Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 22:15 08 Jan 2025
 
- Mother 'not surprised' son killed on London bus
- Ryanair sues 'unruly' passenger over flight diversion
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
21:37 Looe to Liskeard
21:39 Paignton to Exmouth
21:53 London Paddington to Worcester Shrub Hill
22:51 London Paddington to Worcestershire Parkway
23:20 Exmouth to Exeter St Davids
09/01/25 05:57 Liskeard to Looe
09/01/25 06:30 Looe to Liskeard
09/01/25 07:20 Liskeard to Looe
09/01/25 07:54 Looe to Liskeard
09/01/25 08:30 Liskeard to Looe
09/01/25 09:05 Looe to Liskeard
09/01/25 09:36 Liskeard to Looe
09/01/25 10:08 Looe to Liskeard
09/01/25 10:36 Liskeard to Looe
09/01/25 11:06 Looe to Liskeard
09/01/25 11:36 Liskeard to Looe
09/01/25 12:08 Looe to Liskeard
Short Run
20:52 London Paddington to Great Malvern
Delayed
18:00 Cardiff Central to Penzance
19:04 London Paddington to Plymouth
21:28 Weymouth to Frome
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 22:15:58 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[189] 'Railway 200' events and commemorations 2025
[101] Oxford station - facilities, improvements, parking, incidents ...
[64] Views sought : how train companies give assistance to disabled...
[49] Bristol Rail Campaign AGM 2025
[42] senior railcard
[40] Coastal walks - station to station
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 81 82 [83] 84 85 ... 112
  Print  
Author Topic: Cotswold Line redoubling: 2008 - 2011  (Read 707674 times)
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1230 on: May 31, 2011, 23:40:18 »

Slightly more modest photo update tonight, though lots of work still going on out there. At Charlbury plenty of manpower in the area of the new point this evening, while a tamper was working on the new down line just north of the road bridge. At the station fencing is being fitted along the back of the new platform and lamp-posts are going back in.

Few track workers also out at Shorthampton, where the new access point steps are in place, and lots of activity at Ascott-under-Wychwood, where track on the former single line from the end of the platform (future down line towards Worcester) past the signalbox was being replaced. A long ballast train stood on the newly-laid up line through the station, while there was another ballast train parked up the line towards the Mill Lane bridge.

At Ascott station, work has begun on the few extra metres of platform needed for Worcester-bound three-coach Turbo trains to call, pretty much the length of the now-removed ramp is all that is required, essentially so that the cab doors will open on to the platform at both ends.

A couple of pictures of the first train through Charlbury station on the down line, taken by David Northey of Network Rail, are now in the gallery here http://www.oxfordmail.co.uk/pictures/oxfordshire_galleries/cotswoldline2009/ with a few of my pictures, on the last page of thumbnails.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10362


View Profile
« Reply #1231 on: June 01, 2011, 22:03:03 »

Apparently* the problem with the footbridge was that one section was almost seven feet too small.  Also, the work is currently 15 hours behind the work plan schedule - given the fine weather expected until the end of the weekend, they should probably be able to make that up should there be no more hitches.

* mess room gossip
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1232 on: June 02, 2011, 00:20:48 »

Good bit of gossip but I was told by someone who had a lot to do with the bridge that the problem on the first attempt was that things were all of a rather less dramatic 20mm out when they were trying to line them up correctly.

Still a bit to do on the footbridge. All the ramps are in place on the new platform, with just the steps down from the intermediate landing to fit there. On the car park side the end landing is fitted, along with the remaining posts, looks like two long and one short ramp section to go on, plus a set of steps. The two long sections at least were on site ready for lifting.

On the track side, rail stressing was going on at Shorthampton tonight and the tamper was about to start work there as well. More stressing still needed elsewhere, including Ascott-under-Wychwood, where both tracks are now complete through the station area and connected to the tracks towards Shipton. Walls on the platform extension nearing completion and what look like kerb blocks had been placed along the back of the new platform.

Pictures where you would expect.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10362


View Profile
« Reply #1233 on: June 02, 2011, 09:32:58 »

The way good railwaymen like to gossip, it'll probably have doubled to 14 feet by today!   Wink

I took advantage of a day off to take a look myself yesterday, including dropping by Kingham station.  As I suspected the train service between Kingham and Moreton is virtually deserted - I counted six passengers on four trains mid-afternoon (four of whom were in a family).  At Moreton things were a lot busier, though still plenty of room on the two-car Turbos.

The usual generous provision of buses and staff were visible at Kingham and Moreton, the ones at Kingham a little over-the-top given the practically empty buses and trains arriving once-an-hour or so.  Given the tiny number of people travelling west from Kingham, the extra expense of providing those staff, and the requirement and cost of providing a pilotman every time, perhaps just running all the buses from/to Moreton-In-Marsh would have been an adequate thing to do, and saved some money?
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
ChrisB
Transport Scholar
Hero Member
******
Posts: 13028


View Profile Email
« Reply #1234 on: June 02, 2011, 09:36:10 »

Why was a pilotman necessary?
Logged
Tim
Hero Member
*****
Posts: 2738


View Profile
« Reply #1235 on: June 02, 2011, 10:49:38 »

... pilot men are needed for a bus is to reverse safely.
Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13028


View Profile Email
« Reply #1236 on: June 02, 2011, 10:51:24 »

Why on earth?......

