Worcester_Passenger
|
|
« Reply #105 on: January 25, 2018, 18:48:43 » |
|
But they weren't very good coaches: 19:42 Great Malvern to London Paddington due 22:31 will be cancelled. This is due to a fault on this train. Further Information Customers between Great Malvern and Worcester Foregate Street are advised to travel on the next London Midland service to Worcester Shrub Hill. Last Updated:25/01/2018 17:04
|
|
|
Logged
|
|
|
|
JayMac
|
|
« Reply #106 on: January 25, 2018, 21:13:50 » |
|
But they weren't very good coaches: 19:42 Great Malvern to London Paddington due 22:31 will be cancelled. This is due to a fault on this train. Further Information Customers between Great Malvern and Worcester Foregate Street are advised to travel on the next London Midland service to Worcester Shrub Hill. Last Updated:25/01/2018 17:04 There'd be quite a wait for the next 'London Midland' service too. At least until refranchising, and only then if the name was resurrected. Has nobody told GWR▸ that the lead operator in that area is now West Midlands Trains?
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
TaplowGreen
|
|
« Reply #107 on: January 27, 2018, 07:28:36 » |
|
......will customers please Cross their legs.....
12:13 Hereford to London Paddington due 15:26 Facilities on the 12:13 Hereford to London Paddington due 15:26. This is due to a shortage of train crew. Will be formed of 3 coaches instead of 8. First class reduced. Catering is not available. Toilet facilities are not available.
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #108 on: January 27, 2018, 08:41:07 » |
|
But we must record the most welcome fact that yesterday, Friday January 26, everything operated - no cancellations or short workings, for the first time this year.
|
|
« Last Edit: January 29, 2018, 10:29:04 by Worcester_Passenger »
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #109 on: January 27, 2018, 08:50:10 » |
|
Alas, today is a different matter. In addition to toilet-less travel we have RTT» reporting 1P21 0554 Great Malvern to London Paddington This service was cancelled throughout due to an issue with the train crew (TH). JourneyCheck: 07:22 London Paddington to Great Malvern due 10:00 will be terminated at Oxford. This is due to a shortage of train crew. Last Updated:27/01/2018 05:45
08:22 London Paddington to Hereford due 11:40 will be terminated at Oxford. This is due to a shortage of train crew. Will be formed of 3 coaches instead of 8. First class reduced. Catering is not available. Toilet facilities are not available. Additional Information A rail replacement coach service will operate between Oxford and Worcester Shrub Hill.
10:43 Worcester Shrub Hill to Hereford due 11:40 An additional train service has been planned to operate as shown 10:43 Worcester Shrub Hill to Hereford due 11:40. Last Updated:27/01/2018 07:45
10:45 Great Malvern to London Paddington due 13:29 will be started from Oxford. This is due to a shortage of train crew. Last Updated:27/01/2018 05:47
Facilities on the 12:13 Hereford to London Paddington due 15:26. This is due to a shortage of train crew. Will be formed of 3 coaches instead of 8. First class reduced. Catering is not available. Toilet facilities are not available. Last Updated:27/01/2018 04:36
18:22 London Paddington to Hereford due 21:35 will be cancelled. This is due to a shortage of train drivers. Last Updated:27/01/2018 08:12
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #110 on: January 27, 2018, 08:53:27 » |
|
Shortage of train managers for most of that list. Pathetic. GWR▸ - Going Wrong Rapidly.
|
|
« Last Edit: January 27, 2018, 09:10:51 by IndustryInsider »
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
1st fan
|
|
« Reply #111 on: January 27, 2018, 22:57:54 » |
|
Shortage of train managers for most of that list. Pathetic. GWR▸ - Going Wrong Rapidly.
I sat on my case on a packed Turbo today until we reached Oxford at which point a seat became free. I had already worked out that it wouldn't be IET▸ or HST▸ through looking at RTT» . However what annoyed one of my fellow passengers was the sight of loads of IET at North Pole sitting idle. My own annoyance was that when I arrived at Moreton in Marsh there was a poster saying something like: Owing to electrification work trains may differ from the printed timetable on the weekends. Didn't see one of those in Paddington which would have been nice.
|
|
« Last Edit: January 27, 2018, 23:37:09 by 1st fan »
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #112 on: January 28, 2018, 09:11:51 » |
|
Cosy.............and the return trip too! (on the upside there may be a toilet on this one?)
