Jason
|
|
« Reply #75 on: May 19, 2016, 08:05:25 » |
|
Signalling problems at Oxford this morning causing knock on delays through Reading into Paddington. The HST▸ stopper I joined at Reading at 0700 was rammed(*) after Maidenhead. (*) Technical term
|
|
|
Logged
|
|
|
|
bobm
|
|
« Reply #76 on: May 19, 2016, 08:07:23 » |
|
The HST▸ stopper I joined at Reading at 0700 was rammed(*) after Maidenhead. (*) Technical term Full & Standing for the non technical
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #77 on: May 19, 2016, 09:35:58 » |
|
Lots of "non stoppers" at Maidenhead this morning, some very unhappy/squashed/late people judging from friends reports and Twitter feed...........for once I was pleased to get on my "slow" all stations train from Taplow!!!
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #78 on: May 19, 2016, 11:16:32 » |
|
Most, if not all, caused by the points failure at Oxford, mentioned by Jason.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
TaplowGreen
|
|
« Reply #79 on: May 29, 2016, 09:56:59 » |
|
Delays to services between Plymouth and Totnes Due to a shortage of train drivers between Plymouth and Totnes some Newton Abbot bound lines are blocked. Train services running through these stations may be delayed by up to 60 mins. .............what on Earth are they doing to block the line? Sleeping on the tracks?
|
|
|
Logged
|
|
|
|
plymothian
|
|
« Reply #80 on: May 29, 2016, 10:16:06 » |
|
Ooh, you'll be in for it Taplow, that's nowhere near LTV▸ land!
Anyhow, an NR» engineering train broken down, the driver is out of hours and there isn't another available for it.
|
|
|
Logged
|
Please be aware that only the first 4 words of this post will be platformed on this message board.
|
|
|
TaplowGreen
|
|
« Reply #81 on: May 29, 2016, 10:35:09 » |
|
Ooh, you'll be in for it Taplow, that's nowhere near LTV▸ land!
Anyhow, an NR» engineering train broken down, the driver is out of hours and there isn't another available for it.
Ouch! Good luck to those trying to get to Twickenham from the Westcountry then..........thankfully I'm travelling via Windsor!
|
|
|
Logged
|
|
|
|
a-driver
|
|
« Reply #82 on: May 29, 2016, 13:09:59 » |
|
Ooh, you'll be in for it Taplow, that's nowhere near LTV▸ land!
Anyhow, an NR» engineering train broken down, the driver is out of hours and there isn't another available for it.
We heard the driver employed by the freight company didn't actually sign the route outside of the engineering worksite so they had to find another driver to go and move the train. Sounds more like a rostering error by the freight company.
|
|
|
Logged
|
|
|
|
eightf48544
|
|
« Reply #83 on: May 29, 2016, 16:26:36 » |
|
Another one of the hazards of splitting up the railways.
How can you have a driver who only signs for a worksite?
|
|
|
Logged
|
|
|
|
broadgage
|
|
« Reply #84 on: May 29, 2016, 17:59:21 » |
|
Another one of the hazards of splitting up the railways. How can you have a driver who only signs for a worksite?
Possibly a driver who does not know the area of the works, but who has been specifically authorised to drive within the work site only. Most, perhaps all of the normal route knowledge, is not relevant within a worksite. Location of signals, often not applicable as they may be out of use for the works, and it is usual to give permission to pass signals at danger due to the works requiring more than one train in a section. Speed limits, often not applicable as the maximum speed permitted in a work site is often much lower than the usual line speed. Stopping places, and braking points to stop correctly at stations, not usually relevant as engineering trains stop as needed for the work. And so on.
|
|
|
Logged
|
A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard. It has space for cycles, surfboards,luggage etc. A 5 car DMU▸ is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
|
|
|
TaplowGreen
|
|
« Reply #85 on: May 30, 2016, 09:07:29 » |
|
Another one of the hazards of splitting up the railways. How can you have a driver who only signs for a worksite?
Possibly a driver who does not know the area of the works, but who has been specifically authorised to drive within the work site only. Most, perhaps all of the normal route knowledge, is not relevant within a worksite. Location of signals, often not applicable as they may be out of use for the works, and it is usual to give permission to pass signals at danger due to the works requiring more than one train in a section. Speed limits, often not applicable as the maximum speed permitted in a work site is often much lower than the usual line speed. Stopping places, and braking points to stop correctly at stations, not usually relevant as engineering trains stop as needed for the work. And so on. .........and the consequences of having no back up plan were many journeys disrupted and days out ruined on one of the busiest days of the year with a number of major events taking place.
|
|
|
Logged
|
|
|
|
eightf48544
|
|
« Reply #86 on: May 30, 2016, 09:55:41 » |
|
What a way to run the railway!
|
|
|
Logged
|
|
|
|
plymothian
|
|
« Reply #87 on: May 30, 2016, 10:08:48 » |
|
And yet again GWR▸ get all the flack for not being prepared and being short of staff to move this train (sic).
|
|
|
Logged
|
Please be aware that only the first 4 words of this post will be platformed on this message board.
|
|
|
TaplowGreen
|
|
« Reply #88 on: June 01, 2016, 09:15:48 » |
|
.............here we go again.......
Cancellations to services between London Paddington and Ealing Broadway
Due to a fault with the signalling system between London Paddington and Ealing Broadway fewer trains are able to run on some lines.
Train services running to and from these stations may be cancelled or delayed by up to 20 mins. Disruption is expected until 11:30 01/06.
|
|
|
Logged
|
|
|
|
plymothian
|
|
« Reply #89 on: June 01, 2016, 19:18:24 » |
|
I think GWR▸ must be chomping at the bit for the Elizabeth Line to take over the reliefs out of Paddington, just so TfL» get the flack instead.
|
|
|
Logged
|
Please be aware that only the first 4 words of this post will be platformed on this message board.
|
|
|
|