Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 22:35 04 Jan 2025
 
- Tributes to 'much loved and popular' boy after quad bike crash
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 09/01/25 - Bath Railway Society
24/01/25 - Westbury Station reopens
24/01/25 - LTP4 Wilts / Consultation end
28/01/25 - Coffee Shop 18th Birthday

On this day
4th Jan (1954)
Portishead (New) station opened (link)

Train RunningShort Run
19:03 London Paddington to Plymouth
20:03 London Paddington to Plymouth
Delayed
18:03 London Paddington to Penzance
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
January 04, 2025, 22:45:26 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[252] Bridport branch reopening proposal
[94] Mining in Cornwall
[57] Outstanding server / web site issues
[53] Old Oak Common Christmas Work
[51] Rail Replacement bus - OK, but I prefer the train.
[46] Terrible signalling error!
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 41 42 [43] 44
  Print  
Author Topic: North Cotswold Line delays and cancellations - 2024  (Read 89071 times)
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #630 on: December 18, 2024, 15:42:25 »

Wednesday December 18

Quote
Cancellations to services between Oxford and Worcester Foregate Street
Due to a fault with the signalling system between Oxford and Worcester Foregate Street trains have to run at reduced speed on some lines.
Train services running through these stations may be cancelled or delayed by up to 35 minutes. Disruption is expected until the end of the day.
Last Updated:18/12/2024 14:41

Quote
14:53 London Paddington to Worcester Foregate Street due 17:04 will be started from Reading.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 14:28

15:23 London Paddington to Worcester Foregate Street due 17:47 will be cancelled.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 14:31

15:18 Worcester Foregate Street to London Paddington due 17:29 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 14:54

15:18 Hereford to London Paddington due 18:29 will be started from Oxford.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 13:46

18:02 Worcester Foregate Street to London Paddington due 20:29 will be cancelled.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 14:38

RTT» (Real Time Trains - website) is also reporting:
1W02 11:52 London Paddington to Hereford arrived Oxford +26 and was cancelled thereafter.
1W25 12:51 London Paddington to Foregate St (15:00) arrived Worcester Shrub Hill +28 and was cancelled thereafter.

Later:
1W27 13:50 London Paddington to Great Malvern (16:15) arrived Worcester Shrub Hill +26 and was cancelled thereafter.
1W29 14:53 Paddington to Worcester Foregate St (17:04) was indeed started from Reading. It arrived Shrub Hill +38 and never made Foregate St.

Quote
16:32 Great Malvern to London Paddington due 19:29 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 15:37

17:26 Worcester Foregate Street to London Paddington due 19:52 will be started from Worcester Shrub Hill.
This is due to a fault with the signalling system.
Last Updated:18/12/2024 17:10

« Last Edit: December 18, 2024, 18:00:31 by Worcester_Passenger » Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #631 on: December 20, 2024, 17:49:29 »

Thursday December 19 was a good day, with no cancellations or short workings.

Friday December 20 was going well until:
Quote
15:23 London Paddington to Worcester Foregate Street due 17:47 is being delayed between Reading and Didcot Parkway and is now expected to be 17 minutes late.
This is due to a safety inspection of the track.
Last Updated:20/12/2024 16:15

Quote
15:52 London Paddington to Great Malvern due 18:26 is being delayed between Reading and Oxford and is now expected to be 28 minutes late.
This is due to a safety inspection of the track.
Last Updated:20/12/2024 17:02

17:04 Didcot Parkway to Evesham due 18:23 will be terminated at Oxford.
This is due to a safety inspection of the track.
Last Updated:20/12/2024 17:09

16:58 London Paddington to Great Malvern due 19:25 will call additionally at Combe, Finstock, Ascott-Under-Wychwood and Shipton.
This is due to the train making extra stops because a train was cancelled.
Last Updated:20/12/2024 17:15

No mention on JourneyCheck of the return working of the 'halts' train, 2E16 18:51 Evesham to Oxford (19:50).

1P05 1518 Hereford to London Paddington (18:29) was held at Charlbury (+17).
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #632 on: December 20, 2024, 21:39:55 »

Friday December 20

Delays on account of a safety inspection of the track beween Reading and Oxford.

