Worcester_Passenger
|
|
« Reply #540 on: November 18, 2024, 12:09:02 » |
|
Monday November 18 1W11 0553 London Paddington to Great Malvern was cancelled throughout. 08:56 Great Malvern to London Paddington due 11:24 will be cancelled. This is due to engineering works not being finished on time. Last Updated:18/11/2024 06:17
07:50 London Paddington to Great Malvern due 10:13 will be terminated at Worcester Shrub Hill. It has been delayed at London Paddington and is now 23 minutes late. This is due to earlier engineering works not being finished on time. Last Updated:18/11/2024 09:40 Held Wolvercote and Evesham. Arrived Shrub Hill +57, cancelled thereafter. 10:59 Great Malvern to London Paddington due 13:25 will be started from Worcester Shrub Hill. This is due to earlier engineering works not being finished on time. Last Updated:18/11/2024 09:40
10:53 London Paddington to Worcester Shrub Hill due 13:01 will be terminated at Oxford. It is being delayed at London Paddington. This is due to a broken down train earlier today. Last Updated:18/11/2024 12:03
13:16 Worcester Shrub Hill to London Paddington due 15:22 will be started from Oxford. This is due to a broken down train earlier today. Last Updated:18/11/2024 12:03
Added at 15:26: 1W02 11:52 London Paddington to Hereford departed +15, arrived Great Malvern +20 and was cancelled thereafter. 15:18 Hereford to London Paddington due 18:29 will be started from Great Malvern. This is due to this train being late from the depot. Last Updated:18/11/2024 14:04 Bingo card doing well today - "engineering works not being finished on time", "broken down train earlier today" and "late from depot".
|
|
« Last Edit: November 18, 2024, 19:13:02 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #541 on: November 19, 2024, 08:20:54 » |
|
Tuesday November 19
We have snow in Worcester this morning.
The trains look to be performing OK, except for 1P18 07:13 Great Malvern to London Paddington, which was delayed between Malvern Link and Newland East. It's now beyond Norton but is +38.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #542 on: November 19, 2024, 10:58:44 » |
|
I posted too soon. There are signalling problems between Worcester and Great Malvern. 1W13 06:50 London Paddington to Great Malvern was cancelled between Worcester Shrub Hill and Great Malvern due to a signal failure (IA). 08:56 Great Malvern to London Paddington due 11:24 will be terminated at Worcester Shrub Hill. It has been delayed at Great Malvern and is now 85 minutes late. This is due to a fault with the signalling system. Last Updated:19/11/2024 10:21 The stock is running empty to Paddington. 09:55 Great Malvern to London Paddington due 12:23 will be started from Worcester Shrub Hill. This is due to a fault with the signalling system. Last Updated:19/11/2024 09:01
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #543 on: November 19, 2024, 12:19:17 » |
|
11:57 Great Malvern to London Paddington due 14:23 has been cancelled. This is due to a tree blocking the railway. Last Updated:19/11/2024 12:10
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #544 on: November 19, 2024, 12:41:55 » |
|
10:59 Great Malvern to London Paddington due 13:25 will be started from Worcester Shrub Hill. This is due to a fault with the signalling system. Last Updated:19/11/2024 10:13
13:18 Hereford to London Paddington due 16:25 will be started from Worcester Shrub Hill. This is due to a tree blocking the railway. Last Updated:19/11/2024 11:56
09:52 London Paddington to Hereford due 12:46 will be terminated at Worcester Shrub Hill. This is due to a tree blocking the railway. Last Updated:19/11/2024 11:56
11:52 London Paddington to Hereford due 14:44 is being delayed at Reading. This is due to a fault on a train in front of this one. Last Updated:19/11/2024 12:30
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #545 on: November 19, 2024, 16:28:50 » |
|
14:53 London Paddington to Worcester Foregate Street due 17:04 has been cancelled. This is due to a tree blocking the railway earlier today. Last Updated:19/11/2024 16:22 This service was due to have been started from Oxford due to delays resulting from the tree blocking the railway but, in the event, never got further than platform 3 at Oxford
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #546 on: November 19, 2024, 17:49:46 » |
|
14:53 London Paddington to Worcester Foregate Street due 17:04 has been cancelled. This is due to a tree blocking the railway earlier today. Last Updated:19/11/2024 16:22 This service was due to have been started from Oxford due to delays resulting from the tree blocking the railway but, in the event, never got further than platform 3 at Oxford 17:26 Worcester Foregate Street to London Paddington due 19:52 will be started from Oxford. This is due to a fault on this train. Today's bingo card has "a fault with the signalling system", "a fault on a train in front of this one", "a tree blocking the railway", and "a fault on this train".
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #547 on: November 21, 2024, 07:16:09 » |
|
Wednesday November 20
The 'halts' train, 2E14 17:04 Didcot Parkway to Moreton-in-Marsh, and return, 2E16 18:51 Evesham to Oxford, cancelled "cancelled due to a problem with the traction equipment (MD)", according to RTT» .
