Train GraphicClick on the map to explore geographics
 
I need help
FAQ
Emergency
About .
Travel & transport from BBC stories as at 19:55 19 Apr 2025
 
- Race Across the World winner on 'authentic travel' and how to do it
Read about the forum [here].
Register [here] - it's free.
What do I gain from registering? [here]
 10/05/25 - BRTA Westbury
10/05/25 - Model Railsay Show, Calne
13/05/25 - Melksham TUG / AGM
14/05/25 - West Wiltshire RUG

On this day
19th Apr (1938)
Foundation, Beatties of London (link)

Train RunningCancelled
20:45 Bristol Temple Meads to Weymouth
21:23 Portsmouth Harbour to Westbury
21:32 Cheltenham Spa to Swindon
22:39 Swindon to Gloucester
Short Run
15:00 Cardiff Central to Penzance
17:27 Cardiff Central to Portsmouth Harbour
18:12 Salisbury to Cheltenham Spa
18:27 Cardiff Central to Portsmouth Harbour
18:52 Worcester Foregate Street to Bristol Temple Meads
PollsThere are no open or recent polls
Abbreviation pageAcronymns and abbreviations
Stn ComparatorStation Comparator
Rail newsNews Now - live rail news feed
Site Style 1 2 3 4
Next departures • Bristol Temple MeadsBath SpaChippenhamSwindonDidcot ParkwayReadingLondon PaddingtonMelksham
Exeter St DavidsTauntonWestburyTrowbridgeBristol ParkwayCardiff CentralOxfordCheltenham SpaBirmingham New Street
April 19, 2025, 20:05:08 *
Welcome, Guest. Please login or register.

Login with username, password and session length
Forgotten your username or password? - get a reminder
Most recently liked subjects
[122] FOSS and FOSW validity - some quirks
[120] St Erth station - facilities, footbridge, improvements, incide...
[92] Fifteen years of the Transwilts CRP
[80] Wiltshire Day Rover - new multi-operator bus ticket
[56] Annoying / amusing use of completely irrelevant stock photos t...
[49] Across the South West over Easter - trains in pictures
 
News: A forum for passengers ... with input from rail professionals welcomed too
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 17 18 [19] 20
  Print  
Author Topic: Trimode cl 769 to operate Reading to Oxford and Gatwick.  (Read 156513 times)
eightonedee
Transport Scholar
Hero Member
******
Posts: 1798



View Profile
« Reply #270 on: December 17, 2022, 17:27:34 »

I might be mistaken, but aren't the Electrostars GWR (Great Western Railway) already bi-modal? I think they have those pick-up bars on their bogies that look like they are ready for 3rd rail use.
Logged
paul7575
Transport Scholar
Hero Member
******
Posts: 5346


View Profile
« Reply #271 on: December 17, 2022, 17:47:39 »

I might be mistaken, but aren't the Electrostars GWR (Great Western Railway) already bi-modal? I think they have those pick-up bars on their bogies that look like they are ready for 3rd rail use.
They are definitely “dual voltage”, and IIRC ('if I recall/remember/read correctly') were tested on DC (Direct Current) during acceptance.

But then again that capability wasn’t usually described as “bi-mode” until very recently.   

Paul
Logged
Electric train
Transport Scholar
Hero Member
******
Posts: 4531


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #272 on: December 17, 2022, 17:58:06 »

I might be mistaken, but aren't the Electrostars GWR (Great Western Railway) already bi-modal? I think they have those pick-up bars on their bogies that look like they are ready for 3rd rail use.

387 "Electrostars" are dual Voltage not bi-mode.  Bi-mode is 2 different energy forms.

I cannot see electrification of the North Downs line happening in the next 2 or 3 Control Periods (10 to 15 years), it could be argued that the 769 offered the best chance of third rail in-fill schemes.

