charles_uk
|
|
« Reply #60 on: February 26, 2019, 13:42:55 » |
|
Seems to be various things going on, all creating a bit of a mess: 10:59 Great Malvern to London Paddington due 13:29 will no longer call at Slough. It has been previously delayed, has been further delayed at Moreton-in-Marsh and is now 25 minutes late. This is due to a fault on a train in front of this one.
11:20 London Paddington to Worcester Foregate Street due 13:44 will be terminated at Worcester Shrub Hill. It will no longer call at Worcester Foregate Street. This is due to a broken down train earlier today.
12:00 Worcester Foregate Street to London Paddington due 14:27 is being delayed between Hanborough and Oxford. This is due to a fault with the signalling system.
12:21 London Paddington to Worcester Shrub Hill due 14:38 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham, Moreton-in-Marsh, Honeybourne, Evesham, Pershore and Worcester Shrub Hill. This is due to a fault with the signalling system.
13:55 Worcester Foregate Street to London Paddington due 16:30 will be started from Worcester Shrub Hill. It will no longer call at Worcester Foregate Street. This is due to a broken down train earlier today. And modified to add in details of the earlier broken down train: 1P25 0954 Great Malvern to Moreton-in-Marsh Great Western Railway service This service was cancelled between Moreton-in-Marsh and London Paddington due to a problem with the train (M8). which was one of the five coach vice nine short-formations. And JourneyCheck now updated with details of the fault with the signalling system: Cancellations to services between Oxford and Moreton-In-Marsh
Due to a fault with the signalling system between Oxford and Moreton-in-Marsh all lines are blocked.
Train services running through these stations may be cancelled or delayed by up to 60 minutes. Disruption is expected until 15:00 26/02.
Last Updated:26/02/2019 13:52 14:23 lines now open. The 12:00 WOF: PAD» has gone through Wolvercote Junction 54 minutes late. And a cancellation too now: 15:22 Worcester Shrub Hill to London Paddington due 17:28 will be cancelled. This is due to a fault with the signalling system.
|
|
« Last Edit: February 26, 2019, 14:25:38 by charles_uk »
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #61 on: February 26, 2019, 17:06:32 » |
|
And a predictable knock on effect from the earlier disruption: 15:50 London Paddington to Moreton-in-Marsh due 17:26 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham and Moreton-in-Marsh. This is due to a fault with the signalling system earlier today.
Last Updated:26/02/2019 16:07 This service failed to get beyond Oxford on 41 occasions last year. This year, it's just the second time so far.
|
|
|
Logged
|
|
|
|
jmc85
|
|
« Reply #62 on: February 26, 2019, 17:13:50 » |
|
Bizarre set of events at Paddington on this one.
Noticed it was booked as 10 car which seemed odd - boarded as normal with no special announcements about being in front set - then at departure time we were held as they decided they couldn’t take the whole train to Moreton...
Finally left (all 10 carriages) about 12 mins late - with train manager unsure what was happening after Oxford (although me being a regular on this train knew the late departure alone was enough for us to be cancelled at Oxford).
Part way through further delayed journey, announced that we indeed couldn’t go beyond Oxford
Now waiting for the likely packed 1622 stopper (which is also short formed today...)
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #63 on: February 26, 2019, 19:47:58 » |
|
And the previous 1W31, 15:22 PAD» -GMV was long formed with a 9-car vice 5. A very topsy-turvy day! No excuses for allocating and then not promptly acting upon a 10-car along the Cotswolds as we all know they currently can’t operate on the route.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
ray951
|
|
« Reply #64 on: February 26, 2019, 20:55:53 » |
|
And the previous 1W31, 15:22 PAD» -GMV was long formed with a 9-car vice 5. A very topsy-turvy day! No excuses for allocating and then not promptly acting upon a 10-car along the Cotswolds as we all know they currently can’t operate on the route.
At Oxford they said it was cancelled due to signalling problems, maybe too embarrassing to admit or they didn't know the real reason. Could they not have split it at Oxford and put half the train in the sidings? Although I guess an extra driver would have been an issue.
|
|
« Last Edit: February 27, 2019, 09:09:35 by ray951 »
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #65 on: February 26, 2019, 21:27:19 » |
|
Realtime Trains has an explanation as to why the 15:50 PAD» :MIM was terminated at Oxford! 1W32 1550 London Paddington to Oxford Great Western Railway service This service was cancelled between Oxford and Moreton-in-Marsh due to the planned train being replaced with a slower train (MS).
|
|
|
Logged
|
|
|
|
philipbourton
|
|
« Reply #66 on: February 27, 2019, 06:30:17 » |
|
I see the 447 Hereford to Paddington (which I presume is the 0623 Kingham - Paddington) is 5 carriages instead of 9. No explanation given - but yet they still designate the front 2 coaches to 1st class - leaving 3 carriages for us mere mortals. Hate to think how long it will take to get off the train at Paddington ...