1W41 20:52 London Paddington to Great Malvern cancelled throughout "due to an issue with the train crew (TH)".
|
|
« Last Edit: November 21, 2024, 09:08:36 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #548 on: November 22, 2024, 06:54:45 » |
|
And after a good day on Thursday November 21 (no cancellations, one piece of late running)... Friday November 22 2E77 05:10 Oxford to Worcester Shrub Hill (06:15) was cancelled "due to passengers causing a disturbance on this train". Leading to 07:00 Worcester Shrub Hill to Didcot Parkway due 08:46 will be cancelled. This is due to passengers causing a disturbance on a train. Last Updated:22/11/2024 05:48 Meanwhile 05:53 London Paddington to Great Malvern due 08:38 will no longer call at Reading, Hanborough, Kingham, Honeybourne, Pershore and Worcestershire Parkway Hl. It is being delayed at London Paddington. This is due to this train being late from the depot. Last Updated:22/11/2024 06:20 38 late from Paddington. Cutting out the stops got it to Shrub Hill +31, cancelled thereafter. 08:56 Great Malvern to London Paddington due 11:24 will be started from Worcester Shrub Hill. It will no longer call at Great Malvern, Malvern Link and Worcester Foregate Street. This is due to earlier engineering works not being finished on time. Last Updated:22/11/2024 07:55
|
|
« Last Edit: November 22, 2024, 10:47:49 by Worcester_Passenger »
|
Logged
|
|
|
|
Richard Fairhurst
|
|
« Reply #549 on: November 22, 2024, 16:06:23 » |
|
2E77 05:10 Oxford to Worcester Shrub Hill (06:15) was cancelled "due to passengers causing a disturbance on this train".
There are passengers (disturbing ones at that) leaving Oxford for Worcester at 05.10? I'm not entirely sure I believe that.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #550 on: November 22, 2024, 17:12:18 » |
|
2E77 05:10 Oxford to Worcester Shrub Hill (06:15) was cancelled "due to passengers causing a disturbance on this train".
There are passengers (disturbing ones at that) leaving Oxford for Worcester at 05.10? I'm not entirely sure I believe that. Agree completely.
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #551 on: November 23, 2024, 12:33:58 » |
|
Migfht have been on that train on its previous (previous night's?) journey maybe?
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #552 on: November 23, 2024, 16:26:28 » |
|
Saturday November 23 was going well until 1W25 12:53 London Paddington to Worcester Foregate St departed +15, arrived Shrub Hill +19 and didn't make it to Foregate St. 1W27 13:50 London Paddington to Great Malvern ran OK 14:52 London Paddington to Great Malvern due 17:14 will no longer call at Hanborough, Kingham, Honeybourne, Pershore and Worcestershire Parkway Hl. This is due to a fault with the signalling system. Last Updated:23/11/2024 15:14 Departed Paddington +29, arrived (after skipping stations) +18. 1W03 16:51 London Paddington to Hereford departed +13, arrived Great Malvern +46 and was cancelled thereafter. 20:03 Worcester Foregate Street to London Paddington due 22:38 will be started from Worcester Shrub Hill. This is due to train crew being delayed by service disruption. Last Updated:23/11/2024 19:32
20:20 Hereford to London Paddington due 23:37 will be started from Great Malvern. This is due to a shortage of train crew. Last Updated:23/11/2024 19:05
|
|
« Last Edit: November 23, 2024, 21:17:33 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #553 on: November 24, 2024, 09:25:25 » |
|
Sunday November 24 08:15 Worcester Foregate Street to Reading due 10:01 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 03:44
11:58 Great Malvern to London Paddington due 14:31 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 03:00
13:11 Worcester Foregate Street to London Paddington due 15:46 will be started from Oxford. This is due to a shortage of train crew. Last Updated:24/11/2024 03:00
15:31 Hereford to London Paddington due 18:46 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 07:24
18:58 Great Malvern to London Paddington due 21:46 will be started from Oxford. This is due to a shortage of train crew. Last Updated:24/11/2024 03:00
19:58 Great Malvern to London Paddington due 22:32 will be terminated at Reading. This is due to a shortage of train crew. Last Updated:24/11/2024 07:35
20:46 Great Malvern to London Paddington due 23:40 will be terminated at Reading. This is due to a shortage of train crew. Last Updated:24/11/2024 07:32
09:18 Reading to Great Malvern due 11:15 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 03:00
10:13 Reading to Hereford due 12:58 will be started from Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:24/11/2024 07:23
11:36 London Paddington to Hereford due 15:04 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 07:24
12:36 London Paddington to Hereford due 16:04 will be reinstated. It will be started from Worcester Shrub Hill. This is due to a shortage of train crew. Last Updated:24/11/2024 05:01
15:36 London Paddington to Great Malvern due 18:15 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:24/11/2024 03:00
16:36 London Paddington to Great Malvern due 19:15 will be started from Reading. This is due to a shortage of train crew. Last Updated:24/11/2024 05:08
20:36 London Paddington to Worcester Shrub Hill due 23:00 will be cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 07:32
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #554 on: November 24, 2024, 14:52:26 » |
|
Further changes: 13:11 Worcester Foregate Street to London Paddington due 15:46 has been cancelled. This is due to a shortage of train crew. Last Updated:24/11/2024 14:21
14:28 Hereford to London Paddington due 17:31 will be started from Worcester Shrub Hill. This is due to heavy rain flooding the railway. Last Updated:24/11/2024 11:05
17:30 Hereford to London Paddington due 20:46 will be started from Oxford. This is due to heavy rain flooding the railway. Last Updated:24/11/2024 14:19
12:36 London Paddington to Hereford due 16:04 will be terminated at Oxford. It has been delayed at London Paddington and is now 67 minutes late. This is due to heavy rain flooding the railway. Last Updated:24/11/2024 14:19
|
|
|
Logged
|
|
|
|
|