There is still the problem of the AC/DC (Direct Current) traction power interface at Reading, there is no simple or cheap way to do it and it has to be done due to some simple principles that 25kV AC is and Earthed Traction Return ie the Neutral at the supply transformer is bonded to Earth, where as the Third Rail DC Traction Return ie the negative is not directly bonded to Earth; this is to reduce stray DC return currents using alternative Earth paths back to the rectifier and causing Cathodic erosion of metal in that Earth path (Utilities, building and structure foundations etc even ones outside the railway will get effected)
The AC / DC interface is basically a Galvanic isolator between the 2 systems, they require a piece of line in each direction of travel (or 4 for 4 track railway) 1 carriage longer than the longest train (irrespective of them being electric, diesel, steam or clockwork) they involve a lot of electrical equipment .................... not cheap or simple  
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
JayMac
Data Manager
Hero Member
******
Posts: 19304



View Profile
« Reply #273 on: December 17, 2022, 23:54:51 »

Imagine what could've been done across the network if £100bn wasn't being spaffed on the vanity project carving its way through the Chilterns.

Yeah, I know. Capex v opex. National infrastructure v local. Shiny superfast inter city trains v needed run of the mill local/regional stock. Buying votes v doing the right thing...
Logged

"Good news for regular users of Euston Station in London! One day they will die. Then they won't have to go to Euston Station ever again." - David Mitchell
TonyK
Global Moderator
Hero Member
*****
Posts: 6642


The artist formerly known as Four Track, Now!


View Profile
« Reply #274 on: December 18, 2022, 22:52:48 »

Imagine what could've been done across the network if £100bn wasn't being spaffed on the vanity project carving its way through the Chilterns.

Yeah, I know. Capex v opex. National infrastructure v local. Shiny superfast inter city trains v needed run of the mill local/regional stock. Buying votes v doing the right thing...

They could have borrowed £100 billion at cheap government rates to upgrade the existing services? Doubt it somehow. That start-up money was borrowed and spent nearly 200 years ago. Pretty much everything on the existing network is supposed to be running costs and planned replacement of stock and infrastructure within a certain timescale. We don't do it that way here, preferring the last-minute refurb of time-expired stock and a few running repairs on the PW (Permanent Way - the railway track).
Logged

Now, please!
Electric train
Transport Scholar
Hero Member
******
Posts: 4531


The future is 25000 Volts AC 750V DC has its place


View Profile
« Reply #275 on: December 20, 2022, 12:42:12 »

Imagine what could've been done across the network if £100bn wasn't being spaffed on the vanity project carving its way through the Chilterns.

Yeah, I know. Capex v opex. National infrastructure v local. Shiny superfast inter city trains v needed run of the mill local/regional stock. Buying votes v doing the right thing...

I would not say HS2 (The next High Speed line(s)) is a vanity project the WCML (West Coast Main Line) 1955 modernisation plan (which did not finish until 1974) cost £345 million, that's about £11 Billion today; in the 1990's  a further £14 billon (that's £37 Billion today) the 1990's upgrade was not completed because of the difficulties of completing the Southern end in to London and rising costs

So over nearly half a centaury close on c £47 Billion was spent on the WCML with only marginal increase in speed and capacity.  HS2 will give the extra capacity on the WCML especially for freight

Its likely the signalling system North of Crewe will be ETCS (European Train Control System) ie in cab signalling to take advantage of HS2 for faster journeys to Scotland.

The bit the UK (United Kingdom) Governments have never been any good at is real stratgigic transport planning all MP (Member of Parliament, or Mile Post - a method of measuring the railway in miles and chains from a starting point - usually London, depending on context)'s can only see as far as 5 years
Logged

Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #276 on: December 20, 2022, 13:50:03 »

The bit the UK (United Kingdom) Governments have never been any good at is real stratgigic transport planning all MP (Member of Parliament, or Mile Post - a method of measuring the railway in miles and chains from a starting point - usually London, depending on context)'s can only see as far as 5 years

Or the next election whichever is the sooner.  Therefore at the moment no more than 2 years!
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2139


Hockley viaduct


View Profile
« Reply #277 on: December 21, 2022, 06:52:07 »

Unfortunately not only transport. Public Health has the same problem as it normally takes 10 - 15 years to see the benefits.
Logged
ellendune
Transport Scholar
Hero Member
******
Posts: 4524


View Profile
« Reply #278 on: December 21, 2022, 09:29:39 »

In transport as in health, anything with a longer timescale needs to be a visible 'legacy' so maintaining railways, roads, bridges, hospitals or schools is low priority, but a new railway, road, bridge, hospital (or 40) or school is good. Especially if the next government will end up footing the bill. 

