"Disruption is likely to continue into next week, and details of the timetable are currently being finalised. Please keep checking this page for updates".
I can see it going on a lot longer than that, I reckon months. I’m guessing each train will need jacking up, stripping down to access crack, welding, reassembled and then certification (if the work requires substantial changes). That’s got to be the best part of a week to do and 93 sets to complete. You don’t know if there’s a risk more issues aren’t discovered once the sets are stripped down either. They’ve got to go all out on it. Getting everything back for the Summer is crucial.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #211 on: May 11, 2021, 08:14:49 » |
|
From the National Rail website re: GWR▸
"Disruption is likely to continue into next week, and details of the timetable are currently being finalised. Please keep checking this page for updates".
I can see it going on a lot longer than that, I reckon months. I’m guessing each train will need jacking up, stripping down to access crack, welding, reassembled and then certification (if the work requires substantial changes). That’s got to be the best part of a week to do and 93 sets to complete. You don’t know if there’s a risk more issues aren’t discovered once the sets are stripped down either. They’ve got to go all out on it. Getting everything back for the Summer is crucial. That seems a fair assessment from someone "in the know", and the sooner that GWR are honest/realistic about it in order that people can make other plans, the better. If it's "months" given that we're already halfway through May, it'll be a pretty ropey summer for the railways at best. Let's hope the roads hold up.
|
|
|
Logged
|
|
|
|
a-driver
|
|
« Reply #212 on: May 11, 2021, 08:19:18 » |
|
That seems a fair assessment from someone "in the know", and the sooner that GWR▸ are honest/realistic about it in order that people can make other plans, the better.
If it's "months" given that we're already halfway through May, it'll be a pretty ropey summer for the railways at best.
Let's hope the roads hold up.
I imagine once they get a unit stripped down to discover the extent of the problem, get specialists in, get a scope of the works required together and get approval all round then I don’t think any accurate timescales can be given. Each set could be different and require varying levels of work, some could be returned to traffic quite quickly. I’m guessing there’s a lot parties involved.... Hitachi, GWR, DfT» etc etc. Personally I don’t think you tell passengers it’ll be months then, after a through inspection, it’s deemed a large number of sets are safe and quickly returned to traffic. Passengers might ask questions as to how safe the trains are, won’t inspire confidence.
|
|
« Last Edit: May 11, 2021, 08:26:40 by a-driver »
|
Logged
|
|
|
|
Clan Line
|
|
« Reply #213 on: May 11, 2021, 08:36:18 » |
|
"No cracks in here - we're all ready to go" Today's Telelgraph
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #214 on: May 11, 2021, 09:02:07 » |
|
Remaining EMR» High Speed Train's (HST▸ )s withdrawn this weekend. Might we see them in the GWR▸ area from next week?
Edit: VickiS - Clarifying Acronym
|
|
« Last Edit: May 11, 2021, 21:04:56 by VickiS »
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
broadgage
|
|
« Reply #215 on: May 11, 2021, 09:27:30 » |
|
Remaining East Midlands Railway (EMR» ) High Speed Train's (HST▸ )s withdrawn this weekend. Might we see them in the GWR▸ area from next week?
Hopefully, but with what are East Midlands Railway (EMR) replacing them ? if the replacements are IETs▸ or similar then East Midlands Railway (EMR) might want to hang onto the High Speed Train's (HST)s. How many High Speed Train's (HST)s involved ? Edit: VickiS - Clarifying Acronyms
|
|
« Last Edit: May 11, 2021, 21:15:44 by VickiS »
|
Logged
|
A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard. It has space for cycles, surfboards,luggage etc. A 5 car DMU▸ is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
|
|
|
grahame
|
|
« Reply #216 on: May 11, 2021, 09:38:06 » |
|
Remaining EMR» HSTs▸ withdrawn this weekend. Might we see them in the GWR▸ area from next week?
Hopefully, but with what are EMR replacing them ? Class 170 and 360 ... with previously diesel trains London - Corby running using 21 electric units. There are plans for 810s (800 variants) but not yet. They ARE getting there - down to just 2 sets this week, however they would need DfT» derogation as they are drop window, slam door and I suspect dump-on-track trains.
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
PhilWakely
|
|
« Reply #217 on: May 11, 2021, 09:39:02 » |
|
Remaining EMR» HSTs▸ withdrawn this weekend. Might we see them in the GWR▸ area from next week?
