Several further changes: 17:30 Paddington to Taunton now 10-cars, together with return 21:28 Taunton to Paddington. 17:45 Paddington to Swansea now a 9-car. But, 17:15 Paddington to Carmarthen and 17:42 Paddington to Cheltenham now 5-cars. None of those changes have been made on JourneyCheck! IW906 1P07 Herefrd 04:47 Padton 07:52 1K04 Padton 08:06 Newbury 09:08 1K11 Newbury 09:23 Padton 10:21 1C89 Padton 16:33 Taunton 18:44 1A98 ExetrSD 19:56 Padton 22:37
NP128 1C01 Padton 05:07 Swansea 08:58 1L48 Swansea 09:29 Padton 12:30 1C15 Padton 13:00 BrstlTM 14:43 1A23 BrstlTM 15:30 Padton 17:12
1B69 Padton 17:45 Swansea 20:46 Now a 9-car
IW910 1A72 Plymth 05:53 Padton 09:02 1D20 Padton 09:50 Oxfd 10:49 1P26 Oxfd 12:00 Padton 12:59
1W02 Padton 17:22 Herefrd 20:29 Now 9-car as booked
1P51 Herefrd 21:51 WorcsSH 22:39 Now 9-car as booked
IW913 2T04 NAbt 07:06 Paigntn 07:27 1A12 Paigntn 07:48 Padton 11:39 1C81 Padton 12:33 Taunton 14:34 1A89 Taunton 15:33 Padton 17:53 1C93 Padton 18:33 ExeterSD 21:12
NP129 1L42 Cmthn 07:30 Padton 11:37 1B31 Padton 12:15 CrdfCen 14:21 1L68 CrdfCen 14:56 Padton 17:02
1C24 Padton 17:30 Taunton 20:31 Now a 10-car
1A37 Taunton 21:28 Padton 00:31 Now a 10-car
IW963 1A79 Penznce 06:47 Padton 12:21
1C82 Padton 13:03 Plymth 16:18 Now 10-car as booked
1A96 Plymth 16:57 Padton 20:37 Now 10-car as booked
1C98 Padton 21:03 Plymth 00:40 Now 10-car as booked
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
bobm
|
|
« Reply #2101 on: November 04, 2019, 17:53:30 » |
|
I was told, unofficially, so don't know if it was speculation that some units have had to be stopped to have their wheelsets checked after running through floodwater over the weekend.
|
|
|
Logged
|
|
|
|
Timmer
|
|
« Reply #2102 on: November 04, 2019, 18:48:59 » |
|
Indeed II it’s frustrating for those of us outside the rail industry that Journeycheck is all we have to go on and not helpful when it’s not correct.
Thank you for keeping us correctly informed throughout the day. Pleased to see long distance SW services and most peak time trains ended up with the correct number of carriages.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #2103 on: November 06, 2019, 12:59:49 » |
|
I was told, unofficially, so don't know if it was speculation that some units have had to be stopped to have their wheelsets checked after running through floodwater over the weekend.
Given that there were far fewer shortforms yesterday, and none today (so far) that looks like a distinctly possible explanation.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
grahame
|
|
« Reply #2104 on: November 06, 2019, 22:30:43 » |
|
.... some units have had to be stopped to have their wheelsets checked after running through floodwater over the weekend.
Could have been far worse - https://www.bbc.co.uk/news/world-asia-50323239
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
rogerw
|
|
« Reply #2105 on: November 07, 2019, 10:41:57 » |
|
At least 3 short forms today
|
|
|
Logged
|
I like to travel. It lets me feel I'm getting somewhere.
|
|
|
broadgage
|
|
« Reply #2106 on: November 07, 2019, 10:49:45 » |
|
At least 3 DIAGRAMS that is, over 20 SERVICES half length again.
|
|
|
Logged
|
A proper intercity train has a minimum of 8 coaches, gangwayed throughout, with first at one end, and a full sized buffet car between first and standard. It has space for cycles, surfboards,luggage etc. A 5 car DMU▸ is not a proper inter-city train. The 5+5 and 9 car DMUs are almost as bad.
|
|
|
bobm
|
|
« Reply #2107 on: November 07, 2019, 12:10:13 » |
|
Had various text alerts to say six services now back to full length but not reflected on Journeycheck again.