1W30 15:23 London Paddington to Foregate Street (17:47) : Reading +10, Didcot +24, held Evesham (+35), arrived Worcester Shrub Hill +34, didn't make Foregate St.
1W31 15:52 London Paddington to Great Malvern (18:26) : delayed Cholsey (+20), arrived +32.
2E14 17:04 Didcot Parkway to Evesham (18:23) : cancelled after Oxford
1W33 16:58 London Paddington to Great Malvern (19:25) : Oxford +24, held Wovercote (+30), arrived Worcester Shrub Hill +44 and cancelled thereafter.
1W03 17:34 London Paddington to Hereford : departed +13, cancelled after Oxford (+12) "due to an issue with the train crew (TG)" [RTT» (Real Time Trains - website)].
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) : arrived +11

1P05 15:18 Hereford to London Paddington () : held Charlbury (+17), arrived +20.
1P40 18:06 Worcester Foregate St to London Paddington : started from Shrub Hill, held Norton (+20), arrived +1.
2E16 18:51 Evesham to Oxford : cancelled throughout.
1P42 19:04 Great Malvern to London Paddington : departed +21, arrived +17.
1P44 19:45 Great Malvern to London Paddington : started from Shrub Hill.
1P06 22:00 Hereford to London Paddington : cancelled throughout. Stock raan empty from Oxford to Paddington.











« Last Edit: December 21, 2024, 16:17:32 by Worcester_Passenger » Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #633 on: December 21, 2024, 16:31:12 »

Saturday December 21

Quote
14:50 Great Malvern to London Paddington due 17:25 has been cancelled.
This is due to a fault on this train.
Last Updated:21/12/2024 15:01

19:00 Great Malvern to London Paddington due 21:24 will be cancelled.
This is due to a fault on a train in front of this one.
Further Information
GWR (Great Western Railway) has ticket acceptance with West Midland's Railway on the 19.12 Great Malvern to Worcester Foregate Street.
Passengers can then board GWR 20.02 Worcester Foregate Street to London Paddington service.
Last Updated:21/12/2024 16:00

15:52 London Paddington to Great Malvern due 18:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:21/12/2024 15:38

18:52 London Paddington to Great Malvern due 21:13 will be cancelled.
This is due to a broken down train.
Last Updated:21/12/2024 15:42
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #634 on: December 22, 2024, 14:54:52 »

Sunday December 22

Looking good until
Quote
18:48 London Paddington to Hereford due 21:55 will be delayed at Reading.
This is due to a problem currently under investigation.
Last Updated:22/12/2024 13:21

An ability to see into the future?
Logged
grahame
Administrator
Hero Member
*****
Posts: 43029



View Profile WWW Email
« Reply #635 on: December 22, 2024, 15:15:10 »

Sunday December 22

Looking good until
Quote
18:48 London Paddington to Hereford due 21:55 will be delayed at Reading.
This is due to a problem currently under investigation.
Last Updated:22/12/2024 13:21

An ability to see into the future?

Not necessarily ... possible scenario ... someone has messed up the staff rotas and they're investigating who that someone was. But whoever it turns out to have been, the 19:13 departure from Reading will have to wait until around 19:30 so that the staff arriving at 18:59 from Great Malvern can take a required personal needs break.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #636 on: December 22, 2024, 15:56:07 »

Not necessarily ... possible scenario ... someone has messed up the staff rotas and they're investigating who that someone was. But whoever it turns out to have been, the 19:13 departure from Reading will have to wait until around 19:30 so that the staff arriving at 18:59 from Great Malvern can take a required personal needs break.
Question - why does who that someone was affect the posted source of the problem?
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #637 on: December 22, 2024, 17:35:32 »

But later...
Quote
18:48 London Paddington to Hereford due 21:55 will be cancelled.
This is due to a broken down train earlier today.
Last Updated:22/12/2024 17:22

... and in consequence
Quote
23/12/24 05:23 Hereford to London Paddington due 08:23 will be cancelled.
This is due to a broken down train earlier today.
Last Updated:22/12/2024 17:24
Logged
Chris from Nailsea
Administrator
Hero Member
*****
Posts: 19062


Justice for Cerys Piper and Theo Griffiths please!


