Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 15:55 09 Jan 2025
 
* Fresh weather warnings for ice across UK
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 today - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
24/01/25 - Bristol Rail Campaign AGM 2025

On this day
9th Jan (2004)
Incorporation of Railway Development Society Ltd (now Railfuture) (link)

Train RunningShort Run
14:32 London Paddington to Cheltenham Spa
15:40 Weymouth to Frome
16:59 Cheltenham Spa to London Paddington
17:18 Frome to Weymouth
Delayed
17:52 Trowbridge to Great Malvern
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 09, 2025, 16:05:56 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[167] 'Railway 200' events and commemorations 2025
[114] Thumpers for Dummies
[96] Railcard Prices going up
[57] Outstanding server / web site issues
[33] Oxford station - facilities, improvements, parking, incidents ...
[21] Views sought : how train companies give assistance to disabled...
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 43 44 [45] 46 47 ... 55
  Print  
Author Topic: Thames Valley infrastructure problems causing disruption elsewhere - 2017  (Read 15499 times)
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #660 on: November 01, 2017, 11:43:39 »

Trains appear to be running on clear signals again (Wednesday 01 November) but all HEATHROW CONNECT services still cancelled.  Perhaps it was too late to reinstate them.....
Logged
TonyK
Global Moderator
Hero Member
*****
Posts: 6594


The artist formerly known as Four Track, Now!


View Profile
« Reply #661 on: November 01, 2017, 12:18:56 »

With luggage?....

Yeah, why not? I've bussed to Heathrow on many occasions with luggage. 12 mins on a 140 after 15 mins on a train is preferable to more than an hour by tube...imo that is!

Been there, done that, no problem.
Logged

Now, please!
charles_uk
Transport Scholar
Hero Member
******
Posts: 778

thewalkingpage
View Profile
« Reply #662 on: November 07, 2017, 10:58:26 »

Cancellations to services between London Paddington and Slough

Due to a fault with the signalling system between London Paddington and Slough some lines are blocked.
Train services running to and from these stations may be cancelled, delayed by up to 25 minutes or revised. Disruption is expected until 13:00 07/11.

Additional Information
Due to signalling problems at Ealing Broadway, Great Western Railway are currently operating a reduced service between London Paddington and Reading. This is affecting local services. Heathrow Connects are currently suspended.

An update will follow within the next 1 hour.
Last Updated:07/11/2017 10:47
Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8450



View Profile
« Reply #663 on: November 11, 2017, 07:52:52 »

Intriguing

Cancellations to services between London Paddington and Ealing Broadway
Due to an operational incident between London Paddington and Ealing Broadway fewer trains are able to run on some lines.
Train services running to and from these stations may be cancelled. Disruption is expected until the end of the day.
Logged
grahame
Administrator
Hero Member
*****
Posts: 43073



View Profile WWW Email
« Reply #664 on: November 11, 2017, 08:11:48 »

Intriguing

Cancellations to services between London Paddington and Ealing Broadway
Due to an operational incident between London Paddington and Ealing Broadway fewer trains are able to run on some lines.
Train services running to and from these stations may be cancelled. Disruption is expected until the end of the day.

Indeed - I'm quoting myself from another thread as really this is the board for discussing this.

Quote
06:17 Heathrow Terminal 5 to Acton Main Line due 06:44
06:17 Heathrow Terminal 5 to Acton Main Line due 06:44 will be terminated at Ealing Broadway.
It will no longer call at Acton Main Line.
This is due to an operational incident.

What IS the operational incident.   I wasn't even aware that passenger trains could terminate at Acton Main Line in the first place!
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
JayMac
Data Manager
Hero Member
******
Posts: 19245



View Profile
« Reply #665 on: November 11, 2017, 08:45:41 »

It's something to do with engineering works in the Acton area.

"T3 Possession Item 8 planning issues - Acton ML"

That's all I can find, which doesn't really say much to the layman, so 'operational incident' it is.
Logged

"A clear conscience laughs at a false accusation."
"Treat everyone the same until you find out they're an idiot."
"Moral indignation is a technique used to endow the idiot with dignity."
stuving
Transport Scholar
Hero Member
******
Posts: 7371


View Profile
« Reply #666 on: November 11, 2017, 10:11:17 »

It's something to do with engineering works in the Acton area.

"T3 Possession Item 8 planning issues - Acton ML"

That's all I can find, which doesn't really say much to the layman, so 'operational incident' it is.

"Planning issues" does sound like they had an operating plan for during a possession, but they found out when they tried it that it wasn't possible. So maybe Graham's reaction ("I wasn't even aware that passenger trains could terminate at Acton Main Line in the first place!") showed a better understanding of the network than NR» (Network Rail - home page)'s and the TOCs (Train Operating Company)'.

The possessions in the EAS for today (there's loads more overnight) apply to lines 4-6 and the Reliefs, and all platforms at PAD» (Paddington (London) - next trains). No doubt the work on the lines is to do with the rejigging for Crossrail IndustryInsider referred to recently. Closing all platforms at PAD makes no sense at all if lines 1-3 are open; I guess the plan was always to release some for operational use closer to the date.

It was only Heathrow Connect (plus the odd Greenford) that were meant to use Acton Main Line as a terminus - their web site now says they are using Ealing Broadway but as an engineering alteration not a disruption.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #667 on: November 11, 2017, 10:36:46 »

This type of message sometimes means that a train has incorrectly moved into or out of the possession limits or those have been placed in the incorrect position relative to the actual possession limits.  Looks from OTT (Open Train Times website) maps (http://www.opentraintimes.com/maps/signalling/d3_1) that trains were scheduled to terminate from the West at Acton Main Line, move forward empty to the Old Oak Common Carriage Line, reverse and then travel back to Acton Main Line to start the service West again.  Possible a set of points was damaged during the incident.