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #2108 on: November 07, 2019, 17:02:19 » |
|
Had various text alerts to say six services now back to full length but not reflected on Journeycheck again.
Indeed, at least some have been corrected on JourneyCheck now including the 16:45 PAD» - SWA» , the 17:00 PAD- TAU» , and the 17:18 PAD- OXF» . The 16:22 PAD-GMV is also a 9-car (802114), as is the return 19:42 GMV-PAD but both still showing 5 on JourneyCheck. That makes no shortforms this evening at all.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
TonyK
Global Moderator
Hero Member
Posts: 6594
The artist formerly known as Four Track, Now!
|
|
« Reply #2109 on: November 09, 2019, 20:56:10 » |
|
From that report: "We aim to restore 100% services [on the line] by the end of the current business year [in March]," Mr Fukasawa said. Four months to replace 10 trains, each 12-car, and capable of over 200 mph - impressive. Here, it would take longer to arrange the first inquiry into whether they were really needed.
|
|
« Last Edit: November 12, 2019, 22:23:27 by TonyK »
|
Logged
|
Now, please!
|
|
|
BBM
|
|
« Reply #2110 on: November 09, 2019, 21:20:34 » |
|
From that report: "We aim to restore 100% services [on the line] by the end of the current business year [in March]," Mr Fukasawa said. Four months to replace 10 trains, each 12-car, and capable of over 200 mph - impressive. Here, it would take longer to arrange the first inquiry into whether they were really needed. Without going too much off-topic, I understand that the 10 new trains were destined for another line and are nearing completion. The older trains on that other line will therefore have to soldier on for a while longer.
|
|
|
Logged
|
|
|
|
Oxonhutch
|
|
« Reply #2111 on: November 13, 2019, 07:49:17 » |
|
1A02, the 06:30 IET▸ from Didcot (ex-BTM▸ ) to Paddington short-formed of 5 cars today for the third day running. A busy train at the best of times particularly as it stops also at Slough on the Up Main. Today also quite delayed, first at Swindon and then Maidenhead where it had ended up behind 1P04, the 0708 up IET. I do hope this degraded service returns to normal PDQ.
|
|
|
Logged
|
|
|
|
nickswift99
|
|
« Reply #2112 on: November 13, 2019, 12:13:22 » |
|
1A02, the 06:30 IET▸ from Didcot (ex-BTM▸ ) to Paddington short-formed of 5 cars today for the third day running. A busy train at the best of times particularly as it stops also at Slough on the Up Main. Today also quite delayed, first at Swindon and then Maidenhead where it had ended up behind 1P04, the 0708 up IET. I do hope this degraded service returns to normal PDQ.
I think this will be fixed in December as the 0630 will no longer exist.
|
|
|
Logged
|
|
|
|
Oxonhutch
|
|
« Reply #2113 on: November 13, 2019, 12:56:54 » |
|
I think this will be fixed in December as the 0630 will no longer exist.
Unfortunately, there is a lot of commuting between now and 15th December
|
|
|
Logged
|
|
|
|
IndustryInsider
|
|
« Reply #2114 on: November 13, 2019, 14:20:54 » |
|
1A02, the 06:30 IET▸ from Didcot (ex-BTM▸ ) to Paddington short-formed of 5 cars today for the third day running. A busy train at the best of times particularly as it stops also at Slough on the Up Main. Today also quite delayed, first at Swindon and then Maidenhead where it had ended up behind 1P04, the 0708 up IET. I do hope this degraded service returns to normal PDQ.
Looks like it was delayed at Swindon detaching the rear portion which was stepped up to work 1G02, 06:40 Swindon to Cheltenham, with 1A02 then proceeding as a 5-car. Then it looks like it gained a further 5-cars at Paddington for its next working. Shows both the advantages and disadvantages of the 5-car fleet I suppose? A shortform of a busy train, thankfully corrected after just the one journey, but the ability to detach a portion at Swindon meaning that the 06:40 diagram could be covered without any cancellations.
|
|
|
Logged
|
To view my GWML▸ Electrification cab video 'before and after' video comparison, as well as other videos of the new layout at Reading and 'before and after' comparisons of the Cotswold Line Redoubling scheme, see: http://www.dailymotion.com/user/IndustryInsider/
|
|
|
|