grahame
|
|
« on: September 22, 2017, 19:49:01 » |
|
Spotted at Chippenham: HST▸ on the left, IEP▸ on the right As the IEP ramp is shorter, will the slope to the train be steeper, or is the floor lower?
|
|
|
Logged
|
Coffee Shop Admin, Chair of Melksham Rail User Group, TravelWatch SouthWest Board Member
|
|
|
JayMac
|
|
« Reply #1 on: September 22, 2017, 20:05:12 » |
|
Different platforms have different heights. So the slope to train varies across the network with existing ramps.
It'll be the same with new ramps, even if the floor of the IET▸ is lower.
|
|
|
Logged
|
"A clear conscience laughs at a false accusation." "Treat everyone the same until you find out they're an idiot." "Moral indignation is a technique used to endow the idiot with dignity."
|
|
|
Bmblbzzz
|
|
« Reply #2 on: September 22, 2017, 20:20:19 » |
|
Are these in addition to ramps on the trains or instead? I know I've seen ramps kept on board on different sorts of trains (I'm insufficiently geeky* to identify the train types, but eg smallish ones that go from Bristol to Malvern) but perhaps it varies according to type? I suppose platform storage means station staff can access them quicker and use them for any door; whereas train storage means they're available to train staff at unstaffed stations.
*That's geeky, a good thing, as opposed to nurdy, which is not good; just in case any train geeks were feeling insulted!
|
|
|
Logged
|
Waiting at Pilning for the midnight sleeper to Prague.
|
|
|
Tim
|
|
« Reply #3 on: November 07, 2017, 17:24:36 » |
|
Other new hardware spotted was a new information screen at (I think) Didcot. Able to show a diagram of the formation which is more necessary with the IEP▸ trains (IETs▸ ??) because depending on whether you have a 9, 5 or 5+5 coach set you will need to look in diferent places for first class or bike space.
|
|
|
Logged
|
|
|
|
ray951
|
|
« Reply #4 on: November 07, 2017, 21:00:21 » |
|
I have also seen 5 and 10 car station stop signs at Didcot Parkway.
|
|
|
Logged
|
|
|
|
Chris from Nailsea
|
|
« Reply #5 on: November 08, 2017, 00:43:15 » |
|
I'd rather like to see a couple of those installed at my local (main line) station. Not because we need them, or that they'd mean anything - but they'd give the impression that NLS is rather more grand than it is.
|
|
|
Logged
|
William Huskisson MP▸ was the first person to be killed by a train while crossing the tracks, in 1830. Many more have died in the same way since then. Don't take a chance: stop, look, listen.
"Level crossings are safe, unless they are used in an unsafe manner." Discuss.
|
|
|
Bmblbzzz
|
|
« Reply #6 on: November 08, 2017, 09:19:43 » |
|
Other new hardware spotted was a new information screen at (I think) Didcot. Able to show a diagram of the formation which is more necessary with the IEP▸ trains (IETs▸ ??) because depending on whether you have a 9, 5 or 5+5 coach set you will need to look in diferent places for first class or bike space.
That sounds very useful.
|
|
|
Logged
|
Waiting at Pilning for the midnight sleeper to Prague.
|
|
|
|
Bob_Blakey
|
|
« Reply #8 on: November 08, 2017, 09:48:24 » |
|
Train configuration information screens like this seem to be fairly common across the French railway network and I think they can be very useful.
|
|
|
Logged
|
|
|
|
Tim
|
|
« Reply #9 on: November 08, 2017, 14:22:48 » |
|
The platform ends at Paddington have acquired "S" signs on sticks between the tracks and facing the cab side windows. Presumable pulling into the platform fully before stopping is more important with the longer IEP▸ trains
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #10 on: November 08, 2017, 15:45:55 » |
|
Or levelling with platform-side water supplies
|
|
|
Logged
|
|
|
|
Tim
|
|
« Reply #11 on: November 08, 2017, 16:49:53 » |
|
Or levelling with platform-side water supplies
hadn't thought of that. Mind you the HSTs▸ also used these water supplies did they not and will they not be wrongly spaced for the new coach length?
|
|
|
Logged
|
|
|
|
chuffed
|
|
« Reply #12 on: November 08, 2017, 17:19:11 » |
|
Bring back water troughs (or track pans as they are called in the USA) and save the commuters having to shower BEFORE they arrive at the station !
|
|
|
Logged
|
|
|
|
chrisr_75
|
|
« Reply #13 on: November 08, 2017, 17:19:53 » |
|
Or levelling with platform-side water supplies
hadn't thought of that. Mind you the HSTs▸ also used these water supplies did they not and will they not be wrongly spaced for the new coach length? Hmmm, the humble hosepipe might just overcome this issue?!
|
|
|
Logged
|
|
|
|
ChrisB
|
|
« Reply #14 on: November 09, 2017, 13:57:09 » |
|
which are already attached....
|
|
|
Logged
|
|
|
|
|