Sunday February 24
08:58 Great Malvern to London Paddington due 11:29 will be cancelled.
This is due to a fault on this train.
Last Updated:23/02/2025 08:06
Later:
1W02 11:45 London Paddington to Hereford (15:03) : departed +21, benefits from a 15-minute stand at Great Malvern, arrived +6.
1W03 12:45 London Paddington to Hereford (16:04) : delayed at Didcot, Shrub Hill +15, benefits from a 16-minute stand at Ledbury.
1W49 15:45 London Paddington to Great Malvern (18:15) : departed +12, arrived +26.
1W51 16:45 London Paddington to Great Malvern (19:15) : departed +20, arrived Shrub Hill +37 and cancelled therafter "due to an issue with the train crew" (
RTT» ).
1W59 17:45 London Paddington to Great Malvern (20:14) : delayed before Reading (+27), delayed at Shrub Hill (+34), arrived +36.
1W73 19:45 London Paddington to Great Malvern (22:16) : departed +25, held Wolvercote (+42), arrived Worcester Shrub Hill +44 and cancelled thereafter "due to the planned train being replaced with a slower train (MS)" (RTT).
1W79 21:45 London Paddington to Worcester Shrub Hill (23:59) : departed +24, arrived +14
1P59 13:58 Great Malvern to London Paddington (16:30) : held Norton (?), arrived +21. Forms 1W51.
1P73 16:59 Great Malvern to London Paddington (19:30) : held Henwick (+11) and Charlbury (+24), arrived +34.
1P81 18:58 Great Malvern to London Paddington (21:30) : held Shrub Hill (+29), arrived +34.
1P85 19:58 Great Malvern to London Paddington (22:29) : started from Worcester Shrub Hill (+14), arrived +20.