View Profile Email
« Reply #638 on: December 22, 2024, 20:22:42 »

Not necessarily ... possible scenario ... someone has messed up the staff rotas and they're investigating who that someone was. But whoever it turns out to have been, the 19:13 departure from Reading will have to wait until around 19:30 so that the staff arriving at 18:59 from Great Malvern can take a required personal needs break.
Question - why does who that someone was affect the posted source of the problem?

So Peter, Lord Hendy, can specify precisely who he wants to be sacked.  Huh

Logged

William Huskisson MP (Member of Parliament) was the first person to be killed by a train while crossing the tracks, in 1830.  Many more have died in the same way since then.  Don't take a chance: stop, look, listen.

"Level crossings are safe, unless they are used in an unsafe manner."  Discuss.
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #639 on: December 23, 2024, 10:21:04 »

Monday December 23

After last night's cancellation of the positioning journey,
Quote
23/12/24 05:23 Hereford to London Paddington due 08:23 will be cancelled.
This is due to a broken down train earlier today.
Last Updated:22/12/2024 17:24

This was followed by a points failure between Evesham and Shrub Hill, so there's lots of late running.

1W11 0553 London Paddington to Great Malvern was held at Evesham (+55), arrived Worcester Shrub Hill +53 and was cancelled thereafter.
1W13 0650 London Paddington to Great Malvern was held at Moreton (+40), arrived Worcester Foregate Street +42 and was cancelled thereafter.
1W15 0750 London Paddington to Great Malvern was held at Oxford (+17) and arrived +16.

1P22 08:56 Great Malvern to London Paddington (11:24) was started from Worcester Shrub Hill, was held at Norton (+17) and arrived +15.
Quote
09:55 Great Malvern to London Paddington due 12:23 will be started from Worcester Foregate Street.
This is due to a points failure.
Last Updated:23/12/2024 09:18

and later in the day:
Quote
11:52 London Paddington to Hereford due 14:44 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:23/12/2024 07:24

15:23 London Paddington to Worcester Foregate Street due 17:47 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:23/12/2024 13:15

15:18 Hereford to London Paddington due 18:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:23/12/2024 00:40
The stock for this ran empty from Shrub Hill to Reading and picked up service there.

Quote
18:02 Worcester Foregate Street to London Paddington due 20:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:23/12/2024 13:28
The stock for this ran empty to Paddington.

Even later:
1W03 17:34 London Paddington to Hereford (20:25) was delayed at Didcot, left Oxford +15, was held at Evesham (+28), and arrived +31.
1W34 17:57 London Paddington to Worcester Foregate Street (20:11) arrived +19.
1W43 21:53 London Paddington to Worcester Shrub Hill was cancelled throughout ("due to unknown cause" - RTT» (Real Time Trains - website)) though the stock ran empty.

1P44 19:45 Great Malvern to London Paddington (22:24) was held at Reading (+44) and arrived +53.
« Last Edit: December 24, 2024, 07:32:39 by Worcester_Passenger » Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #640 on: December 24, 2024, 10:37:29 »

Tuesday December 24

Quote
15:23 London Paddington to Worcester Foregate Street due 17:47 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:24/12/2024 08:19

15:52 London Paddington to Great Malvern due 18:26 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:24/12/2024 08:19

16:58 London Paddington to Great Malvern due 19:25 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:24/12/2024 08:57

17:34 London Paddington to Hereford due 20:25 will be terminated at Worcester Shrub Hill.
This is due to a shortage of train crew.
Last Updated:24/12/2024 10:54

18:57 London Paddington to Great Malvern due 21:18 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 11:38

Quote
17:26 Worcester Foregate Street to London Paddington due 19:52 will be terminated at Oxford.
This is due to a shortage of train crew.
Last Updated:24/12/2024 10:01

18:02 Worcester Foregate Street to London Paddington due 20:29 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 11:16

19:04 Great Malvern to London Paddington due 21:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 12:39