Also, has anyone else noticed that on some of the new trains, none of the flushes are working on the toilers ... don't recall that happening on the older trains. (sorry if that isn't relevant for this chain - no pun intended)
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #67 on: February 27, 2019, 07:29:01 » |
|
I see the 447 Hereford to Paddington (which I presume is the 0623 Kingham - Paddington) is 5 carriages instead of 9. No explanation given - but yet they still designate the front 2 coaches to 1st class - leaving 3 carriages for us mere mortals. ...
Isn't the second carriage a composite - with just under 60 standard class seats in addition to just under 20 first class? Sorry to be the pedant this morning! Still likely to be very tight!!
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
charles_uk
|
|
« Reply #68 on: February 27, 2019, 09:32:29 » |
|
08:21 London Paddington to Hereford due 11:40 will be diverted between Reading and Worcester Shrub Hill and terminated at Worcester Shrub Hill. It will no longer call at Slough, Oxford, Hanborough, Charlbury, Kingham, Moreton-in-Marsh, Honeybourne, Evesham, Pershore, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford. It is being delayed at London Paddington. This is due to a fault on this train.
Last Updated:27/02/2019 08:53
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #69 on: February 27, 2019, 14:17:33 » |
|
Lots of niggly little issues on the Cotswold Line over the last few days: 1W01 1022 London Paddington to Worcester Foregate Street Great Western Railway service This service was cancelled between Worcester Foregate Street and Hereford due to a problem with the doors (M7).
1W23 1120 London Paddington to Worcester Shrub Hill Great Western Railway service This service was cancelled between Worcester Shrub Hill and Worcester Foregate Street due to a problem with the doors (M7). and after the earlier issues with the 08:21 PAD» : HFD» 12:09 Hereford to London Paddington due 15:27 will be started from Worcester Foregate Street. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Slough. It is being delayed at Worcester Foregate Street. This is due to a fault on this train. and has just hit Evesham 47 minutes late. Modified to add the consequential: 15:14 Hereford to London Paddington due 18:28 will be started from Worcester Foregate Street. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern and Malvern Link. This is due to a fault on this train.
|
|
« Last Edit: February 27, 2019, 15:42:52 by charles_uk »
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #70 on: February 27, 2019, 17:20:21 » |
|
Me again! For the second day running, and reminding me why I changed my working hours to avoid this particular "service": 15:50 London Paddington to Moreton-in-Marsh due 17:26 was terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham and Moreton-in-Marsh. This is due to a fault on a train in front of this one.
Last Updated:27/02/2019 17:06
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #71 on: February 27, 2019, 17:55:04 » |
|
Door issues on 1P39 leading to single line congestion.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
charles_uk
|
|
« Reply #72 on: March 07, 2019, 07:50:26 » |
|
For the fifth time this year: 07:10 Moreton-in-Marsh to London Paddington due 08:51 will be started from Oxford. It will no longer call at Moreton-in-Marsh, Kingham, Charlbury and Hanborough. This is due to a problem currently under investigation.
Last Updated:07/03/2019 06:11
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #73 on: March 12, 2019, 18:49:21 » |
|
After this afternoon's problem with the electrical supply at Paddington: 17:52 London Paddington to Worcester Shrub Hill due 20:06 will be cancelled. This is due to failure of the electricity supply.
Last Updated:12/03/2019 17:42 and the following 18:22 Paddington to Hereford has been delayed departing 22 minutes late.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #74 on: March 13, 2019, 08:16:34 » |
|
A bit of disruption in the Hereford area this morning: 05:28 Hereford to London Paddington due 08:28 was started from Worcester Shrub Hill. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street. It has been delayed at Worcester Shrub Hill and is now 18 minutes late. This is due to the fire brigade dealing with an incident.
06:42 Hereford to London Paddington due 09:46 will be started from Worcester Shrub Hill. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street. This is due to the fire brigade dealing with an incident.
|
|
|
Logged
|
|
|
|
|