ChrisB
|
|
« Reply #585 on: July 06, 2018, 10:17:50 » |
|
I have to report that yesterday's 1622 ran absolutely bang to time as far as MIM, and possibly further.
|
|
|
Logged
|
|
|
|
JayMac
|
|
« Reply #586 on: July 06, 2018, 14:52:25 » |
|
Or possibly not. 18 late into Worcester Shrub Hill and beyond.
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
ChrisB
|
|
« Reply #587 on: July 06, 2018, 15:00:32 » |
|
That explains its late inward departure from GMV, which was my return from MIM. Still early into Oxford though.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #588 on: July 06, 2018, 17:36:07 » |
|
17:52 London Paddington to Worcester Shrub Hill due 20:06 will be cancelled. This is due to a shortage of train crew. Last Updated:06/07/2018 17:12
20:59 Worcester Foregate Street to London Paddington due 23:30 will be cancelled. This is due to a shortage of train crew. Last Updated:06/07/2018 17:12
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #589 on: July 11, 2018, 18:36:37 » |
|
By amazing co-incidence, my season ticket expired on 6 July so I'm driving to my local Park & Ride and enjoying the walk in. Certainly quicker and more efficient than the bus replacement but it won't replace the trains once they're back. Meanwhile, on the Cotswold Line: 17:26 Worcester Foregate Street to Hanborough due 18:50 will be cancelled. This is due to a fault on this train. and: 19:34 Hanborough to Hereford due 21:32 will be cancelled. This is due to a fault on this train. as well as a couple of inconveniences: Facilities on the 17:50 Hanborough to Great Malvern due 19:22. Toilet facilities are not available.
Facilities on the 19:43 Great Malvern to Hanborough due 21:15. Toilet facilities are not available.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #590 on: July 17, 2018, 14:18:30 » |
|
How it seems to be working at Hanborough is that buses turn up from Oxford, Oxford Parkway & Didcot Parkway at about twenty past the hour to decant passengers for the Worcester/Hereford bound service at half past the hour, and to carry forward passengers from the service that terminates at about quarter past the hour. So around now, three buses have arrived at Hanborough to fit in with the 12:59 WOS» :HND and 14:30 HND:WOS... 12:59 Worcester Shrub Hill to Hanborough due 14:15 will be cancelled. This is due to this train being late from the depot.
14:30 Hanborough to Worcester Shrub Hill due 15:32 will be cancelled. This is due to this train being late from the depot.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #591 on: July 20, 2018, 05:45:50 » |
|
Getting to the end of the Oxford blockade. Today JourneyCheck has an 'other' entry that may be the shortest replacement possible: 05:11 Worcester Shrub Hill to Hanborough due 06:13 will be cancelled. This is due to a shortage of train crew.
07:02 Hanborough to Worcester Foregate Street due 08:15 will be started from Worcester Shrub Hill. ... This is due to a shortage of train crew.
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #592 on: July 20, 2018, 05:57:46 » |
|
Getting to the end of the Oxford blockade. Today JourneyCheck has an 'other' entry that may be the shortest replacement possible: 05:11 Worcester Shrub Hill to Hanborough due 06:13 will be cancelled. This is due to a shortage of train crew.
07:02 Hanborough to Worcester Foregate Street due 08:15 will be started from Worcester Shrub Hill. ... This is due to a shortage of train crew. It's in the same league as Hove to Brighton and Portsmouth and Southsea to Portsmouth Harbour
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
Worcester_Passenger
|
|
« Reply #593 on: July 20, 2018, 12:36:39 » |
|
And another one: 22:36 Worcester Foregate Street to Moreton-in-Marsh due 23:20 will be reinstated. It will be terminated at Worcester Shrub Hill. This is due to a shortage of train crew.
23:59 Moreton-in-Marsh to Worcester Shrub Hill due 00:35 will be cancelled. This is due to a shortage of train crew.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #594 on: July 23, 2018, 17:14:10 » |
|
I know freshly laid track and hot temperatures are not a good mix, but there is a certain predictability about this one: 15:50 London Paddington to Moreton-in-Marsh due 17:26 was terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham and Moreton-in-Marsh. This is due to a speed restriction because of high track temperatures.