The result is crumbling infrastructure - literally!  Only this week it has been reported that the Dept for Education has increased the risk of schools collapsing on its risk register.  This is not only dangerous, but also bad economics.  How much of Network Rail's back costs are due to lack of maintenance during the BR (British Rail(ways)) era? 

The USA has been going this way for many years which is perhaps why bridge collapses are in the news there. 

Sorry I have pulled this thread even further off course!
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2139


Hockley viaduct


View Profile
« Reply #279 on: June 05, 2023, 13:17:21 »

Today's mystery?

Two low loaders heading south in Reading towards J11 of M4 at about midday.

A railway carriage loaded on each, all I managed to get was a carriage number: 71868

The end of a sorry saga?
Logged
bobm
Administrator
Hero Member
*****
Posts: 10234



View Profile
« Reply #280 on: June 05, 2023, 16:33:27 »

According to this list that coach is part of 769 949.
Logged
bobm
Administrator
Hero Member
*****
Posts: 10234



View Profile
« Reply #281 on: June 06, 2023, 09:20:08 »

If you want the chance to ride aboard one there is a shuttle between a specially built platform at Honeybourne and the Rail Live show at Long Marston show on the 21st and 22nd June. 

It is being advertised as a "Porterbrook's GWR769 Free Shuttle".
Logged
CyclingSid
Data Manager
Hero Member
******
Posts: 2139


Hockley viaduct


View Profile
« Reply #282 on: June 06, 2023, 10:58:07 »

As I came by Cow Lane depot earlier there were two coaches loaded up ready to go.

"Porterbrook's GWR769 Free Shuttle", how many units will they need to ensure the service performs all day?
Logged
bobm
Administrator
Hero Member
*****
Posts: 10234



View Profile
« Reply #283 on: June 06, 2023, 11:09:07 »

Looking at the timetable on Twitter it appears to be one unit shuttling up and down. 

Weren't there some parked up in the the sidings at Oxford?
Logged
eightonedee
Transport Scholar
Hero Member
******
Posts: 1798



View Profile
« Reply #284 on: June 06, 2023, 22:42:30 »

Also saw two units this morning as I passed Reading depot this morning, but as one was partly in one of the sheds, the other hidden behind the Sleeper stock, I couldn't see if they were complete.

Is it odd that they are being moved by road?

Does anyone know what will happen to them? Storage or scrap? Anyone want some MAN diesel engines and ABB generators, hardly used? If so, please contact Porterbrook Leasing, no reasonable offers refused!

Also available from Network Rail - a quantity of signage about switching to diesel power, good condition. Grin
Logged
Do you have something you would like to add to this thread, or would you like to raise a new question at the Coffee Shop? Please [register] (it is free) if you have not done so before, or login (at the top of this page) if you already have an account - we would love to read what you have to say!

You can find out more about how this forum works [here] - that will link you to a copy of the forum agreement that you can read before you join, and tell you very much more about how we operate. We are an independent forum, provided and run by customers of Great Western Railway, for customers of Great Western Railway and we welcome railway professionals as members too, in either a personal or official capacity. Views expressed in posts are not necessarily the views of the operators of the forum.

As well as posting messages onto existing threads, and starting new subjects, members can communicate with each other through personal messages if they wish. And once members have made a certain number of posts, they will automatically be admitted to the "frequent posters club", where subjects not-for-public-domain are discussed; anything from the occasional rant to meetups we may be having ...

 
Pages: 1 ... 17 18 [19] 20
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.2 | SMF © 2006-2007, Simple Machines LLC Valid XHTML 1.0! Valid CSS!
This forum is provided by customers of Great Western Railway (formerly First Great Western), and the views expressed are those of the individual posters concerned. Visit www.gwr.com for the official Great Western Railway website. Please contact the administrators of this site if you feel that the content provided by one of our posters contravenes our posting rules via admin@railcustomer.info. Full legal statement (here).

Jump to top of pageJump to Forum Home Page