12:55 : updated.
« Last Edit: December 24, 2024, 12:55:36 by Worcester_Passenger » Logged
charles_uk
Transport Scholar
Hero Member
******
Posts: 777

thewalkingpage
View Profile
« Reply #641 on: December 24, 2024, 15:54:36 »

Quote
15:18 Hereford to London Paddington due 18:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Didcot Parkway, Reading and London Paddington.
This is due to a shortage of train crew

15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 15:37

16:58 London Paddington to Great Malvern due 19:25 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 15:23

20:56 Worcester Foregate Street to Oxford due 22:21 will be cancelled.
This is due to a shortage of train crew.
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #642 on: December 24, 2024, 16:32:43 »

Quote
15:18 Hereford to London Paddington due 18:29 will be terminated at Worcester Shrub Hill.
It will no longer call at Worcestershire Parkway Hl, Pershore, Evesham, Honeybourne, Moreton-In-Marsh, Kingham, Charlbury, Hanborough, Oxford, Didcot Parkway, Reading and London Paddington.
This is due to a shortage of train crew

15:52 London Paddington to Great Malvern due 18:26 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 15:37

16:58 London Paddington to Great Malvern due 19:25 will be cancelled.
This is due to a shortage of train crew.
Last Updated:24/12/2024 15:23

20:56 Worcester Foregate Street to Oxford due 22:21 will be cancelled.
This is due to a shortage of train crew.

Is anything left?
Logged
charles_uk
Transport Scholar
Hero Member
******
Posts: 777

thewalkingpage
View Profile
« Reply #643 on: December 24, 2024, 19:17:50 »

Quote
Cancellations to services between Oxford and Great Malvern

Due to a shortage of train crew between Oxford and Great Malvern fewer trains are able to run on all lines.

Train services running through these stations will be cancelled or revised. Disruption is expected until the end of the day.
Last Updated:24/12/2024 19:05
Logged
Worcester_Passenger
Transport Scholar
Hero Member
******
Posts: 2031


View Profile
« Reply #644 on: December 24, 2024, 22:14:37 »

Well, the answer to my earlier question is

1W05 19:53  London Paddington to Hereford

Here's the latest score for this evening:

Up trains
1P05 15:18 Hereford to London Paddington (18:29) : Cancelled after Shrub Hill.
1P38 16:32 Great Malvern to London Paddington (19:29) : OK.
1P39 17:30 Worcester Foregate St to London Paddington (19:52) : OK
1P40 18:02 Foregate St to London Paddington (20:29 : cancelled throughout.
2E16 18:51 Evesham to Oxford : OK.
1P42 19:04 Great Malvern to London Paddington : cancelled due to an issue with the train crew (TG).
1P44 19:45 Great Malvern to Reading : cancelled due to late arrival of an inbound service (YI).
1P46 20:56 Worcester Foregate Street to Oxford : cancelled due to an issue with the train crew (TG).

Down trains
1W30 15:23 London Paddington to Foregate St : cancelled after Worcester Shrub Hill due to an issue with the train crew (TG).
1W31 15:52 London Paddington to Great Malvern (18:26) : cancelled due to an issue with the train crew (TG).
2E14 17:04 Didcot Parkway to Evesham : OK
1W33 16:58 London Paddington to Great Malvern (19:26) :  cancelled due to unknown cause (ZW).
1W03 17:34 London Paddington to Hereford (20:25) : cancelled between Worcester Shrub Hill and Hereford due to an issue with the train crew (TG).
1W34 1757 London Paddington to Worcester Foregate Street : cancelled due to an issue with the train crew (TG).
1W36 1857 London Paddington to Great Malvern : cancelled due to an issue with the train crew (TG).
1W05 1953 London Paddington to Hereford : OK
1W41 2052 London Paddington to Worcester Shrub Hill : cancelled due to an issue with the train crew (TG).
1W43 2153 London Paddington to Worcester Shrub Hill : cancelled due to the planned cancellation (was not planned to operate) (PD).
1W45 2251 London Paddington to Worcestershire Parkway : cancelled due to the planned cancellation (was not planned to operate) (PD).
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 41 42 [43] 44
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules (email link to report). Forum hosted by Well House Consultants

Jump to top of pageJump to Forum Home Page