|
ellendune
|
|
« Reply #1 on: December 30, 2017, 12:49:26 » |
|
What work is being carried out?
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #2 on: December 30, 2017, 14:39:49 » |
|
What work is being carried out?
Bristol Area resignalling - Stage 3 Bristol station area re-control to TVSC» .
|
|
|
Logged
|
|
|
|
GBM
|
|
« Reply #3 on: December 30, 2017, 16:10:21 » |
|
Bristol Area resignalling - Stage 3 Bristol station area re-control to TVSC» . [/quote]
All the way down to Brizzle? That's a long way for Swindon (?). Is that as far as is planned, or are they empire building and going 'way down West'? Curious as to how many centres are planned, or just the TVSC for the whole network.
|
|
|
Logged
|
Personal opinion only. Writings not representative of any union, collective, management or employer. (Think that absolves me...........)
|
|
|
DidcotPunter
|
|
« Reply #4 on: December 30, 2017, 16:46:41 » |
|
All the way down to Brizzle? That's a long way for Swindon (?). Is that as far as is planned, or are they empire building and going 'way down West'? Curious as to how many centres are planned, or just the TVSC» for the whole network.
TVSC is at Didcot (located behind the Foxhall car park). Someone more knowledgeable than me will correct me, but I think that TVSC is ultimately intended to cover from Paddington to the Severn Tunnel (English side) and down to Exeter, if not beyond. The South Wales Signalling Centre will cover west of the Severn Tunnel and I'm not sure what's planned for Devon and Cornwall.
|
|
|
Logged
|
|
|
|
Electric train
|
|
« Reply #5 on: December 30, 2017, 19:03:33 » |
|
All the way down to Brizzle? That's a long way for Swindon (?). Is that as far as is planned, or are they empire building and going 'way down West'? Curious as to how many centres are planned, or just the TVSC» for the whole network.
TVSC is at Didcot (located behind the Foxhall car park). Someone more knowledgeable than me will correct me, but I think that TVSC is ultimately intended to cover from Paddington to the Severn Tunnel (English side) and down to Exeter, if not beyond. The South Wales Signalling Centre will cover west of the Severn Tunnel and I'm not sure what's planned for Devon and Cornwall. The National plan is for ROC▸ 's (Regional Operation Centres) these have not only signallers and will include ECR (the ECR is located away from signallers and Ops staff) , also both TOC▸ and NR» operations teams co located Didcot was not one of the original ROC it has in effect grown into almost a ROC
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
Adelante_CCT
|
|
« Reply #6 on: December 30, 2017, 20:08:29 » |
|
... and I'm not sure what's planned for Devon and Cornwall.
Probably still arm signals and oil lamps
|
|
|
Logged
|
|
|
|
PhilWakely
|
|
« Reply #7 on: December 30, 2017, 21:10:14 » |
|
... and I'm not sure what's planned for Devon and Cornwall.
Probably still arm signals and oil lamps You forget the runner with the red flag
|
|
|
Logged
|
|
|
|
SandTEngineer
|
|
« Reply #8 on: December 30, 2017, 22:42:48 » |
|
... and I'm not sure what's planned for Devon and Cornwall.
Probably still arm signals and oil lamps Many a true word said in jest....... Devon and Cornwall has been put back into the long grass ( CP6▸ and beyond). The only work going on is described in a separate thread here: http://www.firstgreatwestern.info/coffeeshop/index.php?topic=17426.0 Exeter panel is likely to be one of the last but there are rumours that TVSC» is full and that Exeter panel will stay as a mini- ROC▸ and will control all of Devon and Cornwall and possibly a large part of Somerset.
|
|
« Last Edit: December 31, 2017, 09:11:39 by SandTEngineer »
|
Logged
|
|
|
|
Electric train
|
|
« Reply #9 on: December 31, 2017, 08:17:37 » |
|
Exeter panel is likely to be one of the last but there are rumours that TVSC» is full and that Exeter panel will stay as a mini-ROC▸ and will control all of Devon and Cornwall and possibly part of Somerset.
TVSC has morphed into a pseudo ROC, I can understand why there are rumors its full, it was only designed for the Thames Valley to allow for Reading Station redevelopment and Crossrail. There are rumours that even TBROC (Three Bridges ROC) will need replacing in CP 7/8 due to capacity The trend recently is to move ROC's into "Campuses" Basingstoke and York are examples of Campus these contain all the ROC functions plus most of the infrastructure management, train planning etc as well as training facilities for both NR» and TOC▸ . Back to Bristol ................... I don't think much has been done in the way of track layout and signalling since the move away from engine and coaches type trains to multiple unit type so is long over due
|
|
|
Logged
|
Starship just experienced what we call a rapid unscheduled disassembly, or a RUD, during ascent,”
|
|
|
SandTEngineer
|
|
« Reply #10 on: December 31, 2017, 09:14:58 » |
|
Back to Bristol ................... I don't think much has been done in the way of track layout and signalling since the move away from engine and coaches type trains to multiple unit type so is long over due
The track layout is not changing and the number of shunting movements stays as per the original 1970s layout. Remember its a recontrol not a resignalling.......
|
|
|
Logged
|
|
|
|
bobm
|
|
« Reply #11 on: December 31, 2017, 10:16:33 » |
|
This was TVSC» in May 2014. The Paddington workstation is to the right. At that stage the long term plan was the network would all be controlled from here with the workstations being arranged in a large horseshoe with the Penzance workstation being adjacent to the Paddington one.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #12 on: December 31, 2017, 10:25:43 » |
|
Oxford area goes into the TVSC» in July as well. There was once an idea to extend it by building another floor on stilts over the existing building. Surely they can save a lot of space by just giving each signaller an iPad and let them control the trains from home?
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
bobm
|
|
« Reply #13 on: December 31, 2017, 14:21:54 » |
|
...and then as the iPad batteries get older the trains will all run slower...
|
|
|
Logged
|
|
|
|
|