Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 22:15 28 Apr 2025
 
- Shuttered shops and unfinished haircuts - how a day without power unfolded
- Watch: Man attempts to direct traffic as lights fail
- Flights grounded and trains cancelled
- Flights cancelled in Portugal and Spain due to power cut
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railway Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
28th Apr (1996)
GNER franchise (Sea Containers) starts on ECML (*)

Train RunningCancelled
19:35 Exeter St Davids to London Paddington
22:11 Salisbury to Bristol Temple Meads
22:30 London Paddington to Bristol Temple Meads
Short Run
17:03 London Paddington to Penzance
18:03 London Paddington to Penzance
20:24 Portsmouth Harbour to Cardiff Central
20:54 Exmouth to Barnstaple
21:26 Exmouth to Paignton
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 28, 2025, 22:23:19 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[349] Chiltern Railways: an update on rolling stock / services
[55] Driving licences and tests - ongoing discussion, merged topics
[41] Station Jim’s whereabouts
[38] Thames Valley infrastructure problems causing disruption elsew...
[34] North Cotswold line - driver route knowledge
[26] Stop orders as cover for cancelled services
 
News: the Great Western Coffee Shop ... keeping you up to date with travel around the South West
 
   Home   Help Search Calendar Login Register  
Pages: [1]
  Print  
Author Topic: Westbury Works, Xmas 2018  (Read 5515 times)
DaveHarries
Sr. Member
****
Posts: 261



View Profile
« on: May 12, 2018, 00:51:33 »

Hi all.

Looking well ahead I see from the GWR (Great Western Railway) list of engineering works that there are to be works in the Westbury area between 22-Dec-2018 and 01-Jan-2019. The works will involve "major track layout changes".

I realise it is probably too early to ask but any ideas what is necessitating these works?

Dave
Logged
Timmer
Global Moderator
Hero Member
*****
Posts: 6619


View Profile
« Reply #1 on: May 12, 2018, 07:06:05 »

I don’t know anything specific Dave but I think the last time Westbury track layout was modified was in either 1983 or 84.

One observation I have made is trains approach the station very slowly, particularly eastbound on platform 3.

Graham may know a little more about the forthcoming work as it will affect Transwilts services over the Christmas New Year period.

I almost post about this and the work taking place between Reading and London and Bristol and Newport over the Christmas/New Year period the other day when I saw GWR (Great Western Railway) had listed these on the Engineering works page of their website.

A lot of work going on over this time. Strange to be thinking of Christmas in May, but the speed this year is going it will soon be here. Let’s hope we have a decent summer between now and then.
Logged
stuving
Transport Scholar
Hero Member
******
Posts: 7427


View Profile
« Reply #2 on: May 12, 2018, 10:10:59 »

The EAS» (Engineering Access Statement - about) says something about the work, but as usual not a lot:
Quote
12 DAY BLOCKADE. GWR (Great Western Railway) SERVICES BETWEEN
LONDON AND THE WEST OF ENGLAND TO RUN
VIA WESTBURY AVOIDERS. GWR AND SWR» (South Western Railway - about)
SERVICES TO TERMINATE AT / START FROM
WARMINSTER AND TROWBRIDGE. GWR
SERVICES BETWEEN BRISTOL AND WEYMOUTH
TO REVERSE AT HEWYWOOD ROAD JCN (Junction).

FREIGHT SERVICES TO / FROM SOMERSET
QUARRIES TO RUN VIA WESTBURY AVOIDER. NO
ACCESS TO / FROM ANY SIDINGS / STABLING /
LOCO FACILITIES AT WESTBURY. NO ACCESS TO
/ FROM LDC AT WESTBURY EXCEPT FOR TRAINS
REQUIRED FOR THIS POSSESSION.

WORK = WESTBURY NORTH S+C RENEWAL AND
IEP (Intercity Express Program / Project. This will offer more capacity on routes, save money, give a consistent and safe service and meet customer requirements. Intended to replace HSTs.) SIGNALLING WORKS WESTBURY STATION.

SPECIAL WORKING INSTRUCTIONS REQUIRED
FOR REVERSALS AT WARMINSTER AND
HEYWOOD ROAD JCN (gpl 732 SIGNAL).

"Renewal" doesn't sound like a change at all, but I think it's used to cover any replacement, not just like for like. But I don't think it extends to new tracks or platforms.