I'm sure bus / coach drivers can reverse their vehicle very well, hell, they are tested on this!

Another example of H&S (Health and Safety) gone bonkers!
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10362


View Profile
« Reply #1237 on: June 02, 2011, 11:03:15 »

Why was a pilotman necessary?

Not for the bus, for the train.  It's required to run wrong line between Kingham and Moreton after terminating in the Up Platform.  50mph maximum speed for wrong direction movements and the trains are not able to cross back to the normal down line until just before Moreton.  Also, the usual down line is open to allow access to/from the worksites by engineering trains.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
IanL
Hero Member
*****
Posts: 348


View Profile
« Reply #1238 on: June 02, 2011, 11:33:57 »

Another section of footbridge ramp on the carpark side going in this morning. The concrete foundations I mentioned in an earlier post turned out to be the termination of the footbridge ramp on the new platform, now marked by stone walls.
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1239 on: June 02, 2011, 13:27:25 »

Quote
The usual generous provision of buses and staff were visible at Kingham and Moreton, the ones at Kingham a little over-the-top given the practically empty buses and trains arriving once-an-hour or so.  Given the tiny number of people travelling west from Kingham, the extra expense of providing those staff, and the requirement and cost of providing a pilotman every time, perhaps just running all the buses from/to Moreton-In-Marsh would have been an adequate thing to do, and saved some money?

Damned if you do, damned if you don't. I have been told of an incident this week at Hanborough where a couple turned up and had a go at the duty bus supervisor from FGW (First Great Western) because there weren't any trains! As in 2009 and during weekend closures last year, the bus operation has been exemplary.

The time slippage was almost all on the track side of things, because the engineering trains and tamper were held up by the delay on Sunday installing the junction point. Signals, station work, etc, is pretty much on schedule.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10362


View Profile
« Reply #1240 on: June 02, 2011, 22:17:02 »

Indeed.  A few delays early evening on the shuttle train service as only 50 minutes is being allowed for taxis to get drivers from Oxford to Kingham, which is proving a little on the tight side come mid-afternoon when the traffic builds up.  Expect the same tomorrow, or even worse, given that it's a Friday.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1241 on: June 03, 2011, 00:48:23 »

Quote
few delays early evening on the shuttle train service as only 50 minutes is being allowed for taxis to get drivers from Oxford to Kingham, which is proving a little on the tight side come mid-afternoon when the traffic builds up.

Which is why everyone uses the trains to get in and out of Oxford...

From assorted stops along the line this evening, appears they are catching up with the track work, with signs of tamping at various places and a welding crew at work at Ascott-under-Wychwood, where a ballast broom was also in action.

The walls of the platform extension are almost done, while a lot of timber shuttering is in place in the area of the access ramp for the new platform. As I was on the far side of the line, couldn't really make out what was for concrete and what might be to shield stonemasons from work on the track. The new permanent signalbox steps are in place but need a concrete bottom step to be added.

At Charlbury, all the footbridge ramp sections are fitted with just two sets of steps to be placed now. Lamp-posts are all planted awaiting lamps, plus a couple of other posts (for CCTV (Closed Circuit Tele Vision) cameras perhaps) which don't look robust enough to support a scrolling departure screen. Railway-watching seems to be the local spectator sport this week, with a lot of people taking a walk or bike ride out to the station to see what's going on most evenings.

Pictures at the usual spot.
Logged
CLPGMS
Sr. Member
****
Posts: 155


View Profile
« Reply #1242 on: June 03, 2011, 10:53:55 »

Tried the bus link yesterday (2nd June) from Charlbury to Moreton-in-Marsh (on way to Worcester).
Outward: Just 2 of us on the bus. The other passenger was only travelling to Kingham.  I had the train to myself as far as Moreton-in-Marsh.  The train from Moreton to Worcester ran on time.
Return: 5 passengers alighted at Kingham, but I was the only one to transfer to the bus, on which several other passengers were waiting. 
The train had been delayed at Evesham, awaiting a late running down service.  Left Evesham 14 minutes late, but only 9 minutes late arrival at Kingham.  The bus arrived on time at Charlbury.
 
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 19084


Justice for Cerys Piper and Theo Griffiths please!


View Profile Email
« Reply #1243 on: June 03, 2011, 18:17:59 »

Thanks for that detailed local information, CLPGMS - and a warm welcome to the Coffee Shop forum!  Smiley
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1244 on: June 03, 2011, 19:43:13 »

Some pictures taken this afternoon online now.

Lots of activity at Ascott-under-Wychwood, with the new level crossing support sections being placed across the line, concrete being poured into shuttering for the access ramp, kerbs and a drainage channel being laid along the back edge, as well as further testing of the level crossing warning lights.

Fitting out of the new platform was in full swing at Charlbury, with fencing and lighting teams at work. The waiting shelter has been put on its base and hardcore was being laid between it and the end of the access ramp and where the steps will go. Topsoil had been spread in the area of the new flowerbed opposite the Brunel building. Some track machinery and staff about, plus a train of empty spoil wagons was sitting at the junction signal awaiting instructions, possibly to remove the dump at the other side of the Cornbury Park bridge where spent ballast excavated on Saturday is still piled up.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 81 82 [83] 84 85 ... 112
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page