|
grahame
|
|
« Reply #1 on: April 24, 2020, 18:05:38 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure.
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
eightonedee
|
|
« Reply #2 on: April 24, 2020, 19:10:27 » |
|
"Eric, I'm bored. Nowt to do this afternoon."
"EE, Fred, I've an idea. There's a whole load of condemned six plank wagons down in t'yard. Fancy a game of buffer stop testing?"
"Capital idea, Eric! I'll get Bert to bring one of the J11's up from the shed and let's have an afternoon of fun!"
"Don't forget to bring the cine camera, so foreman'll think it's serious research"
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #3 on: April 24, 2020, 19:18:38 » |
|
I was standing next to a set of stop blocks when a "heavy shut" extended the sidings by 15 meters very frightening I need to change my underpants
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
TonyN
|
|
« Reply #4 on: April 24, 2020, 21:38:49 » |
|
And then they all adjourned to the city hotel for a pint of Tetleys.
Many years ago I was walking alongside the buffer stops on the platform at Kidderminster when the driver of WD 2-10-0 Gordon forgot to move the reverser before opening the regulator while running round.
|
|
|
Logged
|
|
|
|
Robin Summerhill
|
|
« Reply #5 on: April 24, 2020, 23:26:47 » |
|
"Eric, I'm bored. Nowt to do this afternoon."
"EE, Fred, I've an idea. There's a whole load of condemned six plank wagons down in t'yard. Fancy a game of buffer stop testing?"
"Capital idea, Eric! I'll get Bert to bring one of the J11's up from the shed and let's have an afternoon of fun!"
"Don't forget to bring the cine camera, so foreman'll think it's serious research"
With a Leeds/ Bradford accent like that, at least one of 'em should be called Eli...
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #6 on: April 25, 2020, 07:35:55 » |
|
"Eric, I'm bored. Nowt to do this afternoon."
"EE, Fred, I've an idea. There's a whole load of condemned six plank wagons down in t'yard. Fancy a game of buffer stop testing?"
"Capital idea, Eric! I'll get Bert to bring one of the J11's up from the shed and let's have an afternoon of fun!"
"Don't forget to bring the cine camera, so foreman'll think it's serious research"
And today someone would suggest doing a computer model ………………. no where near as much fun
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
eightf48544
|
|
« Reply #7 on: April 25, 2020, 10:48:14 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure. Although they broke away from the siding the buffer stops survived relatively intact. hoever the wagons didn't come out it too well. Hope they were already Red Carded because a lot look like scrap.
|
|
|
Logged
|
|
|
|
ellendune
|
|
« Reply #8 on: April 25, 2020, 10:52:38 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure. Although they broke away from the siding the buffer stops survived relatively intact. however the wagons didn't come out it too well. Hope they were already Red Carded because a lot look like scrap. The most common mode of failure seemed to be the rails breaking at the fishplates at the first joint away from the buffer stops followed by the movement of that whole section of track together with the buffer stops.
|
|
|
Logged
|
|
|
|
stuving
|
|
« Reply #9 on: April 25, 2020, 11:45:32 » |
|
And today someone would suggest doing a computer model ………………. no where near as much fun Ah, but to set up your model you need all the parameters - and that calls for experiments, as does the validation of course. After that it does get boring, though.
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #10 on: April 25, 2020, 12:21:10 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure. Although they broke away from the siding the buffer stops survived relatively intact. hoever the wagons didn't come out it too well. Hope they were already Red Carded because a lot look like scrap. Most of the wagons seemed to have the words 'Condemed Wagon on Loan to Chief Civil Engineer' lettered on them. The wooden bodies didn't hold out much for anything to be returned at the end of the tests though....
|
|
|
Logged
|
|
|
|
TonyN
|
|
« Reply #11 on: April 25, 2020, 17:19:57 » |
|
Just for the record the location used was City road goods station Bradford. A former GNR line that closed in 1972. It was a goods only branch off the line from St Dunstans on the current line from Leeds to Bradford Interchange that went to Keighley and Halifax. Queensbury tunnel on the Halifax part of the line has also recently been in the news due to the Highway authoritys wanting to fill the tunnel in.
|
|
« Last Edit: April 25, 2020, 17:34:42 by TonyN »
|
Logged
|
|
|
|
Electric train
|
|
« Reply #12 on: April 25, 2020, 18:07:43 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure.
The stop blocks need to arrest the progress of the train hitting them, if the stop blocks are solid wall not only will the train most likely be totally destroyed there is a high risk of the waggons / carriages knife jacking across other roads. Many of the old style of stop blocks had weak links connecting them to the running rails, wood was not uncommon
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
stuving
|
|
« Reply #13 on: April 25, 2020, 18:28:09 » |
|
I can't help wondering how much was a test of the buffer stops and how much was a test of the last track joint before the buffer stop as that seems in most cases to have been the point of failure. Although they broke away from the siding the buffer stops survived relatively intact. however the wagons didn't come out it too well. Hope they were already Red Carded because a lot look like scrap. The most common mode of failure seemed to be the rails breaking at the fishplates at the first joint away from the buffer stops followed by the movement of that whole section of track together with the buffer stops. Is that a failure? Isn't it the intended way for it to dissipate energy? The idea, I take it, is to provide something much cheaper than an engineered solution using hydraulics (like the ones being removed from Paddington) or torturing a steel bar (as used in fenders for big ships). But the requirement is the same: to stop a train without destroying it before it goes off to pay a social call on the neighbours.
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #14 on: April 25, 2020, 18:30:30 » |
|
Modern buffer stops have to have a 20m safety zone beyond them. That can be reduced (or even increased) following Risk Assessment.
|
|
|
Logged
|
|
|
|
|