Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:55 06 Jan 2025
 
- Taxi driver who stoked Southport riots jailed
- Works on 'road from hell' to end after 23 years
- 'Second chance at life' after UK's first liver transplant for advanced bowel cancer
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 08/01/25 - Steam loco restoration - IRTE
09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
6th Jan (1968)
Hixon Railway accident (link)

Train RunningCancelled
20:37 Looe to Liskeard
20:42 Bedwyn to London Paddington
20:51 Bristol Temple Meads to Bristol Parkway
21:05 Liskeard to Looe
21:37 Looe to Liskeard
Short Run
19:36 Didcot Parkway to London Paddington
19:59 Cheltenham Spa to London Paddington
21:21 Bristol Parkway to Trowbridge
Delayed
19:18 Trowbridge to Cardiff Central
20:22 Reading to Shalford
20:38 Maidenhead to Marlow
21:30 Shalford to Reading
07/01/25 04:50 Fratton to Salisbury
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 06, 2025, 21:00:40 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[97] New Adlestrop Railway Atlas update
[56] Mining in Cornwall
[43] DFT - Where is the South Devon Railway
[41] 2024 - Service update and amendment log, Swindon <-> Westbury...
[39] Bridport branch reopening proposal
[39] Bath to Bridgnorth and back 4/1/25
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 65 66 [67] 68 69 ... 112
  Print  
Author Topic: Cotswold Line redoubling: 2008 - 2011  (Read 706147 times)
Nottage_Halt
Jr. Member
**
Posts: 23


View Profile Email
« Reply #990 on: March 17, 2011, 19:25:28 »

Not sure Bruern would necessarily be a massively useful intermediate block post, as it's only two miles from Ascott and nine from Moreton-in-Marsh, so wouldn't do a great deal to space trains out along the line.

No, not massively useful, but it would be the cheapest option if an intermediate block was required as Bruern is controlled from Ascott Signalbox, so incorporating it into the new panel would be fairly easy.  I don't see any other reason why AWS (Automatic Warning System) magnets would be installed, other than a general safety upgrade?

AWS magnets are provided at signals generally, not just "block" signals.  If a level crossing is blocked and the signals are at danger or caution, the driver needs and deserves just the same amount of assistance with reading and remembering the aspect as for "block" signals
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #991 on: March 18, 2011, 15:20:22 »

Yes, but there's no requirement, or hasn't been, to provide an AWS (Automatic Warning System) magnet at a stop signal if it only displays a red or green aspect.  After all, it's an Advanced Warning System, so a magnet is only essential at the point where an advanced warning is given - in the case of these level crossings, the advance warning is a couple of miles further back down the track by the distant signal.

With most signals displaying red/yellow/green at least these days there is a AWS magnet at the signal, but not at locations such as these level crossings, and several other places where signals can only display red or green.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #992 on: March 18, 2011, 16:26:11 »

AWS (Automatic Warning System) magnets are also placed where there is a speed limit board.  AWS can be placed at a "Home" signal eg Red / Green the advanced warning is the aspect of that signal typically 200 metres in advance of the signal
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #993 on: March 18, 2011, 19:29:41 »

AWS (Automatic Warning System) magnets are also placed where there is a speed limit board.  AWS can be placed at a "Home" signal eg Red / Green the advanced warning is the aspect of that signal typically 200 metres in advance of the signal

AWS is not provided at speed limit boards but at the advance warning board (where provided) and only where the required speed reduction is more than 2/3rds.

On the former BRWR area stop signals where originally not provided with AWS hence the Stop signals at Bruern crossing are not fitted at present.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #994 on: March 18, 2011, 20:22:27 »

Yes, there's loads of locations where magnets aren't provided at stop signals and frankly I'm surprised that it hasn't been a requirement to fit them retrospectively and perhaps that's what is happening at Bruern?  But there's no sign of any of the other metals I regularly ride getting the same treatment - nor the other crossings on the route (one of which has been recently renewed), so given that magnets and signals are now being installed for the new signalling, I postulated that it might be connected to that.  An intermediate section between Ascott and Moreton would be useful, even if Bruern is located rather far from the middle of the section.

Just up the line at Ascott-Under-Wychwood the signal that protects entry to the single line has no AWS (Automatic Warning System) magnet and no TPWS (Train Protection and Warning System) stop sensors (just an overspeed sensor for the 40mph junction).  Given that the warning signal is located before Shipton station and a train can build up quite a head of steam from there to the junction, I'm surprised somebody hasn't highlighted the risk - given how safety concious the railway industry is.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Don
Sr. Member
****
Posts: 128



View Profile
« Reply #995 on: March 19, 2011, 00:08:47 »

Just up the line at Ascott-Under-Wychwood the signal that protects entry to the single line has no AWS (Automatic Warning System) magnet and no TPWS (Train Protection and Warning System) stop sensors (just an overspeed sensor for the 40mph junction).  Given that the warning signal is located before Shipton station and a train can build up quite a head of steam from there to the junction, I'm surprised somebody hasn't highlighted the risk - given how safety concious the railway industry is.

Oh yes there is, AW2 signal at Ascott is fitted with AWS and TPWS. All signals into bi-directional single lines are fitted with TPWS because of the huge risk.