12:42 London Paddington to Hereford due 16:01
Facilities on the 12:42 London Paddington to Hereford due 16:01. This is due to a shortage of train crew. Will be formed of 2 coaches instead of 8.
|
|
|
Logged
|
|
|
|
Witham Bobby
|
|
« Reply #113 on: January 29, 2018, 08:48:09 » |
|
JourneyCheck 29/01/2018 11:22 London Paddington to Worcester Foregate Street due 13:44 11:22 London Paddington to Worcester Foregate Street due 13:44 will be cancelled. This is due to a shortage of train crew.
13:55 Worcester Foregate Street to London Paddington due 16:27 13:55 Worcester Foregate Street to London Paddington due 16:27 will be cancelled. This is due to a shortage of train crew.
When was the last day on which the Cotswold's line service ran as advertised?
GWR▸ should give-up this route and let an operator who cares run it
|
|
|
Logged
|
|
|
|
grahame
|
|
« Reply #114 on: January 29, 2018, 10:17:00 » |
|
When was the last day on which the Cotswold's line service ran as advertised?
26th January, I think (looking up-thread) ... but I'm getting confused between various "yesterdays" and "today"s up there!
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
Worcester_Passenger
|
|
« Reply #115 on: January 29, 2018, 10:30:11 » |
|
Sorry - my fault with the date. But now corrected. And the correct answer is indeed Friday January 26.
|
|
|
Logged
|
|
|
|
TaplowGreen
|
|
« Reply #116 on: January 29, 2018, 10:39:33 » |
|
Sorry - my fault with the date. But now corrected. And the correct answer is indeed Friday January 26.
1 day out of 29 so far in 2018 where the line ran as advertised (just out of interest, how many short formations on the 26th?)
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #117 on: January 29, 2018, 10:44:38 » |
|
Sorry - my fault with the date. But now corrected. And the correct answer is indeed Friday January 26.
1 day out of 29 so far in 2018 where the line ran as advertised (just out of interest, how many short formations on the 26th?) Definitely the 07:10 Moreton-in-Marsh to Paddington which has now been a Turbo instead of an HST▸ for 11 days running (and, yes, I have mentioned it before!).
|
|
|
Logged
|
|
|
|
Worcester_Passenger
|
|
« Reply #118 on: January 29, 2018, 10:49:37 » |
|
We also need to document that 05:11 from Worcester Shrub Hill started 32 late, due to "Delays to train crew". 33 late at Paddington. 04:47 from Hereford ran late and ended up having to wait at Charlbury for the single line. 40 late at Paddington. 05:28 from Hereford also ran late. 23 late at Paddington. 06:53 Foregate Street - Didcot was only 12 late at Oxford but (according to RTT» ) took ages to get into Didcot, arriving 45 late. 07:50 Paddington - Great Malvern was cancelled between Worcester Shrub Hill and Great Malvern due to an issue with the train crew (TG). 10:59 Great Malvern to London Paddington due 13:29 will be started from Worcester Foregate Street. This is due to congestion. Further Information Passengers for onwards connection to Great Malvern should await the 10:49 GWR▸ departure from Worcester Shrub Hill for Hereford. Passengers wishing to travel from Great Malvern should await the West Midlands Railway service from Great Malvern at 11:10 to Worcester Foregate St and then change for the 12:00 GWR departure for London Paddington. Last Updated:29/01/2018 10:01
|
|
|
Logged
|
|
|
|
charles_uk
|
|
« Reply #119 on: January 29, 2018, 10:54:38 » |
|
We also need to document that
snip
And the 07:10 Moreton-in-Marsh to Paddington (I've not mentioned that one recently...), although only 8 minutes late at Wolvercote Junction, left Oxford 18 late and arrived at Paddington 27 minutes late.
|
|
|
Logged
|
|
|
|
|