Can someone post a link to Google Maps (or similar) showing the location of the passing loop? It really is poor that such work plans are not piublished in detail from NR» .
It’s from roughly 293 3/4 to 294 mileposts. To be known as Goss Moor Loop.
The new signalling is to be commissioned on Monday 24th March. The existing electronic token block and one-train working is being replaced by ‘proper’ colour light signals controlled from Goodbarrow Junction box using axle counters. Existing semaphores will remain at the box with Track Circuits.
I’m not sure if the new signals will feed out to the wider world so we can see the trains on the likes of Signalmaps and OpenTrainTimes…let’s hope so!