Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 20:55 08 Jan 2025
 
- Mother 'not surprised' son killed on London bus
- Ryanair sues 'unruly' passenger that diverted flight
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Steam loco restoration - IRTE
tomorrow - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end

On this day
8th Jan (1991)
Cannon Street buffer stop collision (link)

Train RunningCancelled
20:37 Looe to Liskeard
21:05 Liskeard to Looe
21:37 Looe to Liskeard
21:39 Paignton to Exmouth
21:53 London Paddington to Worcester Shrub Hill
22:51 London Paddington to Worcestershire Parkway
23:20 Exmouth to Exeter St Davids
09/01/25 05:57 Liskeard to Looe
09/01/25 06:30 Looe to Liskeard
09/01/25 07:20 Liskeard to Looe
09/01/25 07:54 Looe to Liskeard
09/01/25 08:30 Liskeard to Looe
09/01/25 09:05 Looe to Liskeard
09/01/25 09:36 Liskeard to Looe
09/01/25 10:08 Looe to Liskeard
09/01/25 10:36 Liskeard to Looe
09/01/25 11:06 Looe to Liskeard
09/01/25 11:36 Liskeard to Looe
09/01/25 12:08 Looe to Liskeard
Short Run
19:56 Exmouth to Paignton
20:52 London Paddington to Great Malvern
Delayed
18:00 Cardiff Central to Penzance
19:04 London Paddington to Plymouth
20:22 Reading to Shalford
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 08, 2025, 21:14:21 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[201] 'Railway 200' events and commemorations 2025
[107] Oxford station - facilities, improvements, parking, incidents ...
[68] Views sought : how train companies give assistance to disabled...
[53] Bristol Rail Campaign AGM 2025
[44] senior railcard
[43] Coastal walks - station to station
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 48 49 [50] 51 52 53
  Print  
Author Topic: Thames Valley infrastructure problems causing disruption elsewhere - 2018  (Read 13410 times)
IndustryInsider
Data Manager
Hero Member
******
Posts: 10362


View Profile
« Reply #735 on: November 27, 2018, 19:22:15 »

The root cause was driver error, but of course there are likely to be mitigating factors, such as familiarity with that signalling move, training, the weather, the location of the signals and method of signalling, the amount of rest the driver had before starting work, how long they’d driven before the incident, the last time they’d had something to eat and so on and so on.  The driver would also have been screened for alcohol and drugs. 

The SPAD (Signal Passed At Danger) review will be both thorough and fair and if any lessons are to be learned they will be.  The RAIB (Rail Accident Investigation Branch) will also determine what, if any, involvement they will have.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
Electric train
Transport Scholar
Hero Member
******
Posts: 4496


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #736 on: November 27, 2018, 22:44:07 »

The root cause was driver error, but of course there are likely to be mitigating factors, such as familiarity with that signalling move, training, the weather, the location of the signals and method of signalling, the amount of rest the driver had before starting work, how long they’d driven before the incident, the last time they’d had something to eat and so on and so on.  The driver would also have been screened for alcohol and drugs. 

The SPAD (Signal Passed At Danger) review will be both thorough and fair and if any lessons are to be learned they will be.  The RAIB (Rail Accident Investigation Branch) will also determine what, if any, involvement they will have.

Totally agree, i know how through these type of investigations are, the railway industry is constantly holding investigations into what some would say are minor events, although this is not minor but its not major either.


If anyone is concerned about how safe the railways are then compare the railways with this sad event - https://leamingtonobserver.co.uk/news/bus-driver-who-killed-two-people-in-sainsburys-crash-spared-jail-and-midland-red-fined-2-3m-10141/
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
a-driver
Hero Member
*****
Posts: 1105


View Profile
« Reply #737 on: November 28, 2018, 07:03:57 »

The root cause was driver error, but of course there are likely to be mitigating factors, such as familiarity with that signalling move, training, the weather, the location of the signals and method of signalling, the amount of rest the driver had before starting work, how long they’d driven before the incident, the last time they’d had something to eat and so on and so on.  The driver would also have been screened for alcohol and drugs. 

The SPAD (Signal Passed At Danger) review will be both thorough and fair and if any lessons are to be learned they will be.  The RAIB (Rail Accident Investigation Branch) will also determine what, if any, involvement they will have.

Totally agree, i know how through these type of investigations are, the railway industry is constantly holding investigations into what some would say are minor events, although this is not minor but its not major either.