Last Updated:23/07/2018 16:52 with the return run also affected.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #595 on: July 24, 2018, 02:04:43 » |
|
A few journeys were very late, but that tends not to be reported fully on JourneyCheck.
OTT▸ is reporting
17:22 Paddington - Hereford is shown as being 71 late 17:52 Paddington - Shrub Hill 44 late 15:22 Shrub Hill - Paddington 42 late 15:51 Foregate St - Padd'n also 42 late 15:14 Hereford - Padd'n 85 late
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #596 on: July 25, 2018, 12:09:31 » |
|
And today the signalling system has failed, probably between Evesham and Norton Junction, though JourneyCheck is a bit confused: Cancellations to services between Cheltenham Spa and Worcester Shrub Hill Due to a fault with the signalling system between Evesham and Great Malvern all lines are blocked. Disruption is expected until 12:00 25/07. Train services between Cheltenham Spa and Worcester Shrub Hill may be cancelled, delayed or revised. Further Information An update will follow within the next 2 hours. Last Updated:25/07/2018 11:10 Considerable impact on train services: 08:21 London Paddington to Hereford due 11:40 will be terminated at Evesham. This is due to a fault with the signalling system. Last Updated:25/07/2018 09:48
08:23 Southampton Central to Great Malvern due 12:30 will be terminated at Cheltenham Spa. This is due to a fault with the signalling system. Will be formed of 2 coaches instead of 3. Toilet facilities are not available. Last Updated:25/07/2018 11:37
09:54 Great Malvern to London Paddington due 12:28 will be reinstated. It will be started from Evesham. This is due to a fault with the signalling system. Last Updated:25/07/2018 09:44
10:22 London Paddington to Hereford due 13:47 will be terminated at Evesham. This is due to a fault with the signalling system. Last Updated:25/07/2018 11:45
10:48 Great Malvern to Brighton due 16:14 will be started from Cheltenham Spa. This is due to a fault with the signalling system. Last Updated:25/07/2018 09:33
10:59 Great Malvern to London Paddington due 13:29 will be started from Oxford. This is due to a fault with the signalling system. Last Updated:25/07/2018 08:44
11:20 London Paddington to Worcester Foregate Street due 13:44 will be terminated at Oxford. This is due to a fault with the signalling system. Last Updated:25/07/2018 11:40
12:09 Hereford to London Paddington due 15:27 will be reinstated. It will be started from Evesham. This is due to a fault with the signalling system. Last Updated:25/07/2018 11:45
12:51 Great Malvern to Weymouth due 17:10 will be started from Cheltenham Spa. This is due to a fault with the signalling system. Will be formed of 2 coaches instead of 3 to Bristol Temple Meads. Toilet facilities are not available. Last Updated:25/07/2018 11:37
13:55 Worcester Foregate Street to London Paddington due 16:31 will be started from Oxford. This is due to a fault with the signalling system. Last Updated:25/07/2018 11:40
No mention on JourneyCheck of alternative arrangements (like tickets being valid via Birmingham). Last train towards Oxford from Shrub Hill was the 07:37. First one currently shown as not cancelled is the 15:22.
|
|
|
Logged
|
|
|
|
bobm
|
|
« Reply #597 on: July 25, 2018, 13:08:33 » |
|
Repairs have been effected. Should see some train movements shortly and possibly reinstatements.
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #598 on: July 25, 2018, 20:28:28 » |
|
17:22 London Paddington to Hereford due 20:26 will be terminated at Oxford. It will no longer call at Hanborough, Charlbury, Kingham, Moreton-in-Marsh, Honeybourne, Evesham, Pershore, Worcester Shrub Hill, Worcester Foregate Street, Malvern Link, Great Malvern, Colwall, Ledbury and Hereford. This is due to a problem currently under investigation. And the 17:52 Paddington to Worcester Shrub Hill and 18:22 Paddington to Hereford both appear to have been delayed to soe degree beyond Oxford.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #599 on: July 31, 2018, 05:27:36 » |
|
05:12 London Paddington to Moreton-in-Marsh due 06:45 will be cancelled. This is due to a shortage of train crew. Last Updated:31/07/2018 05:00
07:10 Moreton-in-Marsh to London Paddington due 08:56 will be cancelled. This is due to a shortage of train crew. Last Updated:31/07/2018 05:00
|
|
|
Logged
|
|
|
|
|