165 111 worked 19:30 to Windsor and return now parked in platform 1 Slough (22:15) shut down with lights off. Out of fuel or failed? GWR▸ website gives.
From RTT» : the last run was into Slough at 2045. Later runs today are flagged: "This service was cancelled throughout due to a problem with the on-board safety systems (M0)."
|
|
|
Logged
|
|
|
|
eightf48544
|
|
« Reply #226 on: August 24, 2019, 15:04:59 » |
|
Didn't see 20:45 arrival must have failed at the end of that journey, as it was already parked up at tea break @22.50 in the Manor. We (SWRS» ) had been discussing some very early pictures of Slough Station in Broad Gauge days. C1870/80s.
Send me a message if you'd like copies.
|
|
|
Logged
|
|
|
|
a-driver
|
|
« Reply #227 on: August 24, 2019, 18:17:16 » |
|
165 111 worked 19:30 to Windsor and return now parked in platform 1 Slough (22:15) shut down with lights off. Out of fuel or failed? GWR▸ website gives.
From RTT» : the last run was into Slough at 2045. Later runs today are flagged: "This service was cancelled throughout due to a problem with the on-board safety systems (M0)." Defective light in the speedo.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #228 on: August 26, 2019, 17:38:50 » |
|
Cancellations to services between London Paddington and Slough Due to a fault with the signalling system between London Paddington and Slough trains have to run at reduced speed on the Reading bound high speed line. Train services running to and from these stations may be cancelled, delayed or revised. Disruption is expected until 19:00 26/08.
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #229 on: August 28, 2019, 04:09:27 » |
|
Cancellations to services at Didcot Parkway
Due to damage to the overhead electric wires at Didcot Parkway some lines are blocked.
Train services running through this station may be cancelled, delayed by up to 20 minutes or revised. Disruption is expected until 11:00 28/08.
Customer Advice
Due to damage to overhead wires yesterday evening, trains between Reading and Oxford cannot call at Didcot Parkway in both directions. Customers between Oxford and Appleford travelling to Didcot Parkway are advised to travel to Reading, change and travel back.
Replacement road transport has been requested to operate where services are cancelled. Further details of this will be advertised when the road transport has been sourced.
CrossCountry are conveying passengers via any reasonable route until further notice.
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
bobm
|
|
« Reply #230 on: August 28, 2019, 07:54:53 » |
|
Platforms 3, 4 and 5 closed at Didcot Parkway after a train's pantograph got tangled in the overhead late last night.
|
|
|
Logged
|
|
|
|
martyjon
|
|
« Reply #231 on: August 28, 2019, 08:10:15 » |
|
Platforms 3, 4 and 5 closed at Didcot Parkway after a train's pantograph got tangled in the overhead late last night.
Surprised no additional stops, when I looked, being added to services from Bristol, South Wales and Cheltenham as a result of above but I suppose 387's stabled at Swindon can be re-routed using main lines for this am's traffic to the smoke or is that too simplistic for Swindon Control to implement.
|
|
|
Logged
|
|
|
|
ray951
|
|
« Reply #232 on: August 28, 2019, 08:37:19 » |
|
Cancellations to services at Didcot Parkway
Due to damage to the overhead electric wires at Didcot Parkway some lines are blocked.
Train services running through this station may be cancelled, delayed by up to 20 minutes or revised. Disruption is expected until 11:00 28/08.
Customer Advice
Due to damage to overhead wires yesterday evening, trains between Reading and Oxford cannot call at Didcot Parkway in both directions. Customers between Oxford and Appleford travelling to Didcot Parkway are advised to travel to Reading, change and travel back.
Replacement road transport has been requested to operate where services are cancelled. Further details of this will be advertised when the road transport has been sourced.
CrossCountry are conveying passengers via any reasonable route until further notice. Services now reported by National Rail to be disrupted until 16:00. If you have to catch a bus into/out of Oxford it could take a while as there are roadworks on the Botley Road.
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #233 on: August 28, 2019, 09:32:03 » |
|
Probably quicker to go via Reading?
Platform 5 has no wires....
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #234 on: August 28, 2019, 10:43:26 » |
|
Platform 5 has no wires....
Yes it does. The area that doesn't have any wires, or more properly, where the Over-Head Line Equipment (OHLE) finishes, is part way along the Chester lines just west of the station. Which is where the problem was as a pan was raised slightly too early on the 22:01 Oxford to Paddington last night. Edit: VickiS - Clarifying Acronym
|
|
« Last Edit: April 14, 2021, 16:12:54 by VickiS »
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
ray951
|
|
« Reply #235 on: August 28, 2019, 11:09:00 » |
|
Platform 5 has no wires....
Yes it does. The area that doesn't have any wires, or more properly, where the OHLE finishes, is part way along the Chester lines just west of the station. Which is where the problem was as a pan was raised slightly too early on the 22:01 Oxford to Paddington last night. Is that an understatement as I thought they weren't supposed to raise the pantograph until they have stopped in the station? Similiar to the procedure for London bound trains that stop on Platform 2.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #236 on: August 28, 2019, 11:16:03 » |
|
That's correct. Although you can raise the pan anywhere at 20mph or less. Anywhere the wires have been installed that is, which is where the problem probably was!
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
TaplowGreen
|
|
« Reply #237 on: August 28, 2019, 12:36:06 » |
|
Disruption now expected "until the end of the day" due to this incident.
|
|
|
Logged
|
|
|
|
a-driver
|
|
« Reply #238 on: August 28, 2019, 13:21:24 » |
|
Platform 5 has no wires....
Yes it does. The area that doesn't have any wires, or more properly, where the OHLE finishes, is part way along the Chester lines just west of the station. Which is where the problem was as a pan was raised slightly too early on the 22:01 Oxford to Paddington last night. Saw the picture on another group somewhere and did wonder if that was the case. That's going to take some explaining.
|
|
|
Logged
|
|
|
|
didcotdean
|
|
« Reply #239 on: August 28, 2019, 17:23:32 » |
|
Platforms 3, 4 and 5 closed at Didcot Parkway after a train's pantograph got tangled in the overhead late last night.
Surprised no additional stops, when I looked, being added to services from Bristol, South Wales and Cheltenham as a result of above but I suppose 387's stabled at Swindon can be re-routed using main lines for this am's traffic to the smoke or is that too simplistic for Swindon Control to implement. They have been some additional stops inserted into some evening services to Bristol TM‡: 16:30, 17:00, 17:30 (? - included in some info and not others) & 18:00 at Tilehurst, Goring & St, and Cholsey.
|
|
|