is more often than not better to state "clear and remove old redundant structure and design and build new to the following standards" in a Workscope than have a vague if its ok make use of it.
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #1295 on: June 28, 2011, 00:03:41 »

Something ti do with reversing freight for the bramch, or making passive provision for the steam trains if & when they reach Honeybourne (more likely)

Can't think for the life of me how the length of the platform would affect freight movements, and as for the passive permission of trains on the GWR (Great Western Railway), I suppose that might be part of it - they run up to 7 carriage trains by the look of it.  Though I think the potential money saved with having a 5-car platform at Honeybourne could be put to much better use by extending Shipton's Up Platform, rather than squandering it to make passive (or in this case, active) provision for a non-National Rail link that may eventually reach Honeybourne many years in the future.  Not to mention the saving in delay minutes whilst TM(resolve)'s have to ensure all those doors on a HST (High Speed Train) are shut - so unnecessary at such a small station.

I noticed today that all the redundant, or soon to be redundant lineside equipment/cabinets in the Evesham/Honeybourne areas have been marked with a green 'X'.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1296 on: June 28, 2011, 08:58:10 »

Not quite sure where this is going. The rebuilt platform at Honeybourne is going to be the same length as the new one at Charlbury, ie able to take five 23m coaches, and I think passive provision is just that. There's not going to be a shiny new bit of platform there at the back ready for the GWSR to use in x years' time, just that room for it to happen and for a track for them to use will be allowed for.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #1297 on: June 28, 2011, 11:07:18 »

Ah, right. OK.  I'd missed/forgotten the post(s) about the 135m length and still thought they were intending to do the whole 152m of the original platform which has now been removed.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
paul7575
Transport Scholar
Hero Member
******
Posts: 5335


View Profile
« Reply #1298 on: June 28, 2011, 11:10:41 »

I reckon all they mean by passive provision for such and such a longer platform length is that they don't position anything permanent in the way of the future footprint, such as track, cable troughs, signal gantries etc etc.  It isn't likely to mean much in terms of building work...

Paul

  
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1299 on: June 29, 2011, 00:40:02 »

Resleepering work on the refuge siding at Moreton-in-Marsh looks to be complete - some of the old ones removed just seem to have crumbled once dug out. Some wiring work also seems to be taking place on the semaphore signals, which I take is to do with fitting of LEDs in place of the existing lamps.
Logged
JayMac
Data Manager
Hero Member
******
Posts: 19245



View Profile
« Reply #1300 on: June 29, 2011, 01:24:08 »

Resleepering? I like it. That's my word for the day.  Tongue Wink Grin
Logged

"A clear conscience laughs at a false accusation."
"Treat everyone the same until you find out they're an idiot."
"Moral indignation is a technique used to endow the idiot with dignity."
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1301 on: June 29, 2011, 07:37:33 »

The "passive provision for the GWR (Great Western Railway)" will be limited to NR» (Network Rail - home page) ensuring where best they can that the potential of a platform and trackbed are not compromised, the GWR will have to build the platform face etc.

In my opinion it is NR's long term interest to have heritage railways,  at national network stations, even if not directly connected to the national network, as it dose have the potential to generate more passengers on national network trains



Resleepering? I like it. That's my word for the day.  Tongue Wink Grin

Resleepering .................. have you never done that?Huh  It's usually done by most people at the weekends!!!! ...................... You know when you roll over and have an extended lay in    Grin Grin Grin
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ChrisB
Transport Scholar
Hero Member
******
Posts: 13028


View Profile Email
« Reply #1302 on: June 29, 2011, 10:42:58 »

The "passive provision for the GWR (Great Western Railway)" will be limited to NR» (Network Rail - home page) ensuring where best they can that the potential of a platform and trackbed are not compromised, the GWR will have to build the platform face etc.

Will NR allow them to do this - or will they insist that GWR just place the contract with NR to do it?
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #1303 on: June 29, 2011, 11:29:36 »

The "passive provision for the GWR (Great Western Railway)" will be limited to NR» (Network Rail - home page) ensuring where best they can that the potential of a platform and trackbed are not compromised, the GWR will have to build the platform face etc.

Will NR allow them to do this - or will they insist that GWR just place the contract with NR to do it?
I would think this will be subject to a formal agreement after negotiations which will take place when or if the GWR are in a position to extend from Broadway to Honeybourne to operate over NR land also I am not sure who owns the land north of Broadway I think the GWR Own some of it but not all
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1304 on: June 30, 2011, 01:29:42 »

Few more pictures now online showing some finishing touches at Charlbury station and work at Honeybourne, where the platform's new front wall is starting to take shape. Most of the old platform wall's bricks were recovered and donated to the Gloucestershire Warwickshire Railway for use at Broadway station and the water column pipework I photographed last week is also GWR (Great Western Railway)-bound, along with a Great Western Railway lamp hut from Ascott-under-Wychwood that has found a new home at Broadway. See the Broadway station construction team's blog here http://broadwaygwsr.blogspot.com/2011/06/piece-of-honeybourne-comes-to-broadway.html 
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 85 86 [87] 88 89 ... 112
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page