Bmblbzzz
|
|
« Reply #60 on: March 22, 2023, 16:41:24 » |
|
I haven't found a website of that name to try to connect to.
|
|
|
Logged
|
Waiting at Pilning for the midnight sleeper to Prague.
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5447
There are some who call me... Tim
|
|
« Reply #61 on: March 23, 2023, 08:52:56 » |
|
Future4West is a thing: https://www.future4west.co.uk/Not very exciting at the moment, but maybe it’ll change with time. I presume the ‘4’ refers to the four proposed rapid transit lines, as well as being a homonym of ‘for’. If you google it, you may find stuff about a band from Dundalk and all sorts of other things. Google assumes the ‘4’ is a mistake unless you tell it otherwise.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
Noggin
|
|
« Reply #62 on: March 24, 2023, 11:34:02 » |
|
Has anyone actually managed to connect to the site
Future4West
Because I have not.
I see a login page but if you go to https://staging.future4west.co.uk/ in Google Chrome and ignore the security messages you can see something on the A38 upgrade which may or may not be news.
|
|
|
Logged
|
|
|
|
Noggin
|
|
« Reply #63 on: March 24, 2023, 11:40:30 » |
|
Or perhaps it was just horse-trading? WECA pay £13.8m consultants fee to kick the project into the grass long enough for Marv to be out of office. Marv gets to say "I got this transformational idea to the next stage". Marv stops blocking WECA. WECA include in the report scope some stuff they might actually be interested in. In the scope of the report they include a bunch of stuff
|
|
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #64 on: March 31, 2023, 17:51:30 » |
|
Not very exciting at the moment, but maybe it’ll change with time. I presume the ‘4’ refers to the four proposed rapid transit lines, as well as being a homonym of ‘for’.
Four Lines Now? I'm interested...
|
|
|
Logged
|
Now, please!
|
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #67 on: September 26, 2023, 16:17:33 » |
|
In fairness, 55% of London Underground is above ground. As a dog returneth to his vomit, so a fool returneth to his folly. Planning for more buses will get Bristol nowhere. A mix of heavy rail where it can be done and light rail where it can't is the way forward.
|
|
|
Logged
|
Now, please!
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5447
There are some who call me... Tim
|
|
« Reply #68 on: September 26, 2023, 19:14:51 » |
|
Indeed. A local rail campaign recently tweeted: Honest question: Can anyone explain the point of the 'guided busway' sections of the m2 bus route? The (specially equipped!) bus slows to a crawl, enters the busway, dawdles through it, then speeds up again when it gets to the end. #bristolrail So far this has 8413 views and 47 likes. Seems to have struck a bit of a chord.
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
simonw
|
|
« Reply #69 on: September 26, 2023, 20:57:31 » |
|
The fact the Bristol has a mayor (soon to be replaced by committee) that wants an underground, and the West of England has a mayor that wants buses is interesting.
Too much ambition by one and zero by the other.
Whilst not a transport guru, I'd like to see the FOSBR▸ (Bristol Rail Campaign) plan for the West of England come to fruition, with frequent services, local bus hubs and finally an integrated local rail and bus tickets that facilities local travel and not make it impossible by public transport.
|
|
|
Logged
|
|
|
|
johnneyw
|
|
« Reply #70 on: September 27, 2023, 19:32:43 » |
|
Interesting though that the Bristol Live report carrying Mayor Dan's reassertion that there wouldn't be an underground was followed by him talking of visiting Coventry shortly to see a transport innovation in the city. He was presumably talking about the Very Light Rail facility there.
|
|
|
Logged
|
|
|
|
chuffed
|
|
« Reply #71 on: September 27, 2023, 21:07:06 » |
|
Given the width of the guidedbusway rails on the m2...I wouldn't be a bit surprised if Marvin ordered some broad gauge trains to replace the buses.....as a parting shot to a certain WECA» mayor.
|
|
|
Logged
|
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #72 on: September 27, 2023, 23:09:25 » |
|
Given the width of the guidedbusway rails on the m2...I wouldn't be a bit surprised if Marvin ordered some broad gauge trains to replace the buses.....as a parting shot to a certain WECA» mayor.
Maybe not broad gauge, but light rail would fit nicely. The skew bridge could be an issue though.
|
|
|
Logged
|
Now, please!
|
|
|
Red Squirrel
Administrator
Hero Member
Posts: 5447
There are some who call me... Tim
|
|
« Reply #73 on: September 28, 2023, 16:01:55 » |
|
Given the width of the guidedbusway rails on the m2...I wouldn't be a bit surprised if Marvin ordered some broad gauge trains to replace the buses.....as a parting shot to a certain WECA» mayor.
Maybe not broad gauge, but light rail would fit nicely. The skew bridge could be an issue though. Nice bit of interlaced track would sort that!
|
|
|
Logged
|
Things take longer to happen than you think they will, and then they happen faster than you thought they could.
|
|
|
Noggin
|
|
« Reply #74 on: September 28, 2023, 21:24:04 » |
|
Given the width of the guidedbusway rails on the m2...I wouldn't be a bit surprised if Marvin ordered some broad gauge trains to replace the buses.....as a parting shot to a certain WECA» mayor.
Reminds me of the Basque country where they basically build everything to metre gauge, including new tramways and metros, presumably to annoy the rest of Spain, that is apart from the new high-speed line which will be standard gauge, presumably that's OK because it connects to France. Incidentally, if you think HS2▸ is taking a long time, Google the Basque high-speed lines where there are long lengths of the route with the civils done but no track or overheads because they can't agree how to get the lines into the big cities.
|
|
|
Logged
|
|
|
|
|