And the following service, the 1552 London Paddington to Worcester Shrub Hill train departed Paddington 28 minutes late and left Oxford 38 late.
Given that the 15:52 left Oxford at 17:23, the scheduled departure time of the 'halts' train, did the 15:52 get given the job of doing the halts calls (instead of the 16:58)? Can't really tell from the
RTT» reports.
[Later] Looking in more detail at RTT, the 15:52 took 28 minutes from Hanborough to Moreton (scheduled for 24). The 16:58 took 37 (scheduled for 27). So I think the 16:58 did the halts calls.
Meanwhile, we have the right size of train doing the 'halts' today.