Unusual and slightly disconcerting for a normal midweek service (or is it the half-term effect?): 13:22 London Paddington to Worcester Shrub Hill due 15:27 will be cancelled. This is due to a shortage of train crew.
15:52 Worcester Shrub Hill to London Paddington due 18:00 will be cancelled. This is due to a shortage of train crew. Last Updated:28/10/2019 12:44[/size] and something from last Friday: 1W36 1752 London Paddington to Oxford Departing on 25th October 2019 This service was cancelled between Oxford and Worcester Shrub Hill due to trespass (XA).
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #211 on: October 28, 2019, 13:27:05 » |
|
Unusual and slightly disconcerting for a normal midweek service ...
Might be unusual on your line ...
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
Witham Bobby
|
|
« Reply #212 on: October 28, 2019, 14:19:34 » |
|
15:50 London Paddington to Moreton-In-Marsh due 17:26 15:50 London Paddington to Moreton-in-Marsh due 17:26 will be cancelled. This is due to a shortage of train crew. Last Updated:28/10/2019 14:09 17:38 Moreton-In-Marsh to London Paddington due 19:06 17:38 Moreton-in-Marsh to London Paddington due 19:06 will be cancelled. This is due to a shortage of train crew. Last Updated:28/10/2019 14:10
|
|
|
Logged
|
|
|
|
Witham Bobby
|
|
« Reply #213 on: October 29, 2019, 09:54:14 » |
|
06:42 Hereford to London Paddington due 09:47 06:42 Hereford to London Paddington due 09:47 will be started from Worcester Shrub Hill. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street. This is due to a landslip. Further Information
Last Updated:29/10/2019 06:10 Does the stock for this working usually travel to Hereford via The Severn Tunnel and Abergavenny? The blockade on The Marches Line will be operative for at least a week, I heard on't wireless.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #214 on: October 29, 2019, 17:46:43 » |
|
Haven't had a chance to look at the full effects of this though it did put a massive hole in the afternoon schedule: Cancellations to services between Oxford and Moreton-In-Marsh
Following a broken down train between Oxford and Moreton-in-Marsh all lines have now reopened.
Train services running through these stations are returning to normal but some services may still be cancelled, delayed by up to 45 minutes or revised. Disruption is expected until 20:00 29/10. Seems to have been the 13:22 Paddington to Worcester Shrub Hill which broke down between Wolvercote Junction and Charlbury. Realtime Trains says it eventually arrived at Charlbury 136 late before being returned to Oxford. The 14:21 Paddington to Worcester Foregate Street was terminated at Oxford. The 15:22 Paddington to Great Malvern left Oxford 71 late and is now terminating at WOS» . And the 15:50 Paddington to Moreton-in-Marsh was cancelled throughout (for the second day running).
|
|
« Last Edit: October 29, 2019, 18:03:21 by charles_uk »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #215 on: October 30, 2019, 07:09:07 » |
|
Yesterday (Tuesday October 29) seems to have been a very bad day all over, with lots of failures across the network.
The Cotswold Line suffered a train failure in the single track between Oxford and Charlbury. For the record, the full list of consequences:
12:22 Paddington - Shrub Hill : operated normally 13:22 Paddington - Shrub Hill : cancelled after Charlbury. RTT» reports left Charlbury towards Oxford 136 late. 14:21 Paddington - Foregate St : waited 24 at Didcot (deciding whether to run via Stroud?). Eventually sent to Oxford and cancelled there, 28 late. 15:22 Paddington - Great Malvern : also waited at Didcot. To Oxford (arr 55 late, dep 72 late), cancelled after Shrub Hill. 15:50 Paddington - Moreton : cancelled throughout. 16:22 Paddington - Great Malvern : Oxford arr 16 late, dep 20 late. Arr Foregate St 5 late. Cancelled thereafter. 17:22 Paddington - Hereford : ran normally
12:09 Hereford - Paddington : operated normally 13:58 Foregate St - Paddington : 112 late on departure from Charlbury, 121 late at Paddington 15:22 Shrub Hill - Paddington : ran via Stroud. Arr Paddington 11 late. 15:52 Shrub Hill - Paddington : cancelled throughout 15:14 Hereford - Paddington : ran via Evesham. 25 late away from Evesham, 15 late away fom Oxford, 15 late into Paddington. 17:38 Moreton - Paddington : cancelled throughout. 17:26 Foregate St - Paddington : cancelled throughout. 18:29 Great Malvern - Paddington : Started from Shrub Hill.
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #216 on: October 30, 2019, 07:18:46 » |
|
06:42 Hereford to London Paddington due 09:47 06:42 Hereford to London Paddington due 09:47 will be started from Worcester Shrub Hill.