If anyone is concerned about how safe the railways are then compare the railways with this sad event - https://leamingtonobserver.co.uk/news/bus-driver-who-killed-two-people-in-sainsburys-crash-spared-jail-and-midland-red-fined-2-3m-10141/

All SPAD data is publicly available with a list of all SPAD's on the UK (United Kingdom) railway network since January 1985.  Nationally, this year, there has been about 260 Cat A SPADs. A Cat A's is generally down to driver error, low rail adhesion etc.  Of those 260 around 3 were deemed potentially severe in that it could have caused a collision.  The one at West Ealing yesterday would be deemed 'low risk'.  It was low speed in a siding, the train was derailed on a trap sending the train away from the mainline as it is designed to do.  Most SPAD's will go unnoticed by the travelling public, and that's not because they are covered up, nothing is covered up unlike they were in BR (British Rail(ways)) days.  Everything today is logged, the signalling equipment can be downloaded, there's CCTV (Closed Circuit Tele Vision) and there's on train data recorders.  Most will go unnoticed because on a mainline a safety system will apply the trains brakes and bring the train to a stand probably nearly always within the safety overlap of a signal.  If a SPAD occurs then the train will be terminated at the next station and the driver will not be allowed to go any futher.  That will happen if you SPAD by 1cm or 1mile, they are all treated and investigation in the same manner.  If you activate a train safety system because the system thinks you will SPAD. ie. You're approaching a red signal too fast, even if you stops you before the red signal, you will still be investigated and as a driver, you will be grilled.  The outcome can be a formal warning, complete retraining, attending human factors courses, counselling right through to being sacked.   
What caused most of the disruption at West Ealing was a signalling cable was cut by the derailed train and, in order to rerail it, they needed to isolate the overheard power lines.  If the train hadn't been derailed there would have been no disruption as a result of it. 
260 Cat A sounds a lot, obviously you aim for 0 but drivers are human, they will make mistakes.  When you look at how many trains are operated nationally, both freight and passenger, 260 is a tiny percentage.  And, as with any incident on the railway, lessons are learnt and if procedures can be changed to prevent it happening again, they will.  Fatigue is one of the main things they look at.  Companies use a fatigue index calculator when it comes to rostering but if you work a lot of overtime you can easily breach it and you will get told so along with a polite suggestion to say you might want to think about taking your next rest days off.
Ultimately, we are all human, we will make mistakes and it only takes a loss of concentration for a few seconds, distracted by something out of course and you've got a possible incident... the Swiss cheese model.  This is why we have safety systems as a backup, rarely needed, but they are there and, we've extensive and regular assessments, that's why we operate the safest railway system in the world. 
Logged
Lee
Transport Scholar
Hero Member
******
Posts: 7519


GBR - The Emperor's New Rail Network


View Profile WWW
« Reply #738 on: November 28, 2018, 08:30:48 »

Thanks for that, a-driver - It's really useful to have all of that information clearly explained in one place.
Logged

Vous devez être impitoyable, parce que ces gens sont des salauds - https://looka.com/s/78722877
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 753


View Profile
« Reply #739 on: November 28, 2018, 14:23:21 »

Agree with all a-driver says.  However, one lesson that has not been learnt from previous incidents - going back years - is not to put S&T (Signalling and Telegraph) cabinets, cables, electrification masts etc behind buffer stops and in the line of trap points.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4496


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #740 on: November 28, 2018, 16:08:04 »

Agree with all a-driver says.  However, one lesson that has not been learnt from previous incidents - going back years - is not to put S&T (Signalling and Telegraph) cabinets, cables, electrification masts etc behind buffer stops and in the line of trap points.

Easy to say, easy to ask for not always easy to achieve given the available real estate to place such items.

There will always inevitably be some signalling, electrification assets in such areas, isolating the OLE (Overhead Line Equipment, more often "OHLE") is one thing that cannot be avoided and whilst section insulators and insulated overlaps are place to separate sidings and diverging lines there are again places where ideal placement cannot be achieved.


Having worked on many HazId / HazOp panels the consequences against likelihood often produce a low risk; once in 25 years does not warrant a expenditure to avoid the risk
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Gordon the Blue Engine
Transport Scholar
Hero Member
******
Posts: 753


View Profile
« Reply #741 on: November 28, 2018, 16:47:33 »

Yes, clearly the high cost of putting in trap points is justified by mitigating the potential consequences of a SPAD (Signal Passed At Danger).  However, it may be that only a modest cost is involved in, say, moving the cable troughs a few metres.   And at Padd was there really no other option than to locate the trap points and OHLE mast (I don't know which was there first) such that the low speed SPAD in P1A by the ECS (Empty Coaching Stock) Turbo a couple of years ago brought down half the wires and caused huge disruption?

With new installations/schemes there may be no or minimal costs involved in keeping S&T (Signalling and Telegraph) and OHLE clear of trap points.
Logged
Dispatch Box
Hero Member
*****
Posts: 433


View Profile
« Reply #742 on: November 28, 2018, 17:42:13 »

Agree with all a-driver says.  However, one lesson that has not been learnt from previous incidents - going back years - is not to put S&T (Signalling and Telegraph) cabinets, cables, electrification masts etc behind buffer stops and in the line of trap points.

