Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
No recent travel & transport from BBC stories as at 06:55 20 Apr 2025
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railsay Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
20th Apr (1789)
Opening of Sapperton Canal Tunnel

Train RunningCancelled
07:51 Swansea to London Paddington
08:58 Bristol Parkway to Swansea
09:35 Swindon to Cheltenham Spa
09:55 Bristol Parkway to London Paddington
10:49 Cheltenham Spa to London Paddington
11:36 London Paddington to Carmarthen
12:30 Swindon to Cheltenham Spa
13:30 London Paddington to Bristol Temple Meads
14:00 Cheltenham Spa to Swindon
15:09 Liskeard to Looe
15:29 Swindon to Cheltenham Spa
15:40 Plymouth to Penzance
15:41 Looe to Liskeard
16:35 Par to Newquay
17:00 Cheltenham Spa to London Paddington
17:09 Weston-Super-Mare to Severn Beach
17:16 Bristol Temple Meads to Severn Beach
17:30 London Paddington to Bristol Temple Meads
17:37 London Paddington to Swansea
17:48 Bristol Temple Meads to Weymouth
17:55 Newquay to Par
18:00 Cardiff Central to Taunton
18:01 Severn Beach to Bristol Temple Meads
18:15 Penzance to Plymouth
18:35 Severn Beach to Bristol Temple Meads
19:43 Swindon to Westbury
20:00 Bristol Temple Meads to London Paddington
20:09 Portsmouth Harbour to Cardiff Central
20:11 Weymouth to Bristol Temple Meads
20:17 Taunton to Bristol Temple Meads
21:39 Bristol Temple Meads to Gloucester
22:45 London Paddington to Bristol Parkway
23:12 Bristol Temple Meads to Weston-Super-Mare
23:49 Weston-Super-Mare to Bristol Temple Meads
Short Run
08:15 Penzance to London Paddington
08:47 Penzance to Cardiff Central
09:22 Bristol Temple Meads to Portsmouth Harbour
10:00 Cardiff Central to Taunton
10:25 Cardiff Central to Portsmouth Harbour
10:55 Cardiff Central to Penzance
10:57 Paignton to Exmouth
11:41 Swindon to Weymouth
11:50 Penzance to Cardiff Central
12:26 Exmouth to Paignton
13:16 Taunton to Cardiff Central
14:09 Portsmouth Harbour to Cardiff Central
15:00 Cardiff Central to Penzance
15:35 Severn Beach to Weston-Super-Mare
16:18 Penzance to London Paddington
16:25 Cardiff Central to Portsmouth Harbour
18:00 London Paddington to Penzance
18:11 Castle Cary to Swindon
19:39 Bristol Temple Meads to Worcester Shrub Hill
20:30 London Paddington to Weston-Super-Mare
20:30 Cardiff Central to Portsmouth Harbour
21:57 Worcester Shrub Hill to Bristol Temple Meads
etc
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 20, 2025, 06:57:53 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[96] RNLI station celebrates 10 years of saving lives - Portishead,...
[89] FOSS and FOSW validity - some quirks
[88] St Erth station - facilities, footbridge, improvements, incide...
[67] Fifteen years of the Transwilts CRP
[59] Wiltshire Day Rover - new multi-operator bus ticket
[56] Eyesight rules for motorists unsafe, says coroner
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: [1] 2
  Print  
Author Topic: Signalling at Worcestershire Parkway  (Read 10260 times)
grahame
Administrator
Hero Member
*****
Posts: 43852



View Profile WWW Email
« on: April 25, 2020, 10:35:48 »

Question for the signalling experts - can a train arriving from Worcester Shrub Hill in passenger service terminate at Worcestershire Parkway and return in passenger service back into Worcester?
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
IndustryInsider
Moderator
Hero Member
*****
Posts: 10450


View Profile
« Reply #1 on: April 25, 2020, 13:49:28 »

Question for the signalling experts - can a train arriving from Worcester Shrub Hill in passenger service terminate at Worcestershire Parkway and return in passenger service back into Worcester?

I expect it could, but only if a pilotman was provided.  In the same way that passenger trains from the west can and have terminated and started back from Hanborough when there's engineering work taking place east of Hanborough.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
grahame
Administrator
Hero Member
*****
Posts: 43852



View Profile WWW Email
« Reply #2 on: April 25, 2020, 13:55:33 »

Question for the signalling experts - can a train arriving from Worcester Shrub Hill in passenger service terminate at Worcestershire Parkway and return in passenger service back into Worcester?

I expect it could, but only if a pilotman was provided.  In the same way that passenger trains from the west can and have terminated and started back from Hanborough when there's engineering work taking place east of Hanborough.

So not something it's signalled for in daily traffic then - thanks.
Logged

Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
Oxonhutch
Transport Scholar
Hero Member
******
Posts: 1373



View Profile
« Reply #3 on: April 25, 2020, 15:11:43 »

I expect it could, but only if a pilotman was provided.  In the same way that passenger trains from the west can and have terminated and started back from Hanborough when there's engineering work taking place east of Hanborough.

In the Hanborough case, does the pilotman talk the driver past the Morton-in-Marsh Up Starter?
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10450


View Profile
« Reply #4 on: April 25, 2020, 15:17:30 »

I expect it could, but only if a pilotman was provided.  In the same way that passenger trains from the west can and have terminated and started back from Hanborough when there's engineering work taking place east of Hanborough.

In the Hanborough case, does the pilotman talk the driver past the Morton-in-Marsh Up Starter?

