Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 05:35 08 Jan 2025
 
- Boy, 14, stabbed to death on London bus
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
05:57 Liskeard to Looe
06:30 Looe to Liskeard
07:20 Liskeard to Looe
07:54 Looe to Liskeard
Short Run
04:32 Reading to Gatwick Airport
04:50 Fratton to Salisbury
05:59 Gatwick Airport to Reading
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 05:44:42 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[192] Coastal walks - station to station
[169] 'Railway 200' events and commemorations 2025
[74] Fatal Oxfordshire train crash remembered 150 years on
[67] Warnings of snow, wind and rain across the UK for New Year
[45] Oxford station - facilities, improvements, parking, incidents ...
[34] Senior Railcard - ongoing issues, merged posts
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2 3
  Print  
Author Topic: Driver to guard buzzer on HSTs  (Read 18221 times)
Zoe
Transport Scholar
Hero Member
******
Posts: 754


View Profile
« on: August 26, 2008, 21:50:54 »

Hi, when I am in coach A I can hear the guard give 2 to the driver for RA and then the driver gives 2 back.  I then hear the guard give another 2 back to the driver.  Why does the guard give another 2 back to the driver?  On all other trains I have been on it's just 2 to the driver and 2 back to the guard.
Logged
devon_metro
Hero Member
*****
Posts: 5175



View Profile
« Reply #1 on: August 26, 2008, 22:00:38 »

FGW (First Great Western) are the only ones to do it for "added safety"
Logged
6 OF 2 redundant adjunct of unimatrix 01
Hero Member
*****
Posts: 2754



View Profile Email
« Reply #2 on: August 26, 2008, 22:08:32 »

yeh its not just hst's, i was on a pacer and they did it too i wasnt sure why but i guess as already stated its just to be safe
Logged
Btline
Hero Member
*****
Posts: 4782



View Profile
« Reply #3 on: August 26, 2008, 22:18:58 »

First Scotrail do this - I was travelling around Scotland last week.

PS: I enjoyed the trip - few un-air-conditioned trains!!! Even the Far North lines have 158s!

Perhaps it is new First policy - I should make a trip on FCC (First Capital Connect) (on the other hand....).
Logged
devon_metro
Hero Member
*****
Posts: 5175



View Profile
« Reply #4 on: August 26, 2008, 22:28:10 »

yeh its not just hst's, i was on a pacer and they did it too i wasnt sure why but i guess as already stated its just to be safe

Only on HSTs (High Speed Train) are there 6 buzzes
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #5 on: August 26, 2008, 22:53:40 »

Could it be on HST (High Speed Train)'s
Guard to Driver 2 buzzes doors closed,

Driver to Guard 2 buzzes confirmation,

Guard to Driver 2 buzzes RA
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
6 OF 2 redundant adjunct of unimatrix 01
Hero Member
*****
Posts: 2754



View Profile Email
« Reply #6 on: August 26, 2008, 23:02:14 »

just watched that footage from the pacer i was incorrect what i thought was the first two buzzes was actually the bus doors on the pacer shutting
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10361


View Profile
« Reply #7 on: August 27, 2008, 00:46:31 »

The extra two buzzes are from the Train Manager to the driver to confirm departure. It only happens on HST (High Speed Train)'s as far as I know (but from the comments on here it may be spreading!) and it's due to the Driver<>Guard communication equipment being old and occasionally giving out spurious buzzer sounds to the driver. Obviously having two sets of 'right-away' buzzes from the TM(resolve) virtually eliminates the chance of the driver receiving 'two' spuriously and departing in error. The equipment and cabling is being renewed on all trains progressively, but I expect the extra 'buzz' will remain in force as it has become common practice now.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 19081


Justice for Cerys Piper and Theo Griffiths please!


View Profile Email
« Reply #8 on: August 27, 2008, 01:42:26 »

... and, just as an aside, I've often noticed that there seems to be a tradition, on local units at Bedminster approaching BTM (Bristol Temple Meads (strictly, it should be BRI)), that the departure signal from the guard is six short buzzes, acknowledged by six short buzzes from the driver.

There doesn't seem to be a reason for it - indeed, I once overheard a regular guard tell a trainee, who asked "Why?" - "We just do!"

 Wink
Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
G.Uard
Hero Member
*****
Posts: 426


"Are we at Yate yet?"


View Profile
« Reply #9 on: August 27, 2008, 06:47:57 »

Giving 6 (one after another),  is the signal to draw forward. This is used, for example at Wos Foregate St on down trains, when dispatch staff give the 'tip' but the conductor can't actually see the starting signal.  (Giving 2 against a red is a no no).  You will also see this practice at stations where there is a signal at red some way off in the distance, for example on the up side at Ashchurch.

Common usage  by ex Wessex unit crews in the Glos/Brizzle areas, but recently, I was in the back cab of a 158 with a  (route refreshing) Train Manager who was surprised by the practice, so perhaps it is a 'Wessex' thing.   I haven't been around long enough to know. Undecided
« Last Edit: August 27, 2008, 06:53:57 by G.Uard » Logged
tramway
Hero Member
*****
Posts: 617



View Profile
« Reply #10 on: August 27, 2008, 09:41:28 »

I understood the 6 was when the starting signal was showing amber and the guard had seen it, as the driver would only be able to pull forward to the next signal which would obviously be red. It quite frequently happens at BTM (Bristol Temple Meads (strictly, it should be BRI)) when it gets a bit busy. I^m not sure if  it^s done at Trowbridge on the Bath side when trains head for Melksham as the start signal at the end of the platform shows amber when Bradford junction is set for Melksham. It would seem a little inconsistent if not as I^m sure I remember 6 being given there when we^ve followed late runners and it is also amber when it shows only the next section clear when set for Bradford.
Logged
IndustryInsider
Data Manager
Hero Member
******
Posts: 10361


View Profile
« Reply #11 on: August 27, 2008, 11:08:06 »

Here's a full set of buzzer/bell codes for those that are interested. Those that have heard 6 might have misheard 3-2-1 or 3-3 as 6 should only be given when a train is departing a platform to draw up to a signal that is red (or possible red that the Guard can't see). The dash means that there is a slight pause between the buzzes.

1           = Stop
1-2        = Close Doors
2           = Ready to depart (Right away)
2-2        = Do not open doors
3           = Set back
3-1        = Lock central door locking
3-2        = Guard giving permission for driver to unlock doors
3-2-1     = Testing doors
3-3        = Guard to contact driver (or vice-versa)
3-3-1     = Release central door locking
4           = Slow down
4-4        = Cab to cab contact for HST (High Speed Train)'s
6           = Draw forward
9           = Police required

the 3-2-1 code is the only one that won't be repeated back by the driver.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4495


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #12 on: August 27, 2008, 12:30:05 »

If I recall correctly on the SE Trains in North Kent the Train Manager give 2 bells to tell the Drive to close the doors the TM(resolve)'s door at this stage has his over ride key operated the drives responds back with 2 bells the TM once satisfied the train is ready to depart removes the over ride the door closes and another 2 bell exchange happens.  This second set of bell does not seem to happen at stations with platform dispatch

Next time I travel out that way, which quite often, I'll pay more attention and turn my MP3 player off
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
vacman
Hero Member
*****
Posts: 2530


View Profile
« Reply #13 on: August 27, 2008, 18:50:45 »

The added buzzes on the HST (High Speed Train)'s are down to an incident a few years back (in Cornwall) where a driver left a station without getting "2 from the guard", the driver left and doors were still open etc, the guard claimed that he never gave 2 and the driver claimed that he had 2 so they insisted that the guard always gives 2 a second time. as for driver operated doors, the guard will give 1-2 to the driver to shut the doors then 2 to go.
Logged
G.Uard
Hero Member
*****
Posts: 426


"Are we at Yate yet?"


View Profile
« Reply #14 on: August 27, 2008, 19:08:57 »

I understood the 6 was when the starting signal was showing amber and the guard had seen it, as the driver would only be able to pull forward to the next signal which would obviously be red. It quite frequently happens at BTM (Bristol Temple Meads (strictly, it should be BRI)) when it gets a bit busy. I^m not sure if  it^s done at Trowbridge on the Bath side when trains head for Melksham as the start signal at the end of the platform shows amber when Bradford junction is set for Melksham. It would seem a little inconsistent if not as I^m sure I remember 6 being given there when we^ve followed late runners and it is also amber when it shows only the next section clear when set for Bradford.

A guard would give 2 for a yellow signal as his train would still have the road.  Giving 2 against a red is not a good career move, hence the practice of 6 when a signal can't be seen clearly or when there is a red signal, not necessarily at the end of the platform, but reasonably close.  Drivers someties give 2 back to the 6 if the signal has cleared in the meantime.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2 3
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page