Ascott has two TPWS fitted signals and the other is AW22 signal which is the one just south of Ascott's platform from the Oxford direction.
Logged

Regards,
Don.
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #996 on: March 19, 2011, 10:39:06 »

The AWS (Automatic Warning System) magnet and TPWS (Train Protection and Warning System) grid for AW22 can be seen in this picture I took http://www.flickr.com/photos/willc2009/5354402693/

It looks as though the replacement signal will be a bit closer to the station as a new base is going in between AW22 and the existing platform.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #997 on: March 19, 2011, 14:11:48 »

Oh yes there is, AW2 signal at Ascott is fitted with AWS (Automatic Warning System) and TPWS (Train Protection and Warning System). All signals into bi-directional single lines are fitted with TPWS because of the huge risk.

I need to correct myself - partly!  Sorry, Don, you're partly right, AW2 is fitted with TPWS, however it definitely isn't fitted with an AWS magnet.  A similar situation exists at Hatton in the Up direction where the line from Stratford-Upon-Avon joins the main line - TPWS but no AWS magnet.

The AWS magnet and TPWS grid for AW22 can be seen in this picture I took http://www.flickr.com/photos/willc2009/5354402693/

Yes, it has an AWS magnet because AW22 is capable of showing a yellow aspect.  The same applies for it's repeater signal AW22R.  However the following signal, the semaphore section signal AW20, has neither AWS or TPWS. 

Going back to Bruern there is definitely no AWS or TPWS currently working at AW200 and its 'up' equivalent,  but as I said magnets have appeared at the stop signals in the last couple of weeks (but are not yet energised).

Another interesting location is Bicester Town where BT200, the signal protecting the London Road level crossing from the Oxford direction, also has no AWS magnet and no TPWS.  BT200R a mile or so further back has an AWS magnet, but as the linespeed is only 40mph the driver doesn't need to react to it (other than cancel the warning) as the braking point for the station is some 45 seconds further on - get distracted and he would plough straight through the station, the signal and onto the crossing.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #998 on: March 19, 2011, 15:03:39 »

The caution / danger AWS (Automatic Warning System) magnet does not need to be energised as they are permanent magnets only the clear (or green aspect) are electro magnets, there are some permanent magnets that have dampening coils to suppress caution / danger warnings for reverse direction working, also a plate can be placed over permanent magnets to suppress them when they are not in commission.

As a side note or two, the AWS magnets both permanent and electro used on the former SR(resolve) ie dc third rail are painted green to indicate stronger magnets.  Second point AWS permanent magnets are used in 25kV areas at neutral sections to operate the trains main circuit breaker these are mounted on the sleeper ends and not in the four foot
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #999 on: March 19, 2011, 15:08:59 »

The caution / danger AWS (Automatic Warning System) magnet does not need to be energised

I meant that they are not commissioned for use yet.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1000 on: March 19, 2011, 17:23:56 »

Meanwhile, way out west... another half-mile of sleepers is in place, up to the 100 miles from Paddington mark, with packed ballast all the way down to Honeybourne now. There is now a small ballast dump at the west end of Honeybourne station but it's not clear whether this is for use in the sidings, or to go in alongside the island platform. Pictures at the usual place.

It may be that an update was already in hand but after I contacted an FGW (First Great Western) manager earlier in the week, the website page about the redoubling project has been updated with details of this year's closure dates.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10361


View Profile
« Reply #1001 on: March 19, 2011, 19:24:26 »

Thanks for the pictures.  The Hereford train substituted with a Turbo was because of an engine failure on the original HST (High Speed Train) at Reading on its outward journey.  That limped back to Old Oak Common when it got to Oxford and terminated about 30 mins late, though quick work by Control (aided a bit of luck with the train crew) led to a Turbo being stepped up from Oxford to Hereford and for the return.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1002 on: March 21, 2011, 13:38:10 »

Couple of small excavators were being unloaded at Ascott-under-Wychwood this morning, so looks like a start on the foundations of the new platform may be imminent. At Charlbury, the bricklayers are making good progress with the new wall.

Vegetation cutting is taking at place at Kingham and between Ascott and Charlbury, appears to be in connection with creating good sightlines for signals.

Not redoubling, but work to try to prevent vehicles coming off the road bridge and its approaches at Finstock station has been carried out over the past three weeks, with new fences and crash barriers put in place.
 
« Last Edit: March 21, 2011, 22:41:00 by willc » Logged
shaun healey
Newbie
*
Posts: 7


View Profile
« Reply #1003 on: March 22, 2011, 00:04:25 »

had a wonder up to station, work is taking place at the evesham end of honeybourne platform, and from the bridge i could also see lights by the new rail bridge.
Logged
willc
Hero Member
*****
Posts: 2330


View Profile
« Reply #1004 on: March 22, 2011, 22:44:04 »

Vegetation cutting in full swing along the embankment north of Shipton to improve sighting of the distant signal for the home at Ascott-under-Wychwood.

A safety fence was in place around the area for the new platform at Ascott but digging had yet to start at about 9.45am when my train passed.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 65 66 [67] 68 69 ... 112
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page