Does the stock for this working usually travel to Hereford via The Severn Tunnel and Abergavenny? The blockade on The Marches Line will be operative for at least a week, I heard on't wireless. Looks like it - same again today 06:42 Hereford to London Paddington due 09:47 06:42 Hereford to London Paddington due 09:47 will be started from Worcester Shrub Hill. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street. This is due to a landslip. Can't it go in t'other way?
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
IndustryInsider
|
|
« Reply #217 on: October 30, 2019, 07:52:50 » |
|
The Cotswold Line suffered a train failure in the single track between Oxford and Charlbury.
Due to something on the track damaging an air pipe.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
Witham Bobby
|
|
« Reply #218 on: October 30, 2019, 10:48:45 » |
|
06:42 Hereford to London Paddington due 09:47 06:42 Hereford to London Paddington due 09:47 will be started from Worcester Shrub Hill. It will no longer call at Hereford, Ledbury, Colwall, Great Malvern, Malvern Link and Worcester Foregate Street. This is due to a landslip. Can't it go in t'other way? I wondered that. I guess there are no paths for an additional down ECS▸ working between Worcester Shrub Hill and Hereford at that time of day. The long single line sections have a severely limiting affect on capacity.
|
|
|
Logged
|
|
|
|
rogerw
|
|
« Reply #219 on: October 30, 2019, 16:13:37 » |
|
May also be down to signal box opening hours
|
|
|
Logged
|
I like to travel. It lets me feel I'm getting somewhere.
|
|
|
Worcester_Passenger
|
|
« Reply #220 on: October 30, 2019, 19:24:27 » |
|
In normal times, there are three GWR▸ trains that start at Hereford in the morning:
the 04:47 to Paddington spends the night at Hereford; the 05:28 starts as ECS▸ from Stoke Gifford (at 03:30); and the 06:42 starts as ECS from Stoke Gifford (at 04:43).
For this week, the first two are both spending the night at Hereford.
The third one is still setting off from Stoke Gifford at 04:43, but probably can't get to Hereford via Worcester and Malvern in time to depart at 06:42. As it is, it's spending 1:20 waiting time in Eckington loop, between Cheltenham and Worcester.
Attached is a quick version of the track occupation diagram early in the morning. The green lines are the GWR trains; the red ones are WMR. The dashed green line is the 06:42 HFD» -PAD» . It looks as if it could get to Hereford by an early path crossing the 05:28 HFD-PAD at Ledbury - but it would have to leave Stoke Gifford earlier in order to do that.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #221 on: October 31, 2019, 12:36:08 » |
|
11:20 London Paddington to Worcester Foregate Street due 13:44 was terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham, Moreton-in-Marsh, Honeybourne, Evesham, Pershore, Worcester Shrub Hill and Worcester Foregate Street. This is due to a shortage of train crew. Last Updated:31/10/2019 12:23
13:58 Worcester Foregate Street to London Paddington due 16:27 will be started from Oxford. It will no longer call at Worcester Foregate Street, Worcester Shrub Hill, Pershore, Evesham, Honeybourne, Moreton-in-Marsh, Kingham, Charlbury and Hanborough. This is due to a shortage of train crew. Looking at the last updated timing, seems it might have been a very late call. And (almost immediate change) maybe GWR▸ are sorting something out: 11:20 London Paddington to Worcester Foregate Street due 13:44 will be terminated at Worcester Shrub Hill. It will no longer call at Worcester Foregate Street. It is being delayed at Oxford. This is due to a shortage of train crew. Last Updated:31/10/2019 12:35
|
|
|
Logged
|
|
|
|
Witham Bobby
|
|
« Reply #222 on: October 31, 2019, 13:27:11 » |
|
11:57 Worcester Foregate Street to London Paddington due 14:27 11:57 Worcester Foregate Street to London Paddington due 14:27 will be reinstated. This is due to a fault on this train. Will be formed of 5 coaches instead of 10. Last Updated:31/10/2019 09:20
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #223 on: October 31, 2019, 16:06:12 » |
|
Just breaking: 15:50 London Paddington to Moreton-in-Marsh due 17:26 has been cancelled. This is due to a fault on this train. Last Updated:31/10/2019 15:57
|
|
|
Logged
|
|
|
|
Witham Bobby
|
|
« Reply #224 on: November 01, 2019, 14:57:00 » |
|
18:22 London Paddington to Hereford due 21:34 18:22 London Paddington to Hereford due 21:34 will be terminated at Worcester Shrub Hill. It will no longer call at Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford. This is due to a shortage of train crew. Last Updated:01/11/2019 12:55
|
|
|