And as to "IEP signalling works" ... ?
Incidentally, that 12-day blockade runs 23/12/18 to 4/1/19, not just to the 1st. (EAS version from March.)
« Last Edit: May 12, 2018, 11:06:42 by stuving » Logged
JayMac
Data Manager
Hero Member
******
Posts: 19309



View Profile
« Reply #3 on: May 12, 2018, 10:42:31 »

And as to "IEP (Intercity Express Program / Project. This will offer more capacity on routes, save money, give a consistent and safe service and meet customer requirements. Intended to replace HSTs.) signalling works" ... ?
Incidentally, that 12-day blockade runs 23/12/18 to 4/1/19, not just to the 1st. (EAS» (Engineering Access Statement - about) version from March.)

Moving of signals to allow full platforming of 2x5 and 9 car Class 802s perhaps. Currently P3 up direction at Westbury has a signal that, if on red, prevents 2+8 HSTs (High Speed Train (Inter City class 43 125 units)) from fully platforming. Moving this signal may also necessitate the remodelling of the crossovers from the Up Reception and Back Road sidings.
Logged

"Good news for regular users of Euston Station in London! One day they will die. Then they won't have to go to Euston Station ever again." - David Mitchell
bradshaw
Transport Scholar
Hero Member
******
Posts: 1577



View Profile
« Reply #4 on: May 12, 2018, 15:02:56 »

 More details

W2018/5962122
 C70 S&C (Settle and Carlisle - a local rail line, or Switch and Crossings - a railway signalling term, depending on context) - Complete Renewal 113A
 95m11ch and 110m55ch
W2018/5964150
URFDO Inspections 109m52ch and 109m77ch
   
 
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #5 on: May 12, 2018, 19:29:47 »

More details

W2018/5962122
 C70 S&C (Settle and Carlisle - a local rail line, or Switch and Crossings - a railway signalling term, depending on context) - Complete Renewal 113A
 95m11ch and 110m55ch
W2018/5964150
URFDO Inspections 109m52ch and 109m77ch

Can anyone translate?
Logged
bradshaw
Transport Scholar
Hero Member
******
Posts: 1577



View Profile
« Reply #6 on: May 12, 2018, 20:14:39 »

As far as I can understand. Renewing switch 113a, I have tried to find a shot of the panel to see which one that is. The 95m 11ch to 110m 55ch is from the east of the panel box to just before Fairwood Jct, about a mile in length. The former is on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) route and the latter on the original WS&W route, representing a change of mileage
URFDO is Ultrasonic rail testing between distances given, the 20ch from Westbury N Jct.
I would imagine that renewal and relocation of said switch and associated signalling along with platform extenstion(s).
Logged
SandTEngineer
Hero Member
*****
Posts: 3485


View Profile
« Reply #7 on: May 12, 2018, 20:20:11 »

It means complete North Junction layout renewal in 113A rail section (which is the usual flat bottom heavy duty stuff at 113lbs/yard).

As it happens, I passed through Westbury earlier today (12/05/2018) and there is already a TSR (Temporary Speed Restriction) over the station junction (think it was 40mph, but only got a very quick glimpse).  I suspect its reached the end of its life after being hammered to pieces by all of those heavy stone trains since 1985.

Edit to Add: For those that want a little bedtime reading try reading pages 16 to 21 of this:
https://www.thepwi.org/member/network_rail_track_delivery_update__steve_featherstone/nr_track_delivery_update_28_may_2014/pway_design_guide_2011

« Last Edit: May 13, 2018, 10:47:17 by SandTEngineer » Logged
DaveHarries
Sr. Member
****
Posts: 261



View Profile
« Reply #8 on: May 13, 2018, 01:56:00 »

As far as I can understand. Renewing switch 113a, I have tried to find a shot of the panel to see which one that is. The 95m 11ch to 110m 55ch is from the east of the panel box to just before Fairwood Jct, about a mile in length. The former is on the B&H (Berks and Hants - railway line from Reading to Taunton via Westbury) route and the latter on the original WS&W route, representing a change of mileage
URFDO is Ultrasonic rail testing between distances given, the 20ch from Westbury N Jct.
I would imagine that renewal and relocation of said switch and associated signalling along with platform extenstion(s).
I wouldn't know what would be meant by "switch" 113A. Plenty of photos of the panel in this link: might there be a photo here?
http://photos.signalling.org/index?/category/347-signal_box

Dave
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #9 on: May 13, 2018, 08:27:58 »

I wouldn't know what would be meant by "switch" 113A. Plenty of photos of the panel in this link: might there be a photo here?
http://photos.signalling.org/index?/category/347-signal_box

The reference and link provided by SandTEngineer explains very well
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: [1]
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page