As I type this trains are currently being reversed at Ealing Broadway instead.
« Last Edit: November 11, 2017, 10:50:02 by SandTEngineer » Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7371


View Profile
« Reply #668 on: November 11, 2017, 10:45:51 »

Heathrow Connect (HC) are now saying that next weekend they will also be using Ealing Broadway as a terminus, while RTT» (Real Time Trains - website) still has them using Acton Mail Line. So it does look like a revision of the operational plan. It may be a bit cosy at Ealing, since the Greenfords are also reversing there all day - West Ealing P5 is not being used, for some reason.

Mind you, the following two weekends there will be no HC trains at all. Usual alternative of 140 bus from Hayes offered instead.

PS: the amendment and removal of Heathrow Connect HC trains after tomorrow is on Saturdays only, not the Sundays of those weekends. Which is a little odd, as half the possessions are still here on the Sundays.

Edit: VickiS - Clarifying Acronym
« Last Edit: May 05, 2021, 15:17:39 by VickiS » Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #669 on: November 11, 2017, 10:54:56 »

HC are now saying that next weekend they will also be using Ealing Broadway as a terminus, while RTT» (Real Time Trains - website) still has them using Acton Mail Line. So it does look like a revision of the operational plan. It may be a bit cosy at Ealing, since the Greenfords are also reversing there all day - West Ealing P5 is not being used, for some reason.

Mind you, the following two weekends there will be no HC trains at all. Usual alternative of 140 bus from Hayes offered instead.

Ok then.  Possible that the worksite required fell outside the planned possession limits and that the work cannot be cancelled as its required to be completed before the xmas blockades.  But looking at the OTT (Open Train Times website) map again the possession limit markers *08* are still in the locations I would have expected for trains to terminate at Acton Main Line.
Logged
CJB666
Sr. Member
****
Posts: 210


View Profile
« Reply #670 on: November 12, 2017, 22:45:46 »

HC are now saying that next weekend they will also be using Ealing Broadway as a terminus, while RTT» (Real Time Trains - website) still has them using Acton Mail Line. So it does look like a revision of the operational plan. It may be a bit cosy at Ealing, since the Greenfords are also reversing there all day - West Ealing P5 is not being used, for some reason.

Mind you, the following two weekends there will be no Heathrow Connect (HC) trains at all. Usual alternative of 140 bus from Hayes offered instead.

PS: the amendment and removal of Heathrow Connect (HC) trains after tomorrow is on Saturdays only, not the Sundays of those weekends. Which is a little odd, as half the possessions are still here on the Sundays.

Ever since it started the Heathrow Connect (HC) has always been the poor relation - services cancelled as often as run. So what about the hapless tourist going to LHR with Heathrow Connect (HC) advance tickets? Do they have to purchase HEX tickets too? And if they end up at Hayes, does the 140 always accept HC tickets? The common factor is that whenever there are disruptions to HC &/or HEX services Heathrow staff are never ever visible at Paddington. And Heathrow HEX / Heathrow Connect (HC) Customer Services NEVER ever reply to emails.

Edit: VickiS - Clarifying Acronyms
« Last Edit: May 05, 2021, 15:19:21 by VickiS » Logged
Louis94
Hero Member
*****
Posts: 446


View Profile
« Reply #671 on: November 13, 2017, 16:22:30 »

HC are now saying that next weekend they will also be using Ealing Broadway as a terminus, while RTT» (Real Time Trains - website) still has them using Acton Mail Line. So it does look like a revision of the operational plan. It may be a bit cosy at Ealing, since the Greenfords are also reversing there all day - West Ealing P5 is not being used, for some reason.


Note that RTT does not show a time in the GBTT (Great British Time Table) arrival/departure column, this means that technically those stops are operational and therefore are not advertised on Journey Planners.

If you look on journey planners for services from Ealing Broadway to Acton Main Line the only train to appear is the first Heathrow Connect service from Heathrow (which has a GBTT arrival time). For the other direction it is also just one service, the return working of the service previously mentioned! The same applied for the weekend just gone, not quite sure whether this was intentional or not.
Logged
Jason
Hero Member
*****
Posts: 543


View Profile
« Reply #672 on: November 15, 2017, 08:55:46 »

Following a fault with the signalling system between Slough and London Paddington all lines are now open.
Impact: Train services running to and from these stations are returning to normal but some services may still be delayed by up to 20 minutes or revised. Disruption is expected until 10:30 15/11.
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #673 on: November 15, 2017, 09:40:45 »

This seems very appropriate then.......
http://www.bbc.co.uk/news/av/business-41970331/signal-failure-the-train-traveller-s-nightmare-explained

Blame it all on vandalism...... Roll Eyes Embarrassed
« Last Edit: November 15, 2017, 10:01:43 by SandTEngineer » Logged
TaplowGreen
Transport Scholar
Hero Member
******
Posts: 8450



View Profile
« Reply #674 on: November 27, 2017, 06:03:14 »

Delays to services at London Paddington


Due to an obstruction on the track at London Paddington some lines are closed.
Train services running to and from this station may be delayed. Disruption is expected until 06:45 27/11.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 43 44 [45] 46 47 ... 55
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page