johnneyw
|
 |
« Reply #60 on: April 09, 2023, 19:18:41 » |
|
Presumably that's going to auger some holes for the rebar assemblies on the right of your picture to drop into. As I understand it that's how the piling will be done - none of yer whacking columns into the ground with a big hammer!
There's another one parked between the main and relief lines on the south side of the station site. I do hope that this augers well! ....I'll get me coat!
|
|
|
Logged
|
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #61 on: April 10, 2023, 00:13:03 » |
|
As long as everything augurs well, it should auger well.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #62 on: April 21, 2023, 11:15:16 » |
|
Plenty of activity yesterday, in preparation for the possession on 27/28 May. There were a fair few orange-clad people about, but I seem to have missed them!: 
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
TonyK
Global Moderator
Hero Member
    
Posts: 6642
The artist formerly known as Four Track, Now!
|
 |
« Reply #63 on: April 21, 2023, 11:43:25 » |
|
Is the possession just the two lines? No bustitutions in RTT» .
|
|
|
Logged
|
Now, please!
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #64 on: April 21, 2023, 13:58:15 » |
|
Is the possession just the two lines? No bustitutions in RTT» .
Yes; this one (27-28 May) and the later one (3-18 June) just involve the relief lines. Lawrence Hill and Stapleton Rd will only be served by Severn Beach line trains during these periods. I was going to say that this work would have been much more disruptive if there were still two tracks here, but as it wouldn't have been possible to open a new station the work wouldn't have been done!
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
TonyK
Global Moderator
Hero Member
    
Posts: 6642
The artist formerly known as Four Track, Now!
|
 |
« Reply #65 on: April 21, 2023, 17:14:38 » |
|
Yes; this one (27-28 May) and the later one (3-18 June) just involve the relief lines. Lawrence Hill and Stapleton Rd will only be served by Severn Beach line trains during these periods.
I was going to say that this work would have been much more disruptive if there were still two tracks here, but as it wouldn't have been possible to open a new station the work wouldn't have been done!
I had reached the same conclusion independently.
|
|
« Last Edit: April 22, 2023, 12:49:35 by TonyK »
|
Logged
|
Now, please!
|
|
|
Bmblbzzz
|
 |
« Reply #66 on: April 21, 2023, 22:47:18 » |
|
Yes; this one (27-28 May) and the later one (3-18 June) just involve the relief lines. Lawrence Hill and Stapleton Rd will only be served by Severn Beach line trains during these periods.
I was going to say that this work would have been much more disruptive if there were still two tracks here, but as it wouldn't have been possible to open a new station the work wouldn't have been done!
I had reached the conclusion independently. Two platforms now!
|
|
|
Logged
|
Waiting at Pilning for the midnight sleeper to Prague.
|
|
|
johnneyw
|
 |
« Reply #67 on: April 24, 2023, 21:22:51 » |
|
Presumably that's going to auger some holes for the rebar assemblies on the right of your picture to drop into.
It looks like the auger has done it's job. Although the attached picture was taken a few seconds too late to see it clearly, the photo shows the rebar assemblies being loaded up onto a truck, presumably to be transported to the new excavations.
|
|
|
Logged
|
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #68 on: April 25, 2023, 12:33:16 » |
|
Couple of pictures today: A piling rig between the mains and reliefs:  Work on the new access on the west (Station Road) side:  There seemed to be work going on towards Temple Meads too, but I couldn't get sight of it.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
paul7575
|
 |
« Reply #69 on: June 02, 2023, 17:27:20 » |
|
Report on Network Rail website of an upcoming blockade to install platforms at future Ashley Down station: PS Filton Bank reverts to a two track railway for the duration. “Two Track Now”  Paul
|
|
« Last Edit: June 02, 2023, 20:56:38 by paul7575 »
|
Logged
|
|
|
|
stuving
|
 |
« Reply #70 on: June 02, 2023, 23:11:02 » |
|
Report on Network Rail website of an upcoming blockade to install platforms at future Ashley Down station: PS Filton Bank reverts to a two track railway for the duration. “Two Track Now”  Paul At the end of that page NR» say this: This summer also sees essential track maintenance work taking place within the Severn Tunnel, which will be closed from Friday 9 June to Sunday 18 June for vital track replacement. Passengers are advised to check before travelling between these dates, as a bus replacement service will be in operation between Bristol Parkway and Cardiff Central. That work dictated the timing of the Ashley Down work, as it makes the closure of two tracks almost "free". There's an NR page an that work too, which includes the surprising snippet of information that they are using tin-plated sleepers! Trains will be diverted or replaced by buses between Friday 9 and Sunday 18, and on Sunday 25 June, as Network Rail works around the clock to renew the tracks in the Severn Tunnel.
Engineers will replace 3.2km of old track, as well as 5,200 sleepers (track supports) and 14,000 tonnes of ballast (supporting stone) over a ten-day period.
Salt-water makes for a corrosive environment inside the tunnel and track that would usually last 25 years needs to be replaced every ten. The new sleepers will be coated in tin to extend their life.
In 2022, Network Rail replaced 3km of track on the Monmouthshire side of the tunnel. This June, the track will be replaced on the South Gloucestershire side.
|
|
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
    
Posts: 6642
The artist formerly known as Four Track, Now!
|
 |
« Reply #71 on: June 03, 2023, 11:50:23 » |
|
|
|
|
Logged
|
Now, please!
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #72 on: June 05, 2023, 11:19:20 » |
|
A hive of activity at Ashley Down yesterday (Sunday). This is a difficult location to photograph, but hopefully these give a flavour: Station entrance from Station Road. The red brick building on the left is the old Station Hotel.  Work on the relief lines. ---------------------------------------------------- Cllr David Wilcox has some photos, taken from a passing train, on his twitter feed. This one is more or less the reverse angle of my second photo, and shows the site of the demolished old platform:  ...and this shows the reliefs being dismantled, and the pile tops for a new platform: 
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
Red Squirrel
Administrator
Hero Member
    
Posts: 5496
There are some who call me... Tim
|
 |
« Reply #73 on: June 05, 2023, 11:24:38 » |
|
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
Bmblbzzz
|
 |
« Reply #74 on: June 05, 2023, 21:25:26 » |
|
I didn't realize they were going to have to move the tracks. I thought they had been been put down with the potential platforms in mind when the four-tracking was done.
|
|
|
Logged
|
Waiting at Pilning for the midnight sleeper to Prague.
|
|
|
|