That is true, They did just that in the 1960,s When Reading Panel was built, Some where by Goring they built a relay room at the end of a siding. In 1975 a light engine was signalled onto it, only that the driver thought he was on the relief line, only to smash through the stop block and into the relay room, It caused mayhem to a section of automatic signalling and my father was called to work at 4.20 in the morning to attend, When the signalman had a section of his panel suddenly turn all red. The section was hand signalled for about 4 weeks to allow for the room to be rebuilt.
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4496


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #743 on: November 28, 2018, 18:22:24 »

Yes, clearly the high cost of putting in trap points is justified by mitigating the potential consequences of a SPAD (Signal Passed At Danger).  However, it may be that only a modest cost is involved in, say, moving the cable troughs a few metres.   And at Padd was there really no other option than to locate the trap points and OHLE mast (I don't know which was there first) such that the low speed SPAD in P1A by the ECS (Empty Coaching Stock) Turbo a couple of years ago brought down half the wires and caused huge disruption?

With new installations/schemes there may be no or minimal costs involved in keeping S&T (Signalling and Telegraph) and OHLE clear of trap points.


Not always that simple, the moving of it may but it closer to an open main running line and putting staff at risk when maintaining it or mean blocking the line to maintain it
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #744 on: November 30, 2018, 17:29:50 »

Due to damage to the overhead electric wires between West Drayton and Slough trains have to run at reduced speed on some lines towards Slough.
Impact:
Train services running through these stations may be delayed by up to 15 minutes. Disruption is expected until 18:15 30/11.
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #745 on: November 30, 2018, 17:53:49 »

It seems the down main is closed in the affected section. I'm crawling along the relief on 1W02, at least since the Ealing area to Slough.
Logged
grahame
Administrator
Hero Member
*****
Posts: 43062



View Profile WWW Email
« Reply #746 on: November 30, 2018, 18:31:36 »

It seems the down main is closed in the affected section. I'm crawling along the relief on 1W02, at least since the Ealing area to Slough.

Yeah ... on 1B69.  17:45 off Paddington then crawl and wrong line.  Currently 12 minutes late and with a 5 minute 'connection' at Swindon for Melksham - arrive 18:43 leave 18:48.    Me thinks I may be stuck there until after 8 O'Clock ...
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
IndustryInsider
Data Manager
Hero Member
******
Posts: 10362


View Profile
« Reply #747 on: November 30, 2018, 18:39:44 »

It seems the down main is closed in the affected section. I'm crawling along the relief on 1W02, at least since the Ealing area to Slough.

Down main was open, but restricted to 20mph for electric trains (linespeed for diesel) unti examination has taken place.  Problem caused by an ADD (Automatic Dropping Device) (Automatic Dropping Device) activation on a Paddington-Swansea train, so might be spurious rather than any actual damage, but obviously needs to be checked and a line block has been taken whilst that is undertaken.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
grahame
Administrator
Hero Member
*****
Posts: 43062



View Profile WWW Email
« Reply #748 on: November 30, 2018, 19:17:50 »

It seems the down main is closed in the affected section. I'm crawling along the relief on 1W02, at least since the Ealing area to Slough.

Yeah ... on 1B69.  17:45 off Paddington then crawl and wrong line.  Currently 12 minutes late and with a 5 minute 'connection' at Swindon for Melksham - arrive 18:43 leave 18:48.    Me thinks I may be stuck there until after 8 O'Clock ...

Yep ... missed by a few minutes ... especially irritating because the 18:48 sits as Westbury for 10 minutes, and is timed for 75 mph stock I believe, but running with 90 m.p.h. stock.   Wouldn't have got in the way of the Bristolian tonight as that's 10 minutes late too ...

If 5 minute connections at Swindon drop like flies ... perhaps it's time to allow longer there for connections.  Or time to make the incoming trains a bit more punctual  Grin
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Surrey 455
Hero Member
*****
Posts: 1269


View Profile
« Reply #749 on: November 30, 2018, 22:31:48 »

It seems the down main is closed in the affected section. I'm crawling along the relief on 1W02, at least since the Ealing area to Slough.

Yeah ... on 1B69.  17:45 off Paddington then crawl and wrong line.  Currently 12 minutes late and with a 5 minute 'connection' at Swindon for Melksham - arrive 18:43 leave 18:48.    Me thinks I may be stuck there until after 8 O'Clock ...

Yep ... missed by a few minutes ... especially irritating because the 18:48 sits as Westbury for 10 minutes, and is timed for 75 mph stock I believe, but running with 90 m.p.h. stock.   Wouldn't have got in the way of the Bristolian tonight as that's 10 minutes late too ...

If 5 minute connections at Swindon drop like flies ... perhaps it's time to allow longer there for connections.  Or time to make the incoming trains a bit more punctual  Grin

Just out of interest, what do you do Graham, when you have a lengthy wait for your next train? Find a pub? Watch a film? Play football with other passengers? something else?
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 48 49 [50] 51 52 53
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page