It's Ascott box that controls the area, not Moreton.  But, IIRC ('if I recall/remember/read correctly'), the pilotman does indeed talk the driver past the signal at Charlbury with the signallers authority.  Then at Hanborough the pilotman obtains authority for the return journey.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #5 on: April 25, 2020, 15:47:29 »

Just to clarify.  To turn a train back in a signalled single line section where there is no signal provided at the reversing location generally requires PILOTMAN (or should that be PILOTPERSON) working.
« Last Edit: April 25, 2020, 18:31:48 by SandTEngineer » Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #6 on: April 26, 2020, 11:00:54 »

Ideally  the Cotswold line should have been redoubled at least part way to Pershore. Worcestershire Parkway  High level then having two platforms.This would alow an Oxford bound train to clear Norton jn whilst waitng the single line. With the appropriate signalling i.e making the Cotswold lines bi-directional trains could be turned round from both directions

But that would have cost too much .
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #7 on: April 26, 2020, 12:36:11 »

Just to clarify.  To turn a train back in a signalled single line section where there is no signal provided at the reversing location generally requires PILOTMAN (or should that be PILOTPERSON) working.
Why not just pilot - oh I see it is used to mean a pilot engine. 
Logged
JontyMort
Hero Member
*****
Posts: 342


View Profile
« Reply #8 on: April 26, 2020, 13:12:06 »

Ideally  the Cotswold line should have been redoubled at least part way to Pershore. Worcestershire Parkway  High level then having two platforms.This would alow an Oxford bound train to clear Norton jn whilst waitng the single line. With the appropriate signalling i.e making the Cotswold lines bi-directional trains could be turned round from both directions


Specifically, by allowing an up train into Parkway even if it were going to be delayed there by a late-running train from Evesham, it would have made connections towards Cheltenham and Bristol much more resilient.

It certainly should have been re-doubled between Norton Junction and Parkway - a ridiculously short chainage. Talk about ships and ha’p’orths of tar.
Logged
IndustryInsider
Moderator
Hero Member
*****
Posts: 10450


View Profile
« Reply #9 on: April 26, 2020, 13:35:09 »

If it were controlled by modern signalling that might have been a fairly straightforward task, but could Norton Junction signalbox deal with the extra signalling needed?  An extra platform at Worcestershire Parkway, on a steep embankment, would also have costed quite a bit extra.

Possibly one for the future, though judging by the North Cotswold Line Taskforce's recent report, it is more likely that Evesham to Pershore will be redoubled rather than Norton Junction to Pershore.
Logged

To view my GWML (Great Western Main Line) Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
JontyMort
Hero Member
*****
Posts: 342


View Profile
« Reply #10 on: April 26, 2020, 14:24:09 »


Possibly one for the future, though judging by the North Cotswold Line Taskforce's recent report, it is more likely that Evesham to Pershore will be redoubled rather than Norton Junction to Pershore.

Yes, I’ve seen the report. But isn’t there a problem with the up platform at Pershore - sold off or something?
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #11 on: April 26, 2020, 17:15:11 »


Possibly one for the future, though judging by the North Cotswold Line Taskforce's recent report, it is more likely that Evesham to Pershore will be redoubled rather than Norton Junction to Pershore.

Yes, I’ve seen the report. But isn’t there a problem with the up platform at Pershore - sold off or something?

As I keep saying when these problems come up, there is always the PENRYN solution...... Grin
Logged
TonyN
Transport Scholar
Hero Member
******
Posts: 517



View Profile
« Reply #12 on: April 26, 2020, 18:36:16 »

The land for the up platform at Pershore is still available but there is currently no access as the land behind the platform was sold off.
The current plan is to add a new car park on the up side at the east end of the station. A footbridge is available to link the car park but it is steps only no ramps or lifts.
Disabled parking would be on the existing small car park adjacent to the existing platform on the down side.

The problem with the task force proposal to double to just west of pershore is that there would then be a requirment to provide another footbridge with ramps or lifts.
Much cheaper to just keep the existing single platform and double to just east of the station.
No need for a passing loop so not realy a Penryn solution sorry S+TE
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #13 on: April 26, 2020, 19:11:13 »

The land for the up platform at Pershore is still available but there is currently no access as the land behind the platform was sold off.
The current plan is to add a new car park on the up side at the east end of the station. A footbridge is available to link the car park but it is steps only no ramps or lifts.
Disabled parking would be on the existing small car park adjacent to the existing platform on the down side.

The problem with the task force proposal to double to just west of pershore is that there would then be a requirment to provide another footbridge with ramps or lifts.
Much cheaper to just keep the existing single platform and double to just east of the station.
No need for a passing loop so not realy a Penryn solution sorry S+TE


Sorry, didn't make myself very clear.  No need to double track from Evesham, just install a PENRYN style passing loop at Pershore.  Much cheaper (at NR» (Network Rail - home page) prices) I would estimate.
Logged
eightf48544
Transport Scholar
Hero Member
******
Posts: 4574


View Profile Email
« Reply #14 on: April 27, 2020, 10:36:51 »

As I keep saying when these problems come up, there is always the PENRYN solution...... Grin

Or the even simpler Bad Dobran solution where trians meet head to head on the single platform! Less signalling units but the ORR» (Office of Rail and Road, formerly Office of Rail Regulation - about) would never allow it. I've a video taken at another station on the line of two trains meeting head on.

i should say there is a point between the trains to take one round the other.
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1] 2
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page