Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 17:35 02 Apr 2025
 
* Heathrow warned by airlines about power supply days before shutdown
- Dublin's Molly Malone statue to get stewards to stop people touching it
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 15/04/25 - End, Rail Future consultation
15/04/25 - Everything Electric
16/04/25 - Walk from Chetnole
10/05/25 - BRTA Westbury

On this day
2nd Apr (1962)
First Panda Crossing (link)

Train RunningCancelled
20:22 Reading to Shalford
21:30 Shalford to Reading
Delayed
17:00 Cardiff Central to Taunton
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 02, 2025, 17:43:35 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[113] [OTD] 2nd April 1962 - First Panda Crossing
[110] It's not the train that's the problem...
[87] Changes to the Highway Code
[83] [OTD] Senior Railcard launched 1st April 1975
[56] RAF Lancaster bombers - merged posts
[53] On this day. South Australia's triple decker train experiment.
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 6 7 [8]
  Print  
Author Topic: North Cotswold line delays and cancellations - 2025  (Read 21985 times)
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1371



View Profile
« Reply #105 on: Yesterday at 09:53:46 »

..., today there are problems with the overhead wires at Hereford:

 Shocked Shocked Shocked
« Last Edit: Yesterday at 14:45:35 by Oxonhutch » Logged
ChrisB
Transport Scholar
Hero Member
******
Posts: 13268


View Profile Email
« Reply #106 on: Yesterday at 10:13:43 »

Suspect no wires at Hereford - might be those at Stoke Gifford, if that's where the stock originates?
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10439


View Profile
« Reply #107 on: Yesterday at 10:51:47 »

Internal notes suggest it was overnight cabling works which overran.  Perhaps someone in the dead of night misread that as overhead cabling works?

That set stables overnight in the Down Siding at Hereford.  The one that comes up from Stoke Gifford now forms the 07:13 GMV (Great Malvern station)-PAD» (Paddington (London) - next trains).
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2099


View Profile
« Reply #108 on: Yesterday at 12:00:11 »

Internal notes suggest it was overnight cabling works which overran.  Perhaps someone in the dead of night misread that as overhead cabling works?

That set stables overnight in the Down Siding at Hereford.  The one that comes up from Stoke Gifford now forms the 07:13 GMV (Great Malvern station)-PAD» (Paddington (London) - next trains).

That seems more likely!  Smiley
Logged
Witham Bobby
Transport Scholar
Hero Member
******
Posts: 728



View Profile
« Reply #109 on: Yesterday at 14:45:06 »

Quote
13:18 Hereford to London Paddington due 16:24 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:01/04/2025 13:56

Yet another great day for the Hereford service
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2099


View Profile
« Reply #110 on: Yesterday at 15:54:22 »

Quote
13:18 Hereford to London Paddington due 16:24 has been cancelled.
This is due to a fault with the signalling system.
Last Updated:01/04/2025 13:56

Yet another great day for the Hereford service

The outward journey, 1W01 09:52 London Paddington to Hereford (12:46) was on time until Ledbury, but arrived Hereford +27.

The second return trip, 1W02 11:52 London Paddington to Hereford (14:44) was cancelled after Worcester Shrub Hill "due to a fault with lineside cabling (II)".

Quote
15:18 Hereford to London Paddington due 18:29 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:01/04/2025 13:55

Later:
Quote
16:58 London Paddington to Great Malvern due 19:25 will be started from Worcester Shrub Hill.
This is due to a points failure.
Last Updated:01/04/2025 16:12

But even later:
Quote
16:58 London Paddington to Great Malvern due 19:25 has been cancelled.
This is due to a points failure.
Last Updated:01/04/2025 17:36

17:57 London Paddington to Worcester Foregate Street due 20:11 will be cancelled.
This is due to a points failure.
Last Updated:01/04/2025 17:26

19:45 Great Malvern to London Paddington due 22:24 will be started from Worcester Shrub Hill.
It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street.
This is due to a points failure.
Last Updated:01/04/2025 17:38

20:56 Worcester Foregate Street to London Paddington due 23:40 will be cancelled.
This is due to a points failure.
Last Updated:01/04/2025 17:28

The 17:34 Paddington - Hereford is still operating.
« Last Edit: Yesterday at 17:52:18 by Worcester_Passenger » Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 6 7 [8]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page