It would be the logical choice, but I doubt they could be put to use straightaway. I am no expert on driver/guard qualifications, but I doubt that there are any GWR HSS▸ drivers/guards who still sign full-length High Speed Train's (HST)s with slam doors. The East Midlands Railway (EMR) power cars are also subtly different, having MTU▸ engines I believe. GWR may obtain emergency derogation to use the slam door stock as part of their Castle fleet. Edit: VickiS - Clarifying Acronyms
|
|
« Last Edit: May 11, 2021, 21:16:48 by VickiS »
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #218 on: May 11, 2021, 09:47:27 » |
|
Class 170 and 360 ... with previously diesel trains London - Corby running using 21 electric units. There are plans for 810s (800 variants) but not yet. They ARE getting there - down to just 2 sets this week, however they would need DfT» derogation as they are drop window, slam door and I suspect dump-on-track trains.
DfT's concern with derogation would be that the trains would be a magnet for that small subset of rail enthusiast whose idea of heaven is to stick his head out of a train carriage at 125 mph, knowing that they will always miss any external object.
|
|
|
Logged
|
Now, please!
|
|
|
a-driver
|
|
« Reply #219 on: May 11, 2021, 09:56:38 » |
|
DfT» 's concern with derogation would be that the trains would be a magnet for that small subset of rail enthusiast whose idea of heaven is to stick his head out of a train carriage at 125 mph, knowing that they will always miss any external object.
Put simply. There is nothing else that can be put into service. Potentially there could be more TM‡’s available which could mean that services could be at least double manned to mitigate against enthusiasts with a death wish. I think all drivers and guards will still sign High Speed Train's ( HST▸ )s irrespective of length. Training on slam door will potentially be the only thing TMs need. There obviously may be some new TMs who have never worked slam door stock. Edit: VickiS - Clarifying Acronym
|
|
« Last Edit: May 11, 2021, 21:17:39 by VickiS »
|
Logged
|
|
|
|
PhilWakely
|
|
« Reply #220 on: May 11, 2021, 10:25:19 » |
|
From the National Rail website re: GWR▸
"Disruption is likely to continue into next week, and details of the timetable are currently being finalised. Please keep checking this page for updates".
I can see it going on a lot longer than that, I reckon months. I’m guessing each train will need jacking up, stripping down to access crack, welding, reassembled and then certification (if the work requires substantial changes). That’s got to be the best part of a week to do and 93 sets to complete. You don’t know if there’s a risk more issues aren’t discovered once the sets are stripped down either. They’ve got to go all out on it. Getting everything back for the Summer is crucial. That seems a fair assessment from someone "in the know", and the sooner that GWR are honest/realistic about it in order that people can make other plans, the better. If it's "months" given that we're already halfway through May, it'll be a pretty ropey summer for the railways at best. Let's hope the roads hold up. With the Spring Bank Holiday and associated Summer Half Term break fast approaching; the Covid straightjacket now loose enough to permit staycation breaks, it will be interesting to see how many pax will still want to head to the South West on the train. It wouldn't surprise me if we will still see overcrowding on whatever services will be available.
|
|
|
Logged
|
|
|
|
broadgage
|
|
« Reply #221 on: May 11, 2021, 10:33:54 » |
|
Agree, that is why obtaining extra stock, even if not compliant with every rule, is in my view urgent. If Tornado is allowed to the West country on a charter, then why not daily ? If a heritage diesel is allowed on a charter, then why not daily ? Could not preserved DMUs▸ be used on West country branches ?
Time to start planning NOW rather than wait until the last minute and then "it might have been a possibility, but there was not time for all the paperwork/training/derogations/appeasing the RMT▸ ."
|
|
|
Logged
|
A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard. It has space for cycles, surfboards,luggage etc. A 5 car DMU▸ is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
|
|
|
bobm
|
|
« Reply #222 on: May 11, 2021, 10:39:28 » |
|
|
|
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #223 on: May 11, 2021, 11:16:55 » |
|
12-car EMU▸ at Swindon - that could yet be the new normal, but it shows flexibilty.
|
|
|
Logged
|
Now, please!
|
|
|
IndustryInsider
|
|
« Reply #224 on: May 11, 2021, 12:14:15 » |
|
There’s quite a bit of training and retraining taking place on Turbos and 387s, for TM‡’s especially, and plenty of hard work behind the scenes to secure any sensible* available additional stock from other operators. All trains I have seen have been very quiet, though I expect there are a few busy ones running around, and people will return in their droves when summer and further loosening of restrictions take place.
In terms of returning to a normal service, I see no point wildly guessing until Hitachi have done the research to fully appreciate the issue, and can design and implement a fix.
* I doubt very much you’ll see Tornado, which even with Broadgage’s flights of fancy is somewhat of a stretch. If you have a set of coaches then there are lots of far more sensible options to pull them!
|